← Back
BuildNYC
Walk-up apt, over six families with stores
30 WEST 183RD STREET
BRONX · BIN 2014215
💬 Discuss this project
1926Year Built
5Stories
C7Building Class
R7AZoning
38,920 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized116 Active Violations 115 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 2265 Davidson Realty · 10,000 sf lot · 3.89 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVentilation system for new restaurant kitchen1 filing · 5 docs
Floor 1Crab King Food1p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2265 Davidson Reality1103/22/2026
Grant Concourse Davidson Associates303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anthony Somefun103/14/2025
Anurag Upadhyay P.E107/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch203/21/2026
Aegis Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Doval Plumbing & HeatingPlumbing507/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Superior - Home Inspectio1804103/14/2025
DY Special Inspection7210107/27/2021
Building Lifecycle
All (87)Filed (2)Permit Issued (2)Violation (60)Inspection (3)Objection (14)Special Inspection (6)
08/09/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (HPD, open)
C
06/26/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, open)
C
05/18/2026
Violation issued (HPD, open)
C
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
C
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
C
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
B
12/15/2025
Violation issued (HPD, closed)
B
12/15/2025
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
A
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
B
12/15/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/02/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, open)
B
10/15/2025
Violation issued (HPD, closed)
A
10/15/2025
Violation issued (HPD, open)
B
10/15/2025
Violation issued (HPD, open)
B
10/15/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, open)
C
09/21/2025
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating08/14/2025
DOB NOWPlumbingPermit IssuedCatman Plumbing08/06/2021
BISBLISSUEDCam Energy Heating and Mechanical04/01/2019
BISFSISSUEDCam Energy Heating and Mechanical12/15/2018
BISPLISSUEDCam Energy Heating and Me12/15/2018
BISOTISSUEDKing World Enterprises08/12/2015
BISPLISSUEDBell Fuel Oil12/27/2012
BISFSISSUEDAbilene12/27/2012
BISOTISSUEDJaj Family Contractor05/27/2011
BISOTRE-ISSUEDB & P Plumbing & Heating Co04/01/2003
BISPLRE-ISSUEDClean Tech Mechanical12/23/2002
BISPLISSUEDClean Tech Mechanical06/21/2002
BISFPISSUEDCity Fire Control Inc. T05/01/1992
BISPLISSUEDMike Catsimalis Plumbing & Heating02/28/1992
BISEQISSUEDOlympus General Contracting02/05/1992
BISOTISSUEDOlympus General Contracting02/05/1992
1 project · most recent 03/14/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/14/2025——Ventilation Systems
Ventilation
Marathon LVC184TTFC1026 4,800 CFM · Exhaust Fan ×1
1 project · most recent 07/27/2021
FiledStatusContractorScope
07/27/2021——2 heads
1 project · most recent 07/27/2021
Gas Water/Sanitary
FiledStatusContractorScope
07/27/2021Permit IssuedDoval Plumbing & HeatingGas, Water/Sanitary
3 projects · most recent 04/14/2026
Boiler Controls
FiledStatusContractorScope
04/14/2026Permit IssuedJ.A. Electric Inc D/B/A Midwa1 meters
11/14/2019CompleteR.C.M. ElectricBoiler Controls
09/18/2019CompleteJ.A. Electric Inc D/B/A Midwa—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/04/2025Tenant Protection Plan ComplianceSteven Williamsspecial
01/30/2025Mechanical SystemsSteven Williamsspecial
01/30/2025FinalANTHONY Somefunprogress
07/26/2021HVAC-R and service water piping design and insulationTHOMAS TUNGenergy_progress
07/26/2021Fire-Resistant Penetrations and JointsTHOMAS TUNGspecial
07/26/2021Energy Code Compliance InspectionsTHOMAS TUNGprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Crab King FoodRestaurant / Food ServiceFloor 1
Project X00561039 Alteration · Permit Entire · 07/27/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00561039-I1Request digital key ↗
08/20/2026X01174117-I1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION16
12/23/2019220658740Open ↗
04/01/2019240240609Open ↗
04/01/2019240240609Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
09/30/2019240240609Open ↗
09/24/2019240240609Open ↗
09/24/2019240240609Open ↗
Showing 3 of 9 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
08/22/2014220242994Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/20/2019220658740Open ↗
10/28/2014220412480Open ↗
12/07/2012220242994Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026X00561039-I1Open ↗
09/01/2026X00561039-I1Open ↗
09/01/2026X01174117-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/15/2018240240609Open ↗
10/28/2014220412480Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/28/2014220412480Open ↗
12/07/2012220242994Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00561039-I1Open ↗
08/13/2026X01174117-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X00561039-I1Open ↗
09/01/2026X01174117-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/07/2012220242994Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/15/2018240240609Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/15/2018240240609Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
10/15/2018240240609Open ↗
12/07/2012220242994Open ↗
12/23/2010220098418Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/15/2018240240609Open ↗
12/07/2012220242994Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/30/2019240240609Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
10/28/2019220658740Open ↗
09/20/2019220658740Open ↗
10/15/2018240240609Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/20/2019220658740Open ↗
10/15/2018240240609Open ↗
12/07/2012220242994Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00561039-I1Open ↗
08/13/2026X01174117-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/23/2010220098418Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/12/2020240240609Open ↗
06/23/2020220658740Open ↗
10/15/2018240240609Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/20/2019220658740Open ↗
12/07/2012220242994Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/12/2020240240609Open ↗
06/23/2020220658740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/15/2018240240609Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/06/2020240240609Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/12/2020240240609Open ↗
06/23/2020220658740Open ↗
10/15/2018240240609Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/12/2020240240609Open ↗
06/23/2020220658740Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/07/2012220242994Open ↗
12/23/2010220098418Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/23/2019220658740Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
10/28/2019220658740Open ↗
09/20/2019220658740Open ↗
10/15/2018240240609Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/12/2020240240609Open ↗
06/23/2020220658740Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
12/14/2018240240609Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
09/20/2019220658740Open ↗
10/28/2014220412480Open ↗
12/07/2012220242994Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
09/24/2019240240609Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/15/2018240240609Open ↗