| Owner | Filings | Most Recent |
|---|---|---|
| ROSE ASSOCIATES | 17 | 09/22/2026 |
| 111 WALL GC | 5 | 09/01/2026 |
| TRIBECA ASSOC | 109 | 07/08/2026 |
| STATE CONTRACTING CORP | 2 | 04/09/2026 |
| CBRE | 6 | 03/22/2026 |
| STATE CONTRACTING CORP OF NY | 2 | 03/22/2026 |
| 30 BROAD STREET VENTURES LLC | 237 | 03/22/2026 |
| CENTRAL CONSTRUCTION MANA | 2 | 03/22/2026 |
| IRS | 1 | 03/22/2026 |
| C/O TRIBECA ASSOCIATES,LL | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/01/2016 | $130.0M | — | GOTHAM BROAD, LLC → 30 BROAD STREET VENTURE LLC | $351/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| GENSLER | 3 | 08/24/2026 |
| SOCOTEC, INC. | 1 | 07/30/2026 |
| KIEFER & SCHUSTER ENGINEERING PLLC | 3 | 04/01/2026 |
| FMC ENGINEERING, PC | 7 | 03/31/2026 |
| BITOPI CONSULTANTS LLC | 1 | 01/29/2026 |
| MARCO GIARDINA ARCHITECTURE, PLLC | 2 | 02/05/2025 |
| CONCESSI ENGINEERING, P.C. | 17 | 12/28/2024 |
| CANY ARCHITECTURE & ENGINEERING DPC | 3 | 10/07/2024 |
| KDV DESIGNS ARCHITECTS LLC | 1 | 12/12/2023 |
| ROBERT GERMAIN JR. PE | 2 | 08/14/2023 |
| NICHOLAS J. DEFELICE, P.E. | 6 | 05/26/2023 |
| MONTROY ARCHITECTURE PLLC | 5 | 01/24/2023 |
| ST ENGINEERING SERVICES LLP | 2 | 06/02/2022 |
| COSENTINI ASSOCIATES | 23 | 02/22/2022 |
| C3D ARCHITECTURE PLLC | 1 | 09/05/2021 |
| MICHAEL L. PINSKE | 1 | 03/11/2019 |
| A&B WORLD CONSULTING | 1 | 02/19/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 5 | 03/21/2026 |
| KD DESIGNS | 1 | 03/21/2026 |
| MP DESIGN AND CONSTRUCTION | 32 | 03/21/2026 |
| CH BUILDING CONSULTANTS | 14 | 03/21/2026 |
| Y A CONSULTING EXPEDITING | 6 | 03/21/2026 |
| GILLMAN CONSULTING | 64 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| ACCESS PLUMBING | 2 | 03/21/2026 |
| TBC & ASSOC. | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| UNITED BUILDERS GROUP LLC | General Contractor | 32 | 07/08/2026 |
| CENTRAL CONSTRUCTION MANAGEMENT | General Contractor | 23 | 07/08/2026 |
| IGON CONSTRUCTION & MAINT | General Contractor | 9 | 07/08/2026 |
| DV PLUMBING INC | Plumbing | 8 | 07/08/2026 |
| FLOW-RIGHT FIRE SUPP CORP | Fire Protection | 7 | 07/08/2026 |
| CHRISTOPHER EPP | Electrical | 5 | 03/21/2026 |
| RC3 ELECTRIC, LLC | General Contractor | 4 | 07/08/2026 |
| MARINE SERVICES GROUP LLC | Fire Protection | 3 | 09/22/2026 |
| MASTER FIRE MECH CORP | General Contractor | 3 | 03/21/2026 |
| STATE CONTRACTING CORP NY | General Contractor | 3 | 06/27/2026 |
| DUAL FUEL COMPANY LLC | General Contractor | 3 | 03/21/2026 |
| CONDUCTOR ELECL SVCS INC | Electrical | 3 | 03/22/2026 |
| NATIONS ROOF EAST, LLC | General Contractor | 3 | 03/21/2026 |
| POWER SURGE ELECTRIC, INC | Electrical | 2 | 03/22/2026 |
| PEBBLE CRAFT INC | General Contractor | 2 | 07/08/2026 |
| LUMITECH CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| MARINE PLUMBING & MECH IN | Plumbing | 2 | 09/22/2026 |
| SOURCE ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| M&G PLUMBING AND HEATING | Plumbing | 1 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 1 | 07/08/2026 |
| FIREQUEST CORP | Fire Protection | 1 | 07/08/2026 |
| ALED TECHNOLOGIES INC | General Contractor | 1 | 07/08/2026 |
| KONTOROUHAS EMANUEL | Electrical | 1 | 03/21/2026 |
| HOWARD ZAMKOFF | Electrical | 1 | 03/21/2026 |
| TITANIUM CONSTRUCTION SER | General Contractor | 1 | 08/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DOMANI INSPECTION SERVICE | 843 | 4 | 08/24/2026 |
| CONCESSI ENGINEERING, P.C | 540 | 10 | 12/28/2024 |
| SAG ENGINEERING & CONSULT | 608 | 24 | 10/07/2024 |
| NS ENGINEERING & CONSULTI | 3652 | 1 | 12/12/2023 |
| ROBERT F. GERMAIN JR. PE | 5100 | 2 | 08/14/2023 |
| STE | 5741 | 1 | 06/02/2022 |
| ELEVATED ENGINEERING PLLC | 3692 | 1 | 03/11/2019 |
| A&B WORLD CONSULTING, INC | 5704 | 1 | 02/19/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | MARINE SERVICES GROUP LLC | 09/21/2026 |
| DOB NOW | Plumbing | Permit Issued | MARINE PLUMBING & MECH IN | 09/21/2026 |
| DOB NOW | General Construction | Permit Issued | TITANIUM CONSTRUCTION SER | 08/21/2026 |
| DOB NOW | General Construction | Permit Issued | VEMA GROUP LLC | 06/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | MARINE SERVICES GROUP LLC | 03/31/2026 |
| DOB NOW | Construction Fence | Permit Issued | STATE CONTRACTING CORP NY | 01/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | MARINE SERVICES GROUP LLC | 01/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STATE CONTRACTING CORP NY | 12/31/2025 |
| DOB NOW | Plumbing | Permit Issued | MARINE PLUMBING & MECH IN | 12/31/2025 |
| DOB NOW | General Construction | Permit Issued | STATE CONTRACTING CORP NY | 12/16/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 11/24/2025 |
| DOB NOW | General Construction | Signed-off | IGON CONSTRUCTION MAINT | 11/07/2024 |
| DOB NOW | General Construction | Permit Issued | ALED TECHNOLOGIES INC | 10/24/2024 |
| DOB NOW | General Construction | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 10/03/2024 |
| DOB NOW | General Construction | Signed-off | NATIONS ROOF EAST, LLC | 10/02/2024 |
| DOB NOW | Plumbing | Signed-off | M.A.C. PLUMBING, INC | 09/25/2024 |
| DOB NOW | General Construction | Permit Issued | LUMITECH CONTRACTING CORP | 09/25/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 09/10/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 08/14/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 03/21/2024 |
| DOB NOW | General Construction | Permit Issued | IGON CONSTRUCTION MAINT | 02/02/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | MASTER FIRE MECH CORP | 12/13/2023 |
| DOB NOW | Sprinklers | Signed-off | M&G PLUMBING AND HEATING | 10/12/2023 |
| DOB NOW | Plumbing | Permit Issued | ACCURATE MECHANICAL INC | 10/12/2023 |
| DOB NOW | General Construction | Permit Issued | IGON CONSTRUCTION MAINT | 10/06/2023 |
| DOB NOW | General Construction | Permit Issued | IGON CONSTRUCTION MAINT | 10/06/2023 |
| DOB NOW | Structural | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 08/31/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 08/29/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 08/29/2023 |
| DOB NOW | Structural | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 08/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | DUAL FUEL COMPANY LLC | 06/22/2023 |
| DOB NOW | General Construction | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 04/10/2023 |
| DOB NOW | Structural | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 03/17/2023 |
| DOB NOW | General Construction | Signed-off | CENTRAL CONSTRUCTION MANAGEMENT | 03/11/2023 |
| DOB NOW | Structural | Permit Issued | IGON CONSTRUCTION MAINT | 03/03/2023 |
| DOB NOW | General Construction | Permit Issued | IGON CONSTRUCTION MAINT | 03/01/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 01/13/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | CENTRAL CONSTRUCTION MANAGEMENT | 12/29/2022 |
| DOB NOW | Plumbing | Signed-off | METRO INCORPORATED | 06/07/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | PEBBLE CRAFT INC | 06/07/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/24/2026 | Permit Issued | TITANIUM CONSTRUCTION SER | Heating and Air Conditioning Systems | Heat / Cool Samsung AG010KSVAFH 10 tons · Vrf Outdoor ×16 AM036FEZDCG/AA 36,000 BTU · Vrf Indoor ×4 AM036FXMDCH/AA 38,000 BTU · Vrf Indoor ×2 AM048FEZDCG/AA 36,000 BTU · Vrf Indoor ×2 AM048FXMDCH/AA 48,000 BTU · Vrf Indoor ×1 AM144HCVGFG/AA 138,000 BTU · Vrf Outdoor ×1 AR24DXDABWKXCV 22,000 BTU · Condensing Unit ×1 Mammoth W-2-13i-WW-X-X-WSHP0504-P 683,600 BTU · Wshp ×1 |
| 01/16/2026 | Permit Issued | STATE CONTRACTING CORP NY | Others | Other N/A n/a ×1 |
| 12/28/2024 | Permit Issued | ALED TECHNOLOGIES INC | Air Conditioning Systems | Cooling Samsung AM036BN4PCH 900 CFM · Vrf Indoor ×12 AM072HXWWAFR 69,000 BTU · Vrf Outdoor ×6 AM018AN1PCH 500 CFM · Vrf Indoor ×3 |
| 12/12/2023 | Permit Issued | MASTER FIRE MECH CORP | Ventilation Systems | Ventilation Giles MODEL # FSH-6 C/A# 5701 940 CFM · Kitchen Exhaust ×1 |
| 05/09/2023 | Permit Issued | IGON CONSTRUCTION & MAINT | Associated Ducts and Piping, Heating and Air Conditioning Systems | Heat / Cool __Junk__ EXISTING EQUIPMENT 1 CFM ×1 Ducts & Piping Not Applicable NO APPLICABLE 1 CFM · Ductwork ×1 |
| 06/02/2022 | Permit Issued | PEBBLE CRAFT INC | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PLFY-EP30NEMU-ER1 800 CFM · Vrf Indoor ×2 PUMY-EP30NEMU-ER1 5 tons · Vrf Outdoor ×1 Ventilation Greenheck CSP-A-3300-VG 1,000 CFM · Exhaust Fan ×1 |
| 02/22/2022 | Permit Issued | UNITED BUILDERS GROUP LLC | Associated Ducts and Piping | Ducts & Piping |
| 07/09/2020 | Permit Issued | UNITED BUILDERS GROUP LLC | Ventilation Systems | Ventilation Greenheck SQ-80-VG 250 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | — | — | Sprinkler System |
| 01/16/2026 | Permit Issued | MARINE SERVICES GROUP LLC | Sprinkler System |
| 12/28/2024 | — | — | Sprinkler System |
| 05/25/2023 | Permit Issued | ACCURATE MECHANICAL INC | 37 heads |
| 11/30/2021 | Permit Issued | FLOW-RIGHT FIRE SUPP CORP | 13 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | — | — | Storm, Water/Sanitary |
| 01/16/2026 | Permit Issued | MARINE PLUMBING & MECH IN | Water/Sanitary |
| 12/28/2024 | Signed-off | 23 E&S GROUP PLBG&HTG INC | Water/Sanitary |
| 05/25/2023 | Signed-off | M&G PLUMBING AND HEATING | Water/Sanitary |
| 06/02/2022 | Signed-off | METRO INCORPORATED | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Permit Issued | SOURCE ELECTRIC INC | — |
| 07/04/2025 | Complete | TITANIUM ELECTRICAL CORP | 1 meters, 1 new_meters |
| 03/07/2023 | Complete | CONDUCTOR ELECL SVCS INC | — |
| 04/28/2022 | Permit Issued | ECS ELEC'L CONTG SERV INC | General Wiring |
| 01/21/2022 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 12/13/2021 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 09/09/2021 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 09/06/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 08/19/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 07/12/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | — |
| 02/22/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 01/27/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | — |
| 01/08/2020 | Permit Issued | POWER SURGE ELECTRIC, INC | — |
| 11/22/2019 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 11/19/2019 | Complete | CONDUCTOR ELECL SVCS INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | Permit Issued | TITANIUM CONSTRUCTION SER | Steel, Concrete |
| 04/01/2026 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/29/2026 | Permit Issued | STATE CONTRACTING CORP NY | Fence |
| 05/26/2023 | Permit Issued | CENTRAL CONSTRUCTION MANA | Scaffold |
| 12/21/2022 | Permit Issued | CENTRAL CONSTRUCTION MANA | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/18/2025 | Permit Issued | SKYLINE ACCESS LLC | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/24/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 01/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/19/2024 | Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish | Certified | View ↗ |
| 12/19/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/19/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/14/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/13/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/18/2022 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/17/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/12/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/06/2022 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/06/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/29/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/20/2021 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/11/2021 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/24/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 08/20/2026 | Air barrier - visual inspection | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Fenestration and door U-factor and product ratings | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Fenestration air leakage | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Insulation placement and R values | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Electrical motors and elevators | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Exterior lighting power | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Fenestration areas | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Lighting controls | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Interior lighting power | JOHN MCMONAGLE | energy_progress |
| 08/20/2026 | Lighting in dwelling units | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Lighting in dwelling units | — | energy_progress |
| 08/14/2026 | Lighting controls | — | energy_progress |
| 08/14/2026 | Interior lighting power | — | energy_progress |
| 08/14/2026 | Exterior lighting power | — | energy_progress |
| 07/28/2026 | Masonry | — | special |
| 07/28/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 07/28/2026 | Fenestration air leakage | — | energy_progress |
| 07/28/2026 | Air barrier - visual inspection | — | energy_progress |
| 07/28/2026 | Fenestration areas | — | energy_progress |
| 07/28/2026 | Energy Code Compliance Inspections | — | progress |
| 07/28/2026 | Final | — | progress |
| 05/04/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Complete Playground | Office | Sub-cellar, Floors 1, 2, Mezzanine | Project M01039406 Project M01025581 Project M00856469 Project M00856474 Project M00855162 |
| Serafina | Restaurant / Food Service | Floor 1 | Project M00730665 Project M00730679 Project M00583518 |
| Graphnet | Office | Floor 26 | Project M00320214 |