Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Connaught Tower elevator door opening3p · 2 filings · 9 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Create a new elevator door opening in existing elevator hoistway shaft as shown on plans filed herewith. No change in use, egress, or occupancy under this application. Elevator alteration work to be filed under a separate application.
On file for this project
6 documents
REPLACEMENT OF ROOFTOP UNIT (RTU) SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 35Unit 35G, Unit 35H, Unit 35GH11p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing fixture work for apartment renovation at unit 35GH. Establish the combination of units G/H under TPPN 3/97. No change to use, egress or occupancy.
On file for this project
6 documents
Interior renovation at 35th floor to residential apartment unit #35G/H combination under TPPN 3/97. Partition, finish and fixture work. No change to use, egress or occupancy.
On file for this project
24 documents
Floor 34Combining units 34E, 34F, and 34GUnder Construction1p · 2 filings · 7 docs
Architecture
Issued Permit Scope
General Construction
GENERAL INTERIOR REFURBISHMENT TO UNIT 34 EFG-NO CHANGE IN USE, OCCUPANCY, EGRESS UNDER THIS APPLICATION
On file for this project
3 documents
APPLICATION FILED FOR THE COMBINATION OF UNITS 34 EFG. THIS APPLICATION IS FILED TO COMPLY WITH TPPN 3 OF 97. NO CHANGE OF CO REQUIRED.
On file for this project
4 documents
Floor 33Unit 33DE, Unit 33FGUnder Construction10p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
8 documents
Interior Renovation in Apartment 33DE. No change in use, occupancy, or egress.
On file for this project
4 documents
Interior alteration in apartment 33DE. No change in use, occupancy, or egress.
On file for this project
13 documents
Floor 32
Floor 31
Floor 30Unit 30L3p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
In conjunction with renovation of existing apartment 30L on the 30th floor. Plumbing work only.
On file for this project
3 documents
Interior Renovation of existing apartment 30L on the 30th floor. architectural / construction work only.
On file for this project
4 documents
Floor 297p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Legalization of plumbing work as result of apartment (#30DEF) combination on the 29th construction floor. No change to use, egress, or occupancy.
On file for this project
3 documents
Legalize the combination of Apt. #30DEF on the 29th construction floor. The actual work was filed, approved, permitted, and signed off under #121710185. No change to use, egress, or occupancy under this application.
On file for this project
4 documents
Floor 28Unit 28D, Unit 28E9p · 1 filing · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Subsequent plumbing filing to replace expired BIS application 100656586. BIS filing to be withdrawn when this DOB NOW application is signed-off. For replaced and new fixtures as shown.
On file for this project
10 documents
Floor 27
Floor 26
Floor 25Unit 26K5p · 2 filings · 7 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN APARTMENT 26K IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW JOB# M01180277. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CEILING, CABINETRY, COUNTER, DOORS, FIXTURES & FINISHES. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
3 documents · 2 drawing sheets
Floor 24
Floor 23Unit 23K, Unit 23L6p · 1 filing · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING ALT-2 THREE BATHROOMS UPGRADE. NEW CEILINGS @ # BATHROOMS. NO EXTERIOR WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. EXISTING CO DOES NOT NEED TO BE AMENDED. NEW PLUMBING FIXTURES & FITTINGS. NEW W/D.
On file for this project
7 documents
Floor 22
Floor 21Unit 21G, Unit 21H, Unit 21GH1p · 2 filings · 6 docs
Architecture
Issued Permit Scope
General Construction
FILED HEREWITH TO LEGALIZE APARTMENT COMBINATION 21G AND 21H INTO UNIT 21GH.
On file for this project
3 documents
NO WORK APPLICATION TO COMBINE APARTMENTS 21G AND 21H
On file for this project
3 documents · 3 drawing sheets
Floor 20Unit 20B, Unit 20C, Unit 20D +319p · 6 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation at the 20th floor to residential apartment 20BC. Replace existing plumbing fixtures at two bathrooms and kitchen in existing locations.
On file for this project
6 documents · 4 drawing sheets
Interior renovation at the 20th floor to residential apartment 20BC. New interior wall opening, new plumbing fixtures, and kitchen appliances throughout. No change to use, egress, or occupancy.
On file for this project
3 documents
DIRECT REPLACEMENT PLUMBING FIXTURES; REPLACE EXISTING TUB ON SHOWER, PROPOSED NEW SHOWER, PROPOSED NEW ELECTRIC WASHER/DRYER. JOB FILED IN CONJUNCTION WITH DOB FILING M00976220-I1
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 192p · 1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUNCTION WITH APT RENOVATION
On file for this project
8 documents
Floor 18Unit 18BC, Unit 18JKL9p · 3 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
RENOVATE APARTMENT #18JKL. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW PLUMBING FIXTURES, NEW LIGHTING. PLUMBING AND ELECTRICAL FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
6 documents
PROPOSED NEW INTERIOR RENOVATION UNIT #18BC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
On file for this project
4 documents
PROPOSED NEW INTERIOR RENOVATION UNIT #18BC. REPLACE EXISTING DOORS, REPLACE FINISH FLOOR, REPLACE BATHROOM FIXTURES, REPLACE KITCHEN, REPLACE LIGHT FIXTURES,
On file for this project
5 documents
Floor 17Unit 17G, Unit 17H, Unit 17GH20p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK AT APT.17GH OF EXISTING 34-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
On file for this project
24 documents
NO WORK APPLICATION TO LEGALIZE COMBINATION OF APARTMENTS 17G AND 17H
On file for this project
3 documents
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9C, Unit 9D5p · 1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUCTION ALTERATION # M01035373-I1. IN 9TH FLOOR, WORK TO INCLUDE CAP AND REMOVAL AND NEW INSTALLATION OF PLUMBING FIXTURES.
On file for this project
11 documents
Floor 8Unit 8KL1p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Renovation of Apartment 8KL including demolition and partition relocation of entry door wall as per plan. No change of use, egress, or occupancy.
On file for this project
3 documents
Floor 7Unit 7CDUnder Construction2p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF EXISTING APT. 7CD AS PER PLANS. NO CHANGE IN USE, OCCUPANCY,OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
On file for this project
6 documents
Floor 6Unit 6J4p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
MINOR INTERIOR RENOVATIONS TO APARTMENT 6J. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 5
Floor 4
Floor 3
Floor 2Unit 2A, Unit 2B3p · 1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work for Apartment 2A & 2B on 2nd floor, work includes removal of 1 Kitchen, renovation, replace plumbing fixtures for 1 bathroom and new laundry room. No change in use, egress or occupancy.
On file for this project
11 documents
Floor 1N.Y.C. approved exit sign installation10p · 1 filing · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work to remove, replace and install new fixtures.
On file for this project
21 documents
CellarCellar Garage Floor Slab Repairs19p · 4 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Plumbing work to remove, replace and install new fixtures.
On file for this project
21 documents · 3 drawing sheets
STRUCTURAL: REPAIR TO CAR GARAGE CEILING AT CELLAR LEVEL,. NO CHANGE TO USE OCCUPANCY OR EGRESS
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Sub-CellarCellar Garage Floor Slab Repairs1p · 2 filings · 9 docs
Architecture
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 12 drawing sheets
Site & exteriorN.Y.C. approved exit sign installation11p · 2 filings · 20 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
General Construction · Supported Scaffold
Plumbing work to remove, replace and install new fixtures.
On file for this project
21 documents · 12 drawing sheets
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents · 3 drawing sheets