← Back
Primarily 3 family with 1 store or office
300 BEDFORD AVENUE
BROOKLYN · Williamsburg · BIN 3062778
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
R6BZoning
3,575 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: LOS SURES TPT YR15 HOUSING DEVELOPMENT F UND CORPOR · 2,310 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction40p · 1 filing · 20 docs
Floor 4Under Construction35p · 1 filing · 20 docs
Floor 3Under Construction35p · 1 filing · 20 docs
Floor 2Under Construction35p · 1 filing · 20 docs
Floor 1Under Construction35p · 1 filing · 20 docs
CellarUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOUTHSIDE UNITED-LOS SURES MANAGEME2009/01/2026
RELIABLE ENTERPRISES404/08/2026
LOS SURES TPT YR15 HOUSING DEVELOPMENT F UND CORPOR103/22/2026
HPD 806703/22/2026
HPD703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR M. MORALES, ARCHITECT1307/13/2026
MJE PROFESSIONAL SERVICES102/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERIC RAMOS RODRIGUEZ CONSULTING1203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor607/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/08/2026
AURA PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031007/13/2026
VICTOR MORALES, ARCHITECT8475107/10/2024
Building Lifecycle
All (119)Filed (14)Permit Issued (7)Signed Off (1)Violation (60)Inspection (2)Objection (5)Special Inspection (30)
07/14/2026
Objection raised — Cost
07/13/2026
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-A1
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Violation issued (HPD, open)
A
05/01/2026
Permit issued — Plumbing
B00945895-S1-PL
05/01/2026
Violation issued (HPD, closed)
A
03/03/2026
Permit issued — General Construction
B00945895-I1-GC
03/03/2026
Permit issued — Mechanical Systems
B00945895-S2-MS
01/30/2026
Permit issued — Mechanical Systems
B00945895-S2-MS
01/29/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/16/2026
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P7
01/16/2026
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P9
01/16/2026
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P8
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/09/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
01/09/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/07/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01183458-I1
09/22/2025
Permit issued — General Construction
B00945895-I1-GC
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, closed)
A
07/09/2025
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
B
03/09/2025
Violation issued (HPD, closed)
B
02/20/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01183458-I1
02/20/2025
Permit issued — Sidewalk Shed
B01183458-I1-SH
10/02/2024
Permit issued — General Construction
B00945895-I1-GC
09/20/2024
Objection raised — Other
09/20/2024
Objection resolved — Addressed
09/13/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P6
09/13/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P4
09/13/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P5
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/11/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/11/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/16/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P2
07/10/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P3
07/10/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at new gas ranges. Replace existing roof drain and existing plumbing piping insulation in cellar overhead.
B00945895-P1
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC05/01/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP01/30/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP09/22/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/20/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP10/02/2024
BISPLISSUEDLOVERDE PLBG & HTG CORP06/20/2011
BIS—ISSUEDA.A.D. CONSTRUCTION CORP05/14/2003
BISPLISSUEDIZI PLUMBING & HEATING SERVICES03/19/2003
BISEQISSUEDJTG & SONS SCAFFOLDING CO INC02/05/2003
BIS—ISSUEDA.A.D. CONSTRUCTION CORP01/21/2003
BISOTISSUEDSUPERB GENREAL CONTRACTING CO.04/15/1996
BISOTISSUEDSUPERB GENREAL CONTRACTING CO.04/07/1995
BISEQISSUEDSUPERB GENREAL CONTRACTING CO.04/07/1995
1 project · most recent 07/13/2026
Heating Systems Ventilation Systems
FiledStatusContractorScope
07/13/2026Permit IssuedA.A.D. CONSTRUCTION CORPHeating Systems, Ventilation Systems
1 project · most recent 07/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/13/2026Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
2 projects · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026CompleteTECHNO-VOLT ELEC, INC—
02/20/2025CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/10/2026Tenant Protection Plan Compliance—special
07/10/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/29/2026MasonrySAMI HAJJAR P.Especial
01/29/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/29/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/29/2026FinalSAMI HAJJAR P.Eprogress
01/29/2026FinalSAMI HAJJAR P.Eprogress
01/29/2026Mechanical SystemsSAMI HAJJAR P.Especial
01/29/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/09/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/09/2026Mechanical SystemsSAMI HAJJAR P.Especial
01/09/2026FinalSAMI HAJJAR P.Eprogress
01/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/06/2026MasonrySAMI HAJJAR P.Especial
01/06/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/06/2026FinalSAMI HAJJAR P.Eprogress
01/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/06/2026Tenant Protection Plan Compliance—special
09/11/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/11/2024FinalSAMI HAJJAR P.Eprogress
09/11/2024Mechanical SystemsSAMI HAJJAR P.Especial
09/10/2024FinalSAMI HAJJAR P.Eprogress
09/10/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/10/2024MasonrySAMI HAJJAR P.Especial
09/10/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
Latest 25 of 39.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/22/2026B01183458-I1Request digital key ↗
08/18/2026B00945895-P3Request digital key ↗
08/18/2026B00945895-P2Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
06/20/2011320304121Open ↗
05/19/2011320304121Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/16/2011320304121Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/18/2026B00945895-P4Open ↗
08/18/2026B00945895-P3Open ↗
08/18/2026B00945895-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00945895-P7Open ↗
08/29/2026B00945895-P8Open ↗
08/28/2026B00945895-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00945895-P7Open ↗
08/28/2026B00945895-S2Open ↗
08/28/2026B00945895-P4Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
09/27/2011320304121Open ↗
07/18/2011320304121Open ↗
▸BISSCHEDULE B - PLUMBING1
05/16/2011320304121Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/18/2026B00945895-S2Open ↗
08/18/2026B00945895-S1Open ↗
08/18/2026B00945895-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/16/2011320304121Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
11/08/2013320304121Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/16/2011320304121Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/08/2013320304121Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/15/2026B00945895-A1Open ↗
08/13/2026B00945895-P7Open ↗
08/13/2026B00945895-P4Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/08/2013320304121Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/16/2011320304121Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/08/2013320304121Open ↗
05/16/2011320304121Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
05/16/2011320304121Open ↗
▸BISADDITIONAL INFORMATION1
10/31/2011320304121Open ↗