← Back
Design Firm
CESO ARCHITECTS, INC.
Design · filed under 2 names
5 projects with open permitsBROOKLYN · 4MANHATTAN · 4BRONX · 2
10 buildings
38
Total Filings
12
Projects on File
10
Buildings Worked
5
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month12 projects all-time
0123Apr '22 · 2Jul '22 · 1Oct '22 · 1Jan '23 · 2Apr '23 · 2Apr '24 · 1Sep '24 · 1Jan '25 · 2202320242025
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit542%
Signed off758%
By project type
Alteration9
Alteration CO2
New Building1
Most active buildings
All buildings →
2505 BRUCKNER BOULEVARDBRONX · latest 01/10/2023
2 projects
54 21 STREETBROOKLYN · 2 open · latest 09/29/2026
2 projects
56 CROSBY STREETMANHATTAN · latest 05/05/2023
1 projects
1500 BROADWAYMANHATTAN · 1 open · latest 05/31/2023
1 projects
497 WEST 129 STREETMANHATTAN · latest 06/12/2024
1 projects
40 WEST 225 STREETMANHATTAN · latest 10/31/2023
1 projects
Jacob Bushlatest 03/11/2026
8 filings
BRADY HARDINGlatest 06/24/2025
6 filings
Filed under
CESO ARCHITECTS, INC.19CESO ARCHITECTS, INC19
Identified by the contact ids of the people who file for the firm and by its email domain (cesoinc.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01158787 ↗54 21 STREET
BROOKLYN
Alteration COPermit Issued01/20/202509/29/2026Structural filing as per plans filed
B08029013 ↗75 20 STREET
BROOKLYN
New BuildingPermit Issued10/31/202208/12/2026Support of Excavation as per plans filed
Q01103126 ↗30-02 WHITESTONE EXPWY
QUEENS
Alteration COPermit Issued09/10/202406/02/2026Structural modification as per plans filed herewith. Filed in conjunction with ALT1 CO (I1).
B01164299 ↗54 21 STREET
BROOKLYN
AlterationPermit Issued01/20/202502/24/2025temporary shoring as per plans filed
M01009771 ↗497 WEST 129 STREET
MANHATTAN
AlterationSigned-off04/08/202406/12/2024Interior Renovations to an existing Warehouse Building. No change to use, egress, or occupancy.
X08030374 ↗40 WEST 225 STREET
MANHATTAN
AlterationSigned-off04/11/202310/31/2023Interior tenant improvements of an existing grade level space located within a larger retail strip center
Counts cover all 12 projects (12 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Jacob Bush803/11/2026
BRADY HARDING606/24/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
LBI, LLC308/19/2026
BOHLER ENGINEERING NY PLLC204/21/2026
MCLAREN ENGINEERING GROUP204/16/2026
WHS ENGINEERING206/28/2023
CCPE108/19/2026
DESIMONE CONSULTING ENGINEERS104/21/2026
GEODESIGN INC. PC104/21/2026
GZA GEOENVIRONMENTAL OF NEW YORK104/21/2026
SCHAEFER INC108/19/2026
SMBH INC.106/28/2023
WW ENGINEERING PLLC104/21/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HUNTER ROBERTS CONSTRUCTI304/21/2026
DONATO PLUMBING GROUP INC204/21/2026
NORTHEAST SPECIALIST GROU204/16/2026
RETAIL CONSTRUCTION SVCS206/28/2023
THE WHITING-TURNER CONTRA208/24/2023
AARON PLBG AND MECH SYST101/26/2023
ACCORD CONTR AND MGMT COR104/27/2022
DEVEGA CONTRACTING LTD108/19/2026
IRWIN & LEIGHTON INC110/01/2024
KG SPRINKLER CORP104/21/2026
L.L.G. PLBG & HTG INC108/19/2026
RJB CONTRACTING INC104/11/2023
STAT FIRE SPRINKLER NYC C108/19/2026
TRI-NORTH BUILDERS,INC107/25/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BRIDGE DEVELOPMENT PARTNERS, LLC304/21/2026
1250 38 STREET LLC107/25/2022
CBRE106/28/2023
GGP STATEN ISLAND MALL LLC101/26/2023
TRIANGLE EQUITIES108/19/2026
ZE 129 LLC110/01/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JM ZONING, LLC.304/21/2026
DOMINION EXPEDITING206/28/2023
A1 EXPEDITING SERVICE CORP.110/01/2024
JAM CONSULTANTS, INC.107/25/2022
12 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 12Open permit 5Signed off 7
Any typeAlteration 9Alteration CO 2New Building 1
12 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01158787 ↗54 21 STREET
BROOKLYN
Alteration COPermit Issued01/20/202509/29/2026Structural filing as per plans filed
B08029013 ↗75 20 STREET
BROOKLYN
New BuildingPermit Issued10/31/202208/12/2026Support of Excavation as per plans filed
Q01103126 ↗30-02 WHITESTONE EXPWY
QUEENS
Alteration COPermit Issued09/10/202406/02/2026Structural modification as per plans filed herewith. Filed in conjunction with ALT1 CO (I1).
B01164299 ↗54 21 STREET
BROOKLYN
AlterationPermit Issued01/20/202502/24/2025temporary shoring as per plans filed
M01009771 ↗497 WEST 129 STREET
MANHATTAN
AlterationSigned-off04/08/202406/12/2024Interior Renovations to an existing Warehouse Building. No change to use, egress, or occupancy.
X08030374 ↗40 WEST 225 STREET
MANHATTAN
AlterationSigned-off04/11/202310/31/2023Interior tenant improvements of an existing grade level space located within a larger retail strip center
B00689038 ↗773 GRAND STREET
BROOKLYN
AlterationSigned-off07/25/202206/12/2023TENANT IMPROVEMENTS OF AN EXISTING FIRST FLOOR LEASE SPACE, WITHIN A MIXED USE BUILDING AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANGE IN …
M00700543 ↗1500 BROADWAY
MANHATTAN
AlterationPermit Issued04/27/202205/31/2023Filing herewith application for interior build out of a retail space. No change in use, egress or occupancy.
M00843639 ↗56 CROSBY STREET
MANHATTAN
AlterationSigned-off04/06/202305/05/2023
Owner CBRE INC.
Structural work related to General Interior renovation of existing Retail space to become Cotton On Mega. No change to use, egress or occupa…
X08031584 ↗2505 BRUCKNER BOULEVARD
BRONX
AlterationSigned-off01/03/202301/10/2023Renovations including removal and installation of non-load bearing partitions, fixtures and finishes as per plans filed herewith. No change …
X08032809 ↗2505 BRUCKNER BOULEVARD
BRONX
AlterationSigned-off01/03/202301/09/2023Filed herewith civil site work filed as per plans filed herewith. No change to use, egress, or occupancy.
S00704142 ↗2655 RICHMOND AVENUE
STATEN ISLAND
AlterationSigned-off04/28/202206/03/2022Minor structural work filed in conjunction with General renovation of existing retail space #2085 to be known as Cotton On Kids. No change t…
Scope of Work
HVAC — 4 projects · most recent 08/19/2026
Heating Systems Heating and Air Conditioning Systems Air Conditioning Systems
Sprinkler / Standpipe — 1 project · most recent 08/19/2026
Sprinkler System
Plumbing — 3 projects · most recent 08/19/2026
Water/Sanitary Gas Storm
Electrical — 2 projects · most recent 04/23/2026
General Wiring
Structural — 4 projects · most recent 08/19/2026
Steel Concrete
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
54 21 STREET ↗703/11/2026
30-02 WHITESTONE EXPWY ↗708/26/2025
75 20 STREET ↗605/13/2025
497 WEST 129 STREET ↗309/27/2024
56 CROSBY STREET ↗306/06/2023
2655 RICHMOND AVENUE ↗303/22/2022
773 GRAND STREET ↗102/28/2022
2505 BRUCKNER BOULEVARD ↗6—
1500 BROADWAY ↗1—
40 WEST 225 STREET ↗1—
▾Documents — 442 on file (BIS + DOB NOW)
▸Plans & Drawings67
▸DOB NOWPlans/Sketch67
09/02/2026M00700543-I1 · 1500 BROADWAYRequest digital key ↗
08/31/2026M00843639-S1 · 56 CROSBY STREETRequest digital key ↗
08/31/2026M00843639-P2 · 56 CROSBY STREETRequest digital key ↗
Showing 3 of 67 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit6
08/31/2026M00843639-P2 · 56 CROSBY STREETOpen ↗
08/31/2026M00843639-I1 · 56 CROSBY STREETOpen ↗
08/31/2026M00843639-S1 · 56 CROSBY STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Stormwater Construction Permit6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWHouse Number Verification: TOPO Stamp7
09/01/2026Q01103126-I1 · 30-02 WHITESTONE EXPWYOpen ↗
Showing 1 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWZD1 DOB Zoning Diagram1
09/01/2026B08029013-I1 · 75 20 STREETOpen ↗
▸Seals & Professional Certifications275
▸DOB NOWProgress Inspector Seal & Signature125
09/07/2026B00689038-I1 · 773 GRAND STREETOpen ↗
09/07/2026B00689038-I1 · 773 GRAND STREETOpen ↗
09/07/2026B00689038-I1 · 773 GRAND STREETOpen ↗
Showing 3 of 125 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature83
09/07/2026B00689038-I1 · 773 GRAND STREETOpen ↗
09/02/2026M00843639-P3 · 56 CROSBY STREETOpen ↗
09/01/2026Q01103126-P6 · 30-02 WHITESTONE EXPWYOpen ↗
Showing 3 of 83 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature67
09/02/2026M00700543-I1 · 1500 BROADWAYOpen ↗
08/31/2026M00843639-P2 · 56 CROSBY STREETOpen ↗
08/31/2026M00843639-I1 · 56 CROSBY STREETOpen ↗
Showing 3 of 67 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist10
09/01/2026B08029013-I1 · 75 20 STREETOpen ↗
Showing 1 of 10 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/02/2026M00700543-I1 · 1500 BROADWAYOpen ↗
08/31/2026M00843639-I1 · 56 CROSBY STREETOpen ↗
08/31/2026M00843639-S1 · 56 CROSBY STREETOpen ↗
Showing 3 of 17 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00689038-I1 · 773 GRAND STREETOpen ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents21
▸DOB NOWProperty Ownership Certification6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProof of Historic Building2
08/31/2026M00843639-I1 · 56 CROSBY STREETOpen ↗
Showing 1 of 2 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type