| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01399664 ↗ | 239 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 06/07/2026 | 09/22/2026 | Design ABS ENGINEERING, PLLC Contractor E. TUNNEY INTERIOR CONTRA | Installation of HVAC equipment as per plans filed. No change of use, egress or occupancy. |
| M01307962 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/04/2025 | 08/26/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Filing for plumbing work in residential unit 3EE as per plans filed. No change of use, egress or occupancy. |
| Q00531066 ↗ | 28-41 36 STREET QUEENS | Alteration CO | Permit Issued | 06/07/2021 | 08/18/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor AVANT-GRADE CONTRACTING G | Herewith filing for the conversion of a two (2) family dwelling to a single family home. General construction work proposed, as per plans s… |
| M01312169 ↗ | 114 WEST 70 STREET MANHATTAN | Alteration | Permit Issued | 11/10/2025 | 02/25/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor CROSSFIELD PLBG.&HTG | Filing for plumbing renovations in unit 9C as per plans filed. No change in use, egress or occupancy. |
| M01212913 ↗ | 100 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 07/07/2025 | Design RODMAN PAUL ARCHITECTS PLLC Contractor STRUCTURAL PRESERVATION * | Filing structural work solely for masonry opening to expand a window opening in conjunction with the architectural filing M01212913-I1. Stru… |
| M00955878 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 12/19/2023 | 05/12/2025 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Herewith filing application for renovation of existing class A apartment as per plans submitted. No change in use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| RODMAN PAUL ARCHITECTS PLLC | 22 | 08/27/2026 |
| ABS ENGINEERING, PLLC | 12 | 06/16/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RENOV INC | 4 | 05/05/2026 |
| INFINITY CONSTRUCTION INC | 3 | 10/07/2024 |
| AQUEDUCT MECHANICAL CORP | 2 | 11/10/2025 |
| BOLSTER.US,INC | 2 | 05/04/2022 |
| DPH PLUMBING & HTG CORP | 2 | 07/01/2021 |
| MAC INTERIOR CONSTRUCTION | 2 | 03/15/2023 |
| SPK/LEWIS CONSTRUCTION LL | 2 | 04/24/2023 |
| WF PLUMBING AND HEATING L | 2 | 05/05/2026 |
| A.M.N. CORPORATION | 1 | 03/16/2023 |
| ALTAIR PLUMBING AND HEATI | 1 | 02/14/2022 |
| ARI CONST & PAINTING LLC | 1 | 11/10/2025 |
| AVANT-GRADE CONTRACTING G | 1 | 08/27/2026 |
| BENT MECHANICAL CORP | 1 | 02/03/2021 |
| CROSSFIELD PLBG.&HTG | 1 | 11/10/2025 |
| DYNAMIC DEVELOPMENT AND C | 1 | 02/14/2022 |
| E. TUNNEY INTERIOR CONTRA | 1 | 06/16/2026 |
| GILLIGANS GARDEN CENTER | 1 | 11/23/2022 |
| MACREDDIN PLBG & HTG INC | 1 | 06/16/2026 |
| MARATHON MECHANICAL LLC | 1 | 08/27/2019 |
| PERFECTAIRE CO INC | 1 | 03/24/2021 |
| RJK SERVICES NYC CORP | 1 | 01/19/2022 |
| ROYAL HVAC SYSTEMS INC | 1 | 03/16/2023 |
| STRUCTURAL PRESERVATION * | 1 | 06/05/2025 |
| WA CONTRACTING CORP | 1 | 01/30/2023 |
| WERBART GENERAL CONSTRUCT | 1 | 10/01/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 3 | 03/16/2023 |
| BROWN HARRIS STEVENS RESIDENTIAL MA | 2 | 02/03/2021 |
| Axio Property Management | 1 | 03/23/2022 |
| CATHOLIC CHARITIES DIOCESE OF BROOK | 1 | 01/19/2022 |
| FirstService Residential | 1 | 11/23/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| J. CALLAHAN CONSULTING, INC. | 18 | 08/27/2026 |
| RODMAN PAUL ARCHITECTS, PLLC | 2 | 10/01/2021 |
| NOEL BUILDING CONSULTING INC | 1 | 11/23/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01399664 ↗ | 239 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 06/07/2026 | 09/22/2026 | Design ABS ENGINEERING, PLLC Contractor E. TUNNEY INTERIOR CONTRA | Installation of HVAC equipment as per plans filed. No change of use, egress or occupancy. |
| M01307962 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/04/2025 | 08/26/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Filing for plumbing work in residential unit 3EE as per plans filed. No change of use, egress or occupancy. |
| Q00531066 ↗ | 28-41 36 STREET QUEENS | Alteration CO | Permit Issued | 06/07/2021 | 08/18/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor AVANT-GRADE CONTRACTING G | Herewith filing for the conversion of a two (2) family dwelling to a single family home. General construction work proposed, as per plans s… |
| M01312169 ↗ | 114 WEST 70 STREET MANHATTAN | Alteration | Permit Issued | 11/10/2025 | 02/25/2026 | Design RODMAN PAUL ARCHITECTS PLLC Contractor CROSSFIELD PLBG.&HTG | Filing for plumbing renovations in unit 9C as per plans filed. No change in use, egress or occupancy. |
| M01212913 ↗ | 100 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/09/2025 | 07/07/2025 | Design RODMAN PAUL ARCHITECTS PLLC Contractor STRUCTURAL PRESERVATION * | Filing structural work solely for masonry opening to expand a window opening in conjunction with the architectural filing M01212913-I1. Stru… |
| M00955878 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 12/19/2023 | 05/12/2025 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Herewith filing application for renovation of existing class A apartment as per plans submitted. No change in use, egress or occupancy. |
| M01003018 ↗ | 889 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 05/24/2024 | 07/11/2024 | Design RODMAN PAUL ARCHITECTS PLLC Contractor INFINITY CONSTRUCTION INC. | Herewith filing application for interior renovation, construction of new partitions, doors, floor and wall finishes. Non-structural demolit… |
| M00810606 ↗ | 908 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/30/2023 | 02/20/2024 | Design RODMAN PAUL ARCHITECTS PLLC Contractor WA CONTRACTING CORP | Herewith filing renovation of existing class A apartment as per plans submitted. No change in use, egress or occupancy. |
| M08036149 ↗ | 145 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/22/2022 | 11/14/2023 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Interior Renovation with minor exterior work, work is to combine apartment APT 13A and 14A on the 13th and 14th floor only. Architectural/Co… |
| M00847481 ↗ | 100 7 AVENUE MANHATTAN | Alteration | Signed-off | 04/24/2023 | 09/15/2023 | Design RODMAN PAUL ARCHITECTS PLLC Contractor SPK/LEWIS CONSTRUCTION LL | Minor interior demo of an existing retail space, no new work proposed. No change in use, egress or occupancy. |
| B00671573 ↗ | 160 HENRY STREET BROOKLYN | Alteration | Signed-off | 04/21/2022 | 09/05/2023 | Design RODMAN PAUL ARCHITECTS PLLC Contractor BOLSTER.US,INC | Herewith filing application for renovation of existing class A apartment as per plans. No change of use, egress or occupancy. |
| B00693130 ↗ | 160 HENRY STREET BROOKLYN | Alteration | Signed-off | 05/04/2022 | 09/05/2023 | Design ABS ENGINEERING, PLLC Contractor BOLSTER.US,INC | HEREWITH FILING MECHANICAL APPLICATION AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00822101 ↗ | 969 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/16/2023 | 05/17/2023 | Design ABS ENGINEERING, PLLC Contractor ROYAL HVAC SYSTEMS INC | Installation of mechanical equipement. |
| M00822129 ↗ | 969 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/16/2023 | 05/16/2023 | Design ABS ENGINEERING, PLLC Owner AKAM ASSOCIATES Contractor A.M.N. CORPORATION | FILING HEREWITH PLUMBING WORK FOR THE PARTIAL RENOVATION OF APARTMENT 11D AT THE ADDRESS NOTED. |
| M00821909 ↗ | 969 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/15/2023 | 05/12/2023 | Design RODMAN PAUL ARCHITECTS PLLC Contractor MAC INTERIOR CONSTRUCTION | RENOVATION OF EXISTING CLASS AAPARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR OCCUPANCY IS PROPOSED UNDER THISAPPLICATION. |
| M00671663 ↗ | 345 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 02/14/2022 | 01/31/2023 | Design RODMAN PAUL ARCHITECTS PLLC Owner AKAM ASSOCIATES, INC. Contractor DYNAMIC DEVELOPMENT AND C | HEREWITH FILING APPLICATION FOR RENOVATION OF EXISTING APARTMENT, PARTITIONS, FIXTURES AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q08039007 ↗ | 39-60 54 STREET QUEENS | Alteration | Signed-off | 11/23/2022 | 01/19/2023 | Design RODMAN PAUL ARCHITECTS PLLC Owner FirstService Residential Contractor GILLIGANS GARDEN CENTER | Renovation of an existing building front courtyard. No change of use, egress or occupancy under this application. |
| M00525243 ↗ | 1004 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 05/20/2021 | 07/06/2022 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RENOV INC | Renovation of existing Class A apartment (#14D) on the 14th floor. New thru-wall openings for condensing units facing courtyard. No change t… |
| B00660413 ↗ | 825 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 01/19/2022 | 04/21/2022 | Design RODMAN PAUL ARCHITECTS PLLC Contractor RJK SERVICES NYC CORP | Renovation of existing commercial space. No Change in Use or Occupancy. |
| M00671718 ↗ | 345 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 02/14/2022 | 04/20/2022 | Design ABS ENGINEERING, PLLC Owner AKAM ASSOCIATES, INC. Contractor ALTAIR PLUMBING AND HEAT | HEREWITH FILING PLUMBING APPLICATION AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00548266 ↗ | 167 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 11/03/2021 | Design RODMAN PAUL ARCHITECTS PLLC Contractor WERBART GENERAL CONSTRUCT | Interior renovation of existing class A apartment (#2B) on the 2nd floor. No change to use, egress, or occupancy. |
| M00447328 ↗ | 889 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/02/2021 | 10/14/2021 | Design RODMAN PAUL ARCHITECTS PLLC Contractor INFINITY CONSTRUCTION INC. | Interior renovation of upper duplex unit (#10/11E) on the 11th floor. No change to use, egress, or occupancy. |
| M00505467 ↗ | 153 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 07/02/2021 | 07/26/2021 | Design RODMAN PAUL ARCHITECTS PLLC Contractor MAC INTERIOR CONSTRUCTION | Expanding one of the masonry openings on the 13th floor for the new units. Removal & reinstallation of interior partitions, ceiling as requi… |
| M00547368 ↗ | 100 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2021 | 07/15/2021 | Design ABS ENGINEERING, PLLC Contractor DPH PLUMBING & HTG CORP | Herewith filing plumbing work as per plans submitted. No change in use, egress or occupancy. |
| M00544825 ↗ | 100 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2021 | 07/13/2021 | Design ABS ENGINEERING, PLLC Contractor SPK/LEWIS CONSTRUCTION LL | Herewith filing mechanical work as per plans submitted. No change in use, egress or occupancy. |
| M00435418 ↗ | 1004 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 03/24/2021 | 06/16/2021 | Design ABS ENGINEERING, PLLC Contractor WF PLUMBING AND HEATING L | Plumbing work associated with the kitchen and bathroom renovation in Apartment #14D on the 14th floor. No change to use, egress or occupancy… |
| M00435457 ↗ | 1004 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 03/24/2021 | 05/18/2021 | Design ABS ENGINEERING, PLLC Contractor PERFECTAIRE CO INC | FILING HEREWITH MECHANICAL WORK FOR THE RENOVATION OF APARTMENT 14D |
| M00443938 ↗ | 889 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2021 | 04/27/2021 | Design ABS ENGINEERING, PLLC Contractor BENT MECHANICAL CORP | Plumbing work associated with interior renovation of Apt. #10/11E on the 11th floor. No change to use, egress or occupancy. |
| M00443905 ↗ | 889 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2021 | 03/26/2021 | Design ABS ENGINEERING, PLLC Contractor INFINITY CONSTRUCTION INC. | Install HVAC systems with rooftop unit and associated ducts servicing Apartment #10/11E. No change to use egress or occupancy. |
| M00210020 ↗ | 1133 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2019 | 01/29/2021 | Design RODMAN PAUL ARCHITECTS PLLC Owner Axio Property Management Contractor AQUEDUCT MECHANICAL CORP | Herewith filing alt2 application for Plumbing work type. All work in accordance with submitted plans. No changes to use, egress or occupancy… |
| M00384943 ↗ | 8 EAST 83 STREET MANHATTAN | Alteration | Signed-off | 09/17/2020 | 11/04/2020 | Design RODMAN PAUL ARCHITECTS PLLC Contractor DPH PLUMBING & HTG CORP | MINOR PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00199298 ↗ | 150 WEST 56 STREET MANHATTAN | Alteration | Signed-off | 08/27/2019 | 11/19/2019 | Design RODMAN PAUL ARCHITECTS PLLC Contractor MARATHON MECHANICAL LLC | RELOCATE: (2)WC; (2)LAV; (1)STALL SHOWER; (1)TUB/SHOWER; (1)SINK; (1)DISHWASHER |
| Building | Filings | Most Recent |
|---|---|---|
| 28-41 36 STREET ↗ | 2 | 08/27/2026 |
| 239 CENTRAL PARK WEST ↗ | 1 | 06/07/2026 |
| 145 CENTRAL PARK WEST ↗ | 5 | 12/04/2025 |
| 114 WEST 70 STREET ↗ | 1 | 11/10/2025 |
| 100 7 AVENUE ↗ | 4 | 05/09/2025 |
| 889 LEXINGTON AVENUE ↗ | 5 | 10/07/2024 |
| 969 PARK AVENUE ↗ | 3 | 03/16/2023 |
| 908 PARK AVENUE ↗ | 1 | 01/30/2023 |
| 39-60 54 STREET ↗ | 1 | 11/23/2022 |
| 1004 LEXINGTON AVENUE ↗ | 4 | 06/30/2022 |
| 160 HENRY STREET ↗ | 2 | 05/04/2022 |
| 1133 MADISON AVENUE ↗ | 5 | 03/23/2022 |
| 345 WEST 58 STREET ↗ | 2 | 02/14/2022 |
| 825 EAST 32 STREET ↗ | 1 | 01/19/2022 |
| 167 EAST 78 STREET ↗ | 1 | 10/01/2021 |
| 153 EAST 72 STREET ↗ | 1 | 07/02/2021 |
| 8 EAST 83 STREET ↗ | 2 | 04/12/2021 |
| 150 WEST 56 STREET ↗ | 1 | 08/27/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/24/2026 | Fire-Resistance Rated Construction | 28-41 36 STREET | Michael Fasulo | progress |
| 08/24/2026 | Energy Code Compliance Inspections | 28-41 36 STREET | Michael Fasulo | progress |
| 08/24/2026 | Masonry | 28-41 36 STREET | Michael Fasulo | special |
| 08/24/2026 | Fire-Resistant Penetrations and Joints | 28-41 36 STREET | Michael Fasulo | special |
| 08/24/2026 | Lighting in dwelling units | 28-41 36 STREET | Michael Fasulo | energy_progress |
| 08/24/2026 | Lighting controls | 28-41 36 STREET | Michael Fasulo | energy_progress |
| 07/21/2026 | Structural Stability – Alterations of existing buildings | 239 CENTRAL PARK WEST | Ari Kamo | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | 239 CENTRAL PARK WEST | Michael Fasulo | special |
| 05/20/2026 | Masonry | 239 CENTRAL PARK WEST | Michael Fasulo | special |
| 05/20/2026 | Post-installed Anchors | 239 CENTRAL PARK WEST | Michael Fasulo | special |
| 05/20/2026 | Fire-Resistance Rated Construction | 239 CENTRAL PARK WEST | Michael Fasulo | progress |
| 05/08/2026 | Final | 239 CENTRAL PARK WEST | Michael Fasulo | progress |
| 11/04/2025 | Fire-Resistance Rated Construction | 114 WEST 70 STREET | Michael Fasulo | progress |
| 11/04/2025 | Post-installed Anchors | 114 WEST 70 STREET | Michael Fasulo | special |
| 11/04/2025 | Masonry | 114 WEST 70 STREET | Michael Fasulo | special |
| 11/04/2025 | Fire-Resistant Penetrations and Joints | 114 WEST 70 STREET | Michael Fasulo | special |
| 11/04/2025 | Structural Stability – Alterations of existing buildings | 114 WEST 70 STREET | Ari Kamo | special |
| 10/31/2025 | Mechanical Systems | 114 WEST 70 STREET | Michael Fasulo | special |
| 10/31/2025 | Final | 114 WEST 70 STREET | Michael Fasulo | progress |
| 10/24/2025 | Structural Stability – Alterations of existing buildings | 145 CENTRAL PARK WEST | Ari Kamo | special |
| 10/24/2025 | Fire-Resistant Penetrations and Joints | 145 CENTRAL PARK WEST | Michael Fasulo | special |
| 10/24/2025 | Masonry | 145 CENTRAL PARK WEST | Michael Fasulo | special |
| 10/24/2025 | Post-installed Anchors | 145 CENTRAL PARK WEST | Michael Fasulo | special |
| 10/23/2025 | Final | 145 CENTRAL PARK WEST | Michael Fasulo | progress |
| 10/23/2025 | Mechanical Systems | 145 CENTRAL PARK WEST | Michael Fasulo | special |
| 04/18/2025 | Fire-Resistance Rated Construction | 100 7 AVENUE | Michael Fasulo | progress |
| 04/18/2025 | Lighting controls | 100 7 AVENUE | Michael Fasulo | energy_progress |
| 04/18/2025 | Lighting in dwelling units | 100 7 AVENUE | Michael Fasulo | energy_progress |
| 04/18/2025 | Final | 100 7 AVENUE | Michael Fasulo | progress |
| 04/18/2025 | Energy Code Compliance Inspections | 100 7 AVENUE | Michael Fasulo | progress |
| 04/18/2025 | Structural Stability – Alterations of existing buildings | 100 7 AVENUE | Ari Kamo | special |
| 04/18/2025 | Masonry | 100 7 AVENUE | Michael Fasulo | special |
| 04/18/2025 | Fire-Resistant Penetrations and Joints | 100 7 AVENUE | Michael Fasulo | special |
| 10/11/2024 | Final | 889 LEXINGTON AVENUE | Michael Fasulo | progress |
| 10/11/2024 | Fire-Resistant Penetrations and Joints | 889 LEXINGTON AVENUE | Michael Fasulo | special |
| 10/11/2024 | Structural Stability – Alterations of existing buildings | 889 LEXINGTON AVENUE | Ari Kamo | special |
| 10/11/2024 | Post-installed Anchors | 889 LEXINGTON AVENUE | Michael Fasulo | special |
| 09/30/2024 | Fire-Resistant Penetrations and Joints | 889 LEXINGTON AVENUE | Michael Fasulo | special |
| 09/30/2024 | Final | 889 LEXINGTON AVENUE | Michael Fasulo | progress |
| 09/30/2024 | Structural Stability – Alterations of existing buildings | 889 LEXINGTON AVENUE | Ari Kamo | special |
| 09/30/2024 | Post-installed Anchors | 889 LEXINGTON AVENUE | Michael Fasulo | special |
| 11/14/2023 | Post-installed Anchors | 145 CENTRAL PARK WEST | RODMAN PAUL JR | special |
| 11/14/2023 | Fire-Resistant Penetrations and Joints | 145 CENTRAL PARK WEST | RODMAN PAUL JR | special |
| 11/14/2023 | Structural Stability – Alterations of existing buildings | 145 CENTRAL PARK WEST | Ari Kamo | special |
| 11/14/2023 | Construction Operations Influencing Adjacent Structures | 145 CENTRAL PARK WEST | Ari Kamo | special |
| 11/14/2023 | Final | 145 CENTRAL PARK WEST | RODMAN PAUL JR | progress |
| 11/14/2023 | Fire-Resistance Rated Construction | 145 CENTRAL PARK WEST | RODMAN PAUL JR | progress |
| 03/15/2023 | HVAC-R and service water piping design and insulation | 969 PARK AVENUE | Alex Schwartz | energy_progress |
| 03/15/2023 | Energy Code Compliance Inspections | 969 PARK AVENUE | Alex Schwartz | progress |
| 03/15/2023 | Energy Code Compliance Inspections | 969 PARK AVENUE | Alex Schwartz | progress |