← Back
BuildNYC
Elevator cooperative
Coliseum Park Apartments North
30 WEST 60TH STREET · Name © OpenStreetMap contributors · BIN 1082935
💬 Discuss this project
1957Year Built
14Stories
D4Building Class
R8Zoning
588,527 sfGross Floor Area
590Units
LL97 CoveredRent Stabilized6 Active Violations 5 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · 129,850 sf lot · 4.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler room breeching and chimney1 filing · 5 docs
Floor 15Unit 15H3p · 1 filing · 4 docs
Floor 14Unit 14K, Unit 15J3p · 2 filings · 20 docs
Floor 13
Floor 12Unit 12P, Unit 12R, Unit 12MNUnder Construction22p · 4 filings · 20 docs
Floor 11Unit 11M, Unit 11P, Unit 11RUnder Construction9p · 3 filings · 20 docs
Floor 10
Floor 9Unit 9F3p · 1 filing · 4 docs
Floor 8Unit 8C1 filing · 6 docs
Floor 7Unit 7ALUnder Construction11p · 1 filing · 11 docs
Floor 6Unit 5F, Unit 6RN, Unit 6NPR6p · 3 filings · 9 docs
Floor 5
Floor 4
Floor 3Unit 3U, Unit 3CD, Unit 3UNUnder Construction15p · 3 filings · 20 docs
Floor 2
Floor 1Exterior wall partial demolition9p · 2 filings · 10 docs
CellarExterior wall partial demolition1p · 2 filings · 11 docs
Site & exteriorAkam Associates, INC.10p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Coliseum Tenants13007/17/2026
30 West 60th Street403/21/2026
400 West 59th St Partners203/21/2026
Crescent Holding203/21/2026
Bernmac103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Elcherbini Architects3003/21/2026
A1 Expediting Service203/21/2026
M-Dis Design Group203/21/2026
A K Expediting403/21/2026
Meszaros Engineering203/21/2026
Haider Engineering, P.E103/21/2026
J Callahan Consulting403/21/2026
Enkay Design Consulting203/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Low Voltage Telecom SystemsGeneral Contractor710/07/2026
CNM ConstructionGeneral Contractor603/21/2026
Dynamic Development andGeneral Contractor407/08/2026
Phoenix Sutton STRScaffold403/21/2026
Maxco ContractingGeneral Contractor303/21/2026
Dupont BuildersGeneral Contractor303/21/2026
De Lux ConstructionGeneral Contractor307/08/2026
BrenmacScaffold303/21/2026
Bath & KitchenGeneral Contractor310/04/2026
The Metro GroupGeneral Contractor303/21/2026
Akay ElectricElectrical203/22/2026
GC LaunchpadGeneral Contractor209/23/2026
Testerman Plumbing & HeatingPlumbing207/08/2026
Maximum ElectricElectrical103/21/2026
Gemini Electric CoElectrical103/22/2026
John Fitzgerald Plumbing & HeatingPlumbing110/16/2026
Gurri InstallationGeneral Contractor104/09/2026
J.A.J. ContractingGeneral Contractor107/08/2026
Level Up RemodelingGeneral Contractor110/10/2026
Fiu Corp Dba Fiu ElectricElectrical103/22/2026
Elpo Electrical ContgElectrical103/22/2026
Stability Electric EnterprisesElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Anthony G FerryElectrical103/22/2026
Rockledge ScaffoldScaffold104/09/2026
AAA Total PlumbingPlumbing106/28/2026
Altair Plumbing and HeatingPlumbing107/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Full Circle PlumbingPlumbing107/08/2026
Gregg NY PlumbingPlumbing110/01/2026
Horbridge Plumbing & HeatingPlumbing110/10/2026
Cool Tech Air Conditioningspecialty_contractor107/17/2026
Stabile ChristopherElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Winton Group Architecture4343108/17/2026
EC Special Inspections8355505/22/2026
Rike Tech Associates2965103/24/2026
Raeven Architecture8709205/22/2025
Meszaros Engineering963105/07/2024
Arcitecture8088108/09/2022
Brent M. Porter, Architects4140204/27/2022
Rodman Paul Architects PL7162202/14/2022
Building Lifecycle
All (245)Filed (36)Permit Issued (38)Signed Off (17)Facade (FISP) (16)Violation (60)Inspection (12)Objection (36)Special Inspection (30)
10/15/2026
Permit issued — Plumbing
M01405888-S1-PL
10/09/2026
Permit issued — Plumbing
M01404855-S1-PL
10/09/2026
Permit issued — General Construction
M01405888-I1-GC
10/06/2026
Permit issued — General Construction
M01414635-I1-GC
09/30/2026
Permit issued — Plumbing
M01414635-S1-PL
09/22/2026
Permit issued — General Construction
M01414635-I1-GC
09/08/2026
Permit issued — General Construction
M01414635-I1-GC
09/03/2026
Permit issued — General Construction
M01404855-I1-GC
08/17/2026
Filed — Alteration
INTERIOR RENOVATIONS AS INDICATED ON THE DRAWINGS.
M01414635-S1
08/17/2026
Filed — Alteration
INTERIOR RENOVATIONS AS INDICATED ON THE DRAWINGS.
M01414635-I1
08/06/2026
Signed off — Alteration
4 ac blowers@1st.fl. and 1 compressor@osp
M01339758-I1
08/06/2026
Permit issued — General Construction
M01404855-I1-GC
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Teeter
07/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Teeter
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/23/2026
Special inspection requirement — Lighting in dwelling units
07/23/2026
Special inspection requirement — Interior lighting power
07/23/2026
Special inspection requirement — Lighting controls
07/20/2026
Permit issued — General Construction
M01280714-I1-GC
07/16/2026
Permit issued — Mechanical Systems
M01339758-I1-MS
07/16/2026
Permit issued — General Construction
M01280714-I1-GC
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Lighting controls
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Interior lighting power
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Lighting in dwelling units
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Lighting controls
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Interior lighting power
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Lighting in dwelling units
ABDALLAH ELCHERBINI
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ABDALLAH ELCHERBINI
06/17/2026
Objection raised — Scope
06/15/2026
Objection raised — Other
06/15/2026
Objection raised — Energy
06/15/2026
Objection raised — Other
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Energy
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Accessibility
06/15/2026
Objection raised — Scope
Latest 60 of 245 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJohn Fitzgerald Plumbing & Heating10/15/2026
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating10/09/2026
DOB NOWGeneral ConstructionPermit IssuedLevel Up Remodeling10/09/2026
DOB NOWGeneral ConstructionPermit IssuedLow Voltage Telecom Systems10/06/2026
DOB NOWPlumbingPermit IssuedGregg NY Plumbing09/30/2026
DOB NOWGeneral ConstructionPermit IssuedGC Launchpad09/22/2026
DOB NOWGeneral ConstructionPermit IssuedGC Launchpad09/08/2026
DOB NOWGeneral ConstructionPermit IssuedBath & Kitchen09/03/2026
DOB NOWGeneral ConstructionPermit IssuedBath & Kitchen08/06/2026
DOB NOWGeneral ConstructionPermit IssuedLow Voltage Telecom Systems07/20/2026
DOB NOWMechanical SystemsSigned-offCool Tech Air Conditioning07/16/2026
DOB NOWGeneral ConstructionPermit IssuedLow Voltage Telecom Systems07/16/2026
DOB NOWGeneral ConstructionPermit IssuedBath & Kitchen03/06/2026
DOB NOWPlumbingPermit IssuedFull Circle Plumbing01/06/2026
DOB NOWGeneral ConstructionPermit IssuedLow Voltage Telecom Systems01/02/2026
DOB NOWGeneral ConstructionPermit IssuedLow Voltage Telecom Systems12/31/2025
DOB NOWPlumbingPermit IssuedAAA Total Plumbing07/17/2025
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold07/15/2025
DOB NOWGeneral ConstructionPermit IssuedGurri Installation07/15/2025
DOB NOWGeneral ConstructionSigned-offLow Voltage Telecom Systems06/30/2025
DOB NOWGeneral ConstructionSigned-offLow Voltage Telecom Systems10/30/2024
DOB NOWPlumbingSigned-offTesterman Plumbing & Heating10/03/2024
DOB NOWGeneral ConstructionSigned-offDe Lux Construction09/27/2024
DOB NOWGeneral ConstructionSigned-offThe Metro Group05/13/2024
DOB NOWPlumbingSigned-offArco Plumbing and Heating03/14/2024
DOB NOWGeneral ConstructionSigned-offMaxco Contracting03/01/2024
DOB NOWGeneral ConstructionSigned-offJ.A.J. Contracting02/06/2023
DOB NOWGeneral ConstructionSigned-offDynamic Development and01/31/2023
DOB NOWPlumbingSigned-offTesterman Plumbing & Heating12/01/2022
DOB NOWGeneral ConstructionSigned-offDe Lux Construction11/30/2022
DOB NOWGeneral ConstructionSigned-offDupont Builders10/20/2022
DOB NOWMechanical SystemsSigned-offCNM Construction08/25/2022
DOB NOWPlumbingSigned-offAltair Plumbing and Heating04/20/2022
DOB NOWGeneral ConstructionSigned-offDynamic Development and03/15/2022
DOB NOWMechanical SystemsSigned-offCNM Construction05/13/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR05/18/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR05/20/2019
DOB NOWSidewalk ShedSigned-offBrenmac10/15/2018
BISOTISSUEDPhoenix Sutton STR11/04/2020
BISPLISSUEDBypass Mechanical02/06/2020
+ 48 more permits on file
1 project · most recent 03/24/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/24/2026Signed-offCool Tech Air ConditioninAir Conditioning Systems
Cooling
Cooper & Hunter CH-012MOL 9,000 BTU · Condensing Unit ×1
7 projects · most recent 08/17/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/17/2026Permit IssuedGregg NY PlumbingGas, Water/Sanitary
05/22/2026Permit IssuedHorbridge Plumbing & HeatingGas, Water/Sanitary
05/22/2026Permit IssuedJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
01/19/2026——Gas, Water/Sanitary
09/12/2025——Water/Sanitary
09/12/2025Permit IssuedFull Circle PlumbingWater/Sanitary
05/22/2025Permit IssuedAAA Total PlumbingGas, Water/Sanitary
25 projects · most recent 10/19/2026
General Wiring Lighting
FiledStatusContractorScope
10/19/2026Permit IssuedKet ElectricGeneral Wiring
09/24/2026Permit IssuedLens ElectricGeneral Wiring
09/09/2026Permit IssuedLens ElectricGeneral Wiring
07/21/2026Permit IssuedRidge ElectricGeneral Wiring
07/20/2026CompleteLens ElectricGeneral Wiring
01/05/2026Permit IssuedEvs ElectricGeneral Wiring
11/16/2025CompleteAccurate Electrical—
10/14/2025CompleteBelmont ElectricalGeneral Wiring
07/16/2025CompleteBrandl Electric—
03/12/2025Permit IssuedAnthony G Ferry—
02/26/2024CompleteApollo Electric USAGeneral Wiring
07/05/2023CompleteReliant Electrical Cont'gGeneral Wiring
03/27/2023CompleteBelmont ElectricalGeneral Wiring
01/26/2023CompleteEmpire Lic Electrical ContractorsGeneral Wiring
12/05/2022CompleteKJK ElectricGeneral Wiring
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedLow Voltage Telecom Systems1 scope_items
1 project · most recent 07/15/2025
Sidewalk Shed
FiledStatusContractorScope
07/15/2025Permit IssuedRockledge ScaffoldSidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
07/23/2026Lighting controls—energy_progress
07/23/2026Lighting in dwelling units—energy_progress
07/23/2026Interior lighting power—energy_progress
07/23/2026Fire-Resistance Rated ConstructionChristopher Teeterprogress
07/23/2026Energy Code Compliance InspectionsChristopher Teeterprogress
07/23/2026Fire-Resistant Penetrations and Joints—special
06/23/2026Fire-Resistance Rated ConstructionABDALLAH ELCHERBINIprogress
06/23/2026Interior lighting powerABDALLAH ELCHERBINIenergy_progress
06/23/2026Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
06/23/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
06/23/2026Lighting in dwelling unitsABDALLAH ELCHERBINIenergy_progress
06/23/2026Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
06/23/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
06/23/2026Lighting controlsABDALLAH ELCHERBINIenergy_progress
06/23/2026Fire-Resistance Rated ConstructionABDALLAH ELCHERBINIprogress
06/23/2026Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
06/23/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
06/23/2026Lighting controlsABDALLAH ELCHERBINIenergy_progress
06/23/2026Interior lighting powerABDALLAH ELCHERBINIenergy_progress
06/23/2026Lighting in dwelling unitsABDALLAH ELCHERBINIenergy_progress
06/09/2026Final—progress
05/21/2026FinalABDALLAH ELCHERBINIprogress
05/19/2026FinalABDALLAH ELCHERBINIprogress
03/02/2026Fire-Resistant Penetrations and JointsSYED RIZVIspecial
03/02/2026Energy Code Compliance InspectionsSYED RIZVIprogress
Latest 25 of 71.
▾Documents — 1,087 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch35
09/06/2026M00083170-I1Request digital key ↗
09/02/2026M00671663-I1Request digital key ↗
09/02/2026M00671718-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00169119-I1Request digital key ↗
▸Applications & Permits207
▸BISWORK PERMIT APPLICATION104
08/31/2022123363564Open ↗
02/07/2020123706329Open ↗
01/23/2020122013481Open ↗
Showing 3 of 104 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION100
11/25/2025122013481Open ↗
05/13/2024100566102Open ↗
07/12/2023121146410Open ↗
Showing 3 of 100 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications225
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION115
05/01/2020120701936Open ↗
02/18/2020123720679Open ↗
01/16/2020123519745Open ↗
Showing 3 of 115 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/20/2026M01218074-I1Open ↗
09/20/2026M01218074-I1Open ↗
09/20/2026M01218074-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/06/2026M00083170-I1Open ↗
09/05/2026M00169119-I1Open ↗
09/02/2026M00671663-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/20/2026M01218074-I1Open ↗
09/01/2026M01404855-I1Open ↗
08/28/2026M01218074-S1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment98
▸BISSELF-CERT PLUMBING NOTICE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
06/04/2019123720679Open ↗
05/08/2019123763944Open ↗
03/19/2019123706329Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING22
01/24/2019140743408Open ↗
Showing 1 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes16
06/06/2019123720679Open ↗
06/04/2019123720679Open ↗
05/08/2019123763944Open ↗
Showing 3 of 16 on file for this type
▸BISSTREET TREE CHECKLIST5
03/19/2019123706329Open ↗
Showing 1 of 5 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos86
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
06/04/2019123720679Open ↗
03/19/2019123706329Open ↗
03/19/2019123706329Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/02/2026M00671663-I1Open ↗
09/02/2026M00498839-P1Open ↗
09/02/2026M00498839-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/02/2019123763944Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01036187-I1Open ↗
▸Energy Compliance112
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS63
05/01/2020120701936Open ↗
06/24/2019123519745Open ↗
06/04/2019140743408Open ↗
Showing 3 of 63 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS32
08/31/2022123363564Open ↗
08/15/2022123363564Open ↗
11/16/2020123153700Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/31/2022123363564Open ↗
08/15/2022123363564Open ↗
11/16/2020123153700Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00671663-I1Open ↗
08/13/2026M00671718-I1Open ↗
09/02/2026M00498839-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/31/2022123363564Open ↗
08/15/2022123363564Open ↗
11/16/2020123153700Open ↗
Showing 3 of 8 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/13/2019123013363Open ↗
▸Approvals, Objections & Sign-offs74
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
09/13/2022123363564Open ↗
11/16/2020123153700Open ↗
05/01/2020120701936Open ↗
Showing 3 of 41 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/26/2019123153700Open ↗
06/03/2019122013481Open ↗
04/09/2019121912154Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER5
02/07/2020123706329Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/12/2023121146410Open ↗
Showing 1 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership90
▸BISCOST AFFIDAVIT85
08/31/2022123363564Open ↗
08/15/2022123363564Open ↗
11/16/2020123153700Open ↗
Showing 3 of 85 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
09/26/2019123153700Open ↗
Showing 1 of 5 on file for this type
▸Filing & Intake Forms112
▸BISEFILING COVER SHEET49
06/04/2019123720679Open ↗
05/08/2019123763944Open ↗
05/08/2019123763944Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM34
05/01/2020120701936Open ↗
02/18/2020123720679Open ↗
01/16/2020123519745Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION25
07/18/2019123720679Open ↗
05/28/2019140743408Open ↗
05/14/2019140743408Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/03/2019122013481Open ↗
Showing 1 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDHCR Document2
09/02/2026M00498839-P1Open ↗
09/02/2026M00498839-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00083170-I1Open ↗
09/05/2026M00169119-I1Open ↗