Office with commercial, 7-19 stories
30 WEST 26TH STREET
MANHATTAN · BIN 1015629
💬 Discuss this project
1909Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
88,000 sfGross Floor Area
25Units
LL97 Covered2 Active Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 30W26 Land · 6,970 sf lot · 12.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHKS16p · 1 filing · 14 docs
Floor 12HKS13p · 3 filings · 20 docs
Floor 11
Floor 10
Floor 930 West 26th Street Associates LLC6p · 1 filing · 7 docs
Floor 830 West 26th Street Associates LLC5p · 1 filing · 7 docs
Floor 7Samsung Research America46p · 1 filing · 20 docs
Floor 630 West 26th Street Associates LLC24p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 230 West 26th Street Associates LLC13p · 3 filings · 15 docs
Floor 1Hill Country BBQ &Under Construction6p · 1 filing · 7 docs
CellarHill Country BBQ &Under Construction4p · 1 filing · 7 docs
Site & exteriorJerrick Associates, INC.15p · 5 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
30 West 26th St Associates17407/08/2026
Meringoff Properties3207/08/2026
Jerrick Associates1807/08/2026
729 Acquisition203/21/2026
30W26 Land103/22/2026
30 West 26103/21/2026
Hill Country Holdings103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group2803/21/2026
M-Dis Design Group503/21/2026
EA Design Group803/21/2026
AE Design Solution803/21/2026
William Vitacco Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold1107/08/2026
Everest ScaffoldingScaffold507/08/2026
Clune Construction CoGeneral Contractor407/08/2026
Opc ManagementGeneral Contractor407/08/2026
UnisolGeneral Contractor307/08/2026
Gregg NY PlumbingPlumbing207/08/2026
MetroPlumbing207/08/2026
FirequestFire Protection207/08/2026
R.J.C. MechanicalPlumbing106/28/2026
Lippolis ElectricElectrical103/21/2026
RRP PlumbingPlumbing107/08/2026
Falco Electrical ServicesElectrical103/22/2026
Falco Electrical ServicesElectrical103/21/2026
Douglas Electrical ContractingElectrical103/21/2026
KSC ConstructionGeneral Contractor107/08/2026
Allstate SprinklerFire Protection107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Go Pro Fire ProtectionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003906/19/2023
Lucid Building Engineering8196105/24/2023
Sead Engineering2665405/10/2023
Special Inspection Services1200209/27/2021
Building Lifecycle
All (208)Filed (30)Permit Issued (28)Signed Off (19)Facade (FISP) (15)Violation (60)Inspection (24)Objection (2)Special Inspection (30)
09/30/2026
Signed off — Alteration
Modification to the MH system on the 6th FL. No Change of use, egress or occupancy.
M00583825-I1
08/27/2026
Violation issued (ECB, open)
Unknown
08/27/2026
Violation issued (ECB, open)
Construction
03/09/2026
Permit issued — Plumbing
M00355330-I1-PL
12/23/2025
Permit issued — Plumbing
M00355330-I1-PL
11/24/2025
Filed — Alteration
Modification of Plumbing and related piping as shown on plans.
M00355330-P2
10/31/2025
Signed off — Alteration
HEREWITH FILING FOR GENERAL CONSTRUCTION TO THE EXISTING 6TH FL OFFICE SPACE (WISE) AS PER PLANS FILED. NO CHANGE TO USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00583773-I1
02/27/2024
Signed off — Alteration
Modification to the Plumbing system on the 6th FL., No change of use, egress and occupancy
M00583868-I1
11/17/2023
Signed off — Alteration
RESPECTFULLY REQUESTING TO REVISE EQUIPMENT MODIFICTION TABLE TO REFLECT AS BUILT CONDTIONS UNDER PREVIOUSLY APPROVED PLANS
M07998185-I1
11/13/2023
Signed off — Alteration
Interior renovation of the HKS office on the 12 FL. No change of use, egress or occupancy.
M07997401-I1
11/13/2023
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR (Q-PRIME) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08046020-I1
11/13/2023
Signed off — Alteration
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR (Q-PRIME) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08046048-I1
09/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2023
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND FLOOR (Q-PRIME) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08046004-I1
07/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2023
Signed off — Alteration
Modification to the existing plumbing fixtures and sprinkler system on the 12 FL, HKS NY Office. No change in use, egress or occupancy.
M07998173-I1
07/07/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-I1
07/06/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-S1
06/26/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/21/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/19/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR (Q-PRIME) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08046048-P1
06/15/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-S2
06/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2023
Special inspection requirement — Mechanical Systems
Christopher Drutjons
06/09/2023
Special inspection requirement — Final
Christopher Drutjons
06/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2023
Filed — Alteration
RESPECTFULLY REQUESTING TO REVISE EQUIPMENT MODIFICTION TABLE TO REFLECT AS BUILT CONDTIONS UNDER PREVIOUSLY APPROVED PLANS
M07998185-P2
06/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2023
Permit issued — Plumbing
M00808949-S2-PL
05/24/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-S2
05/18/2023
Special inspection requirement — Interior lighting power
Christopher Drutjons
05/18/2023
Special inspection requirement — Maintenance information
Christopher Drutjons
05/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
05/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
05/18/2023
Special inspection requirement — Lighting controls
Christopher Drutjons
05/18/2023
Special inspection requirement — Mechanical Systems
Christopher Drutjons
05/18/2023
Special inspection requirement — Final
Christopher Drutjons
05/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
05/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
05/18/2023
Special inspection requirement — Metering
Christopher Drutjons
05/10/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-P2
05/10/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE. WORK INCLUDES NEW PLUMBING FIXTURES INSTALL AND MODIFY SPRINKLER HEADS WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00808949-P1
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUNHO LEE
05/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/08/2023
Special inspection requirement — Sprinkler Systems
INHWAN CHANG
05/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
05/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
05/02/2023
Special inspection requirement — Final
YUNHO LEE
05/02/2023
Special inspection requirement — Insulation placement and R values
INHWAN CHANG
05/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
05/02/2023
Special inspection requirement — Interior lighting power
INHWAN CHANG
05/02/2023
Special inspection requirement — Lighting controls
INHWAN CHANG
05/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/02/2023
Special inspection requirement — Mechanical Systems
INHWAN CHANG
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP Plumbing03/09/2026
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical12/23/2025
DOB NOWPlumbingSigned-offMetro06/01/2023
DOB NOWPlumbingSigned-offMetro03/23/2023
DOB NOWSprinklersSigned-offAllstate Sprinkler02/22/2023
DOB NOWGeneral ConstructionSigned-offKSC Construction02/11/2023
DOB NOWPlumbingSigned-offGregg NY Plumbing01/20/2023
DOB NOWSprinklersSigned-offGo Pro Fire Protection01/19/2023
DOB NOWSprinklersSigned-offFirequest01/14/2023
DOB NOWMechanical SystemsSigned-offUnisol01/13/2023
DOB NOWMechanical SystemsSigned-offClune Construction Co01/12/2023
DOB NOWPlumbingSigned-offArcon Plumbing Solutions01/11/2023
DOB NOWGeneral ConstructionSigned-offUnisol12/12/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co11/30/2022
DOB NOWGeneral ConstructionSigned-offUnisol07/29/2022
DOB NOWSprinklersSigned-offFirequest10/30/2021
DOB NOWMechanical SystemsSigned-offOpc Management10/18/2021
DOB NOWGeneral ConstructionSigned-offOpc Management10/18/2021
DOB NOWPlumbingSigned-offGregg NY Plumbing10/15/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction08/09/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction08/06/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/22/2020
DOB NOWSupported ScaffoldSigned-offGE 2A Construction03/17/2020
DOB NOWSidewalk ShedSigned-offGE 2A Construction03/17/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/24/2019
DOB NOWSidewalk ShedSigned-offGE 2A Construction08/22/2019
DOB NOWSupported ScaffoldSigned-offGE 2A Construction12/18/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding10/17/2018
BISOTISSUEDJerrick Associates03/24/2021
BISOTISSUEDAll City Remodeling12/02/2020
BISOTISSUEDPaladino Construction Enterprises09/17/2020
BISOTISSUEDAtlantic Construction Services09/15/2020
BISOTISSUEDJerrick Associates03/18/2020
BISPLISSUEDBedrock Plumbing & Heating04/10/2019
BISOTISSUEDJerrick Associates03/25/2019
BISSPISSUEDP & D Mechanical03/25/2019
BISMHISSUEDTri-Star Construction03/12/2019
BISOTRE-ISSUEDTri-Star Construction03/12/2019
BISOTISSUEDJerrick Associates01/23/2019
BISOTISSUEDTri-Star Construction10/19/2018
+ 38 more permits on file
1 project · most recent 09/24/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2021Signed-offOpc ManagementAir Conditioning Systems
Cooling
United Cool Air B3G1ASHA 30,000 BTU ×1
1 project · most recent 11/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/24/2025Permit IssuedRRP PlumbingGas, Water/Sanitary
11 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026CompleteHeso ElectricalGeneral Wiring
01/07/2026CompleteLippolis ElectricGeneral Wiring
07/25/2025CompleteLippolis Electric5 meters
01/28/2024CompleteFalco Electrical ServicesGeneral Wiring
05/02/2023CompleteAsko Electric Construction & MaintenanceGeneral Wiring
01/03/2023CompleteLive Wire Electric 1General Wiring
12/22/2022CompleteFalco Electrical ServicesGeneral Wiring
11/18/2022CompleteTop Shelf Electric—
07/05/2019Permit IssuedTritech Electl & DataGeneral Wiring
05/12/2019Permit IssuedFalco Electrical ServicesGeneral Wiring
10/17/2018CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/28/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/09/2023Mechanical SystemsChristopher Drutjonsspecial
06/09/2023FinalChristopher Drutjonsprogress
05/18/2023Interior lighting powerChristopher Drutjonsenergy_progress
05/18/2023Maintenance informationChristopher Drutjonsenergy_progress
05/18/2023HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
05/18/2023HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
05/18/2023Lighting controlsChristopher Drutjonsenergy_progress
05/18/2023Mechanical SystemsChristopher Drutjonsspecial
05/18/2023FinalChristopher Drutjonsprogress
05/18/2023HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
05/18/2023Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
05/18/2023MeteringChristopher Drutjonsenergy_progress
05/10/2023Fire-Resistant Penetrations and JointsYUNHO LEEspecial
05/08/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/08/2023Sprinkler SystemsINHWAN CHANGspecial
05/02/2023Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
05/02/2023Fire-Resistance Rated ConstructionINHWAN CHANGprogress
05/02/2023FinalYUNHO LEEprogress
05/02/2023Insulation placement and R valuesINHWAN CHANGenergy_progress
05/02/2023HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
05/02/2023Interior lighting powerINHWAN CHANGenergy_progress
05/02/2023Lighting controlsINHWAN CHANGenergy_progress
05/02/2023HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
05/02/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/02/2023Mechanical SystemsINHWAN CHANGspecial
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Samsung Research AmericaOfficeFloor 7
Project M00808949 Alteration · LOC Issued · 01/26/2023
HKSOfficeFloor 12, Roof
Project M07998173 Alteration · LOC Issued · 11/01/2022
Project M07998185 Alteration · LOC Issued · 11/01/2022
Hill Country BBQ &Restaurant / Food ServiceCellar, Floor 1
Project M00355330 Alteration · Permit Entire · 09/01/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 968 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch26
09/06/2026M00087674-I1Request digital key ↗
09/03/2026M00569848-I1Request digital key ↗
09/03/2026M00583825-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/20/2026M00355330-P2Request digital key ↗
08/20/2026M00355330-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00212458-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/06/2026M00110584-I1Request digital key ↗
▸Applications & Permits177
▸BISPLAN / WORK APPROVAL APPLICATION91
01/20/2026104341231Open ↗
11/25/2025140921484Open ↗
11/24/2025140921484Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION83
12/02/2020140966907Open ↗
09/18/2020140916061Open ↗
09/15/2020140921484Open ↗
Showing 3 of 83 on file for this type
▸BISPLACE OF ASSEMBLY2
11/14/2025104634558Open ↗
10/28/2025104634558Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications243
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION113
12/26/2019123755356Open ↗
12/26/2019123755356Open ↗
12/26/2019123755356Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/06/2026M00110584-I1Open ↗
09/03/2026M00569848-I1Open ↗
09/03/2026M00583773-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
08/21/2023140966907Open ↗
03/07/2019123755356Open ↗
Showing 2 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
07/13/2020140916061Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/26/2026M07998185-I1Open ↗
09/01/2026M00583825-I1Open ↗
09/01/2026M00808949-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/26/2026M07998185-I1Open ↗
09/23/2026M07998173-I1Open ↗
09/23/2026M07998173-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
07/13/2020140916061Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
07/13/2020140916061Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment103
▸BISFA - FDNY APPROVAL : FD-FAA19
06/25/2020123826994Open ↗
02/18/2020121275351Open ↗
12/31/2019123671883Open ↗
Showing 3 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS19
05/25/2018122891727Open ↗
05/02/2018121243065Open ↗
Showing 2 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
03/06/2019123755356Open ↗
06/04/2018123182484Open ↗
05/11/2018123182484Open ↗
Showing 3 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
05/25/2018122891727Open ↗
05/02/2018121243065Open ↗
Showing 2 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos67
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
03/07/2019123671883Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/06/2026M00110584-I1Open ↗
09/03/2026M00583773-I1Open ↗
09/02/2026M00704890-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance63
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
12/26/2019123755356Open ↗
03/06/2019123755356Open ↗
12/05/2018123182484Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
12/26/2019123755356Open ↗
12/05/2018123182484Open ↗
05/25/2018122891727Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/13/2021140826756Open ↗
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
01/21/2019140826756Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/08/2023140966907Open ↗
07/13/2021140826756Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00583773-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/13/2021140826756Open ↗
11/19/2020140966907Open ↗
11/19/2020140966907Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/03/2020140916061Open ↗
Showing 1 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/09/2021140966907Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/03/2020140916061Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/09/2021140966907Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/09/2021140966907Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/14/2025104497420Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/06/2019123755356Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/09/2021140966907Open ↗
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
03/04/2026101486973Open ↗
11/25/2025120185539Open ↗
11/24/2025104497420Open ↗
Showing 3 of 41 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFINAL1
02/09/2021140966907Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership99
▸BISCOST AFFIDAVIT95
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
07/22/2020123826994Open ↗
Showing 3 of 95 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/18/2025140921484Open ↗
11/25/2025120185539Open ↗
07/13/2021140826756Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms101
▸BISEFILING COVER SHEET49
03/07/2019123671883Open ↗
03/07/2019123755356Open ↗
03/06/2019123826994Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM25
04/10/2020122806080Open ↗
03/24/2020122806080Open ↗
03/13/2020121275351Open ↗
Showing 3 of 25 on file for this type
▸BISADDITIONAL INFORMATION21
12/22/2025104634558Open ↗
12/15/2025104634558Open ↗
11/25/2025140921484Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/19/2020140966907Open ↗
09/01/2020140921484Open ↗
07/13/2020140916061Open ↗
Showing 3 of 6 on file for this type