← Back
One family attached or semi-detached
30-26 78 STREET
QUEENS · Jackson Heights · BIN 4024918
💬 Discuss this project
1955Year Built
2Stories
A5Building Class
R4Zoning
2,035 sfGross Floor Area
1Units
One family attached or semi-detached · Owner of record: ZHENG, NA · 2,000 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Basement11p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2025$970K—— → —$477/sf building
11/12/2021$35K—— → —$17/sf building
08/27/2021$35K—— → —$17/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC312/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor303/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376312/09/2025
Building Lifecycle
All (43)Filed (3)Permit Issued (2)Signed Off (2)Inspection (10)Objection (6)Special Inspection (20)
02/03/2026
Signed off — Alteration CO
PROPOSED PLUMBING WORK ON OPEN SPACE, BASEMENT, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION CO JOB #; Q01225813-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01225813-I1
01/09/2026
Signed off — Alteration CO
PROPOSED PLUMBING WORK ON OPEN SPACE, BASEMENT, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION CO JOB #; Q01225813-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01225813-S3
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2025
Special inspection requirement — Maintenance information
Jian Yang
12/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
12/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
12/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
12/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
12/09/2025
Filed — Alteration CO
PROPOSED PLUMBING WORK ON OPEN SPACE, BASEMENT, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION CO JOB #; Q01225813-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01225813-P2
12/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/12/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/06/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/28/2025
Permit issued — Plumbing
Q01225813-S3-PL
07/24/2025
Permit issued — General Construction
Q01225813-I1-GC
07/16/2025
Filed — Alteration CO
PROPOSED PLUMBING WORK ON OPEN SPACE, BASEMENT, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION CO JOB #; Q01225813-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01225813-S3
07/08/2025
Objection resolved — Addressed
07/02/2025
Special inspection requirement — Air barrier — testing
Jian Yang
07/02/2025
Special inspection requirement — Metering
Jian Yang
07/02/2025
Special inspection requirement — Electric vehicle service equipment requirements
Jian Yang
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
05/28/2025
Objection raised — Other
05/23/2025
Objection raised — Admin
05/23/2025
Objection raised — Admin
05/15/2025
Filed — Alteration CO
PROPOSED PLUMBING WORK ON OPEN SPACE, BASEMENT, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION CO JOB #; Q01225813-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01225813-I1
05/14/2025
Special inspection requirement — Air barrier - visual inspection
Jian Yang
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
05/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
05/14/2025
Special inspection requirement — Insulation placement and R values
Jian Yang
05/14/2025
Special inspection requirement — Permanent certificate
Jian Yang
05/14/2025
Special inspection requirement — Interior lighting power
Jian Yang
05/14/2025
Special inspection requirement — Fenestration air leakage
Jian Yang
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
05/14/2025
Special inspection requirement — Fenestration areas
Jian Yang
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS07/28/2025
DOB NOWGeneral ConstructionPermit IssuedWINWAY DEVELOPMENT LLC07/24/2025
1 project · most recent 12/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/09/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
2 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
11/08/2022CompleteINTELOGIC ELECTRIC, INC.—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/06/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/10/2025Maintenance informationJian Yangenergy_progress
12/10/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
12/10/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
12/10/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
12/10/2025Tenant Protection Plan ComplianceJian Yangspecial
12/10/2025Fire-Resistant Penetrations and JointsJian Yangspecial
12/10/2025Energy Code Compliance InspectionsJian Yangprogress
07/02/2025Air barrier — testing Jian Yangenergy_progress
07/02/2025MeteringJian Yangenergy_progress
07/02/2025Electric vehicle service equipment requirementsJian Yangenergy_progress
05/14/2025Air barrier - visual inspectionJian Yangenergy_progress
05/14/2025Energy Code Compliance InspectionsJian Yangprogress
05/14/2025Fire-Resistance Rated ConstructionJian Yangprogress
05/14/2025Insulation placement and R valuesJian Yangenergy_progress
05/14/2025Permanent certificateJian Yangenergy_progress
05/14/2025Interior lighting powerJian Yangenergy_progress
05/14/2025Fenestration air leakageJian Yangenergy_progress
05/14/2025Fire-Resistant Penetrations and JointsJian Yangspecial
05/14/2025Fenestration and door U-factor and product ratingsJian Yangenergy_progress
05/14/2025Fenestration areasJian Yangenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01225813-P2Request digital key ↗
08/18/2026Q01225813-S3Request digital key ↗
08/18/2026Q01225813-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01225813-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q01225813-S3Open ↗
09/02/2026Q01225813-S3Open ↗
08/23/2026Q01225813-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01225813-S3Open ↗
08/18/2026Q01225813-P2Open ↗
08/18/2026Q01225813-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01225813-S3Open ↗
08/23/2026Q01225813-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01225813-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q01225813-S3Open ↗
08/18/2026Q01225813-P2Open ↗
08/18/2026Q01225813-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01225813-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01225813-I1Open ↗