← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
300 EAST 64TH STREET
MANHATTAN · BIN 1044388
💬 Discuss this project
1996Year Built
27Stories
RMBuilding Class
C2-8Zoning
99,863 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized11 Active Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 6,302 sf lot · 15.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects300 East 64th Street Condominiums1 filing
RoofInstall new barbecue on outdoor roof deck1 filing · 8 docs
Floor 18Unit 18A1 filing · 4 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1James Christian Cosmetics1 filing · 3 docs
CellarInstall new sprinkler heads and piping2p · 1 filing · 7 docs
Site & exteriorVerizon6 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
300 East 64th Street Partnersllc6303/21/2026
RFR Realty3207/08/2026
Jordan Cooper & Associates803/21/2026
300 East 64th Street Condominium603/21/2026
Avis Rent A Car System403/21/2026
Davis Partner303/21/2026
64 St Partners303/21/2026
LLC Nyon103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Studio Huji101/29/2025
Asda Architecture + Design101/22/2024
Ashraf204/25/2023
MG Engineering204/10/2023
Howard L Zimmerman Arch & Engineering209/06/2022
Revans Design PE207/11/2022
KZ Engineering203/17/2022
DTLS Architecture107/25/2019
Leon Skvirsky PE206/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Signs Cad203/21/2026
Platinum Services NY403/21/2026
Metropolis Group1003/21/2026
Hlzae203/21/2026
Synergy Building Consultants203/21/2026
Building Brothers403/21/2026
Clarke Construction Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1007/08/2026
Ceprine ConstructionScaffold707/08/2026
Pyramid Restoration NYspecialty_contractor407/08/2026
Signstar NYCSign hanger207/08/2026
Premier Flow Plumbing and HeatingPlumbing207/08/2026
Signs CadSign hanger107/08/2026
Demar MechanicalPlumbing107/08/2026
Matros Automated ElectricalElectrical103/22/2026
Rael Automatic Sprinkler CoFire Protection107/08/2026
Centennial Elevator IndustriesElectrical103/21/2026
R. Strangis Electrical ContractorsElectrical103/22/2026
S.A.L. Electric CoElectrical103/22/2026
Pasha USA ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asda Architecture + Desig2015101/22/2024
PSI Agency254204/10/2023
Howard L Zimmerman Architects1712107/25/2022
Revans Design PE4617207/11/2022
Building Lifecycle
All (143)Filed (14)Permit Issued (17)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (4)Objection (8)Special Inspection (15)
05/29/2026
Violation issued (HPD, open)
C
02/06/2026
Signed off — Alteration
INSTALL ILLUMINATED WALLSIGN (VERIZON) @2ND AVENUE ELEVATION.
M01162415-I1
08/20/2025
Violation issued (HPD, open)
C
08/20/2025
Violation issued (HPD, open)
C
07/18/2025
Violation issued (HPD, open)
C
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, open)
B
07/10/2025
Violation issued (HPD, open)
C
07/10/2025
Violation issued (HPD, open)
C
01/29/2025
Filed — Alteration
INSTALL ILLUMINATED WALLSIGN (VERIZON) @2ND AVENUE ELEVATION.
M01162415-I1
01/29/2025
Permit issued — Sign
M01162415-I1-SG
01/03/2025
Special inspection requirement — Final
Ryan Hung
06/24/2024
Cycle 9 facade report submitted
06/21/2024
Cycle 9 facade report signed — SAFE
06/14/2024
Cycle 9 facade inspection completed
05/21/2024
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS.ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804716-I1
04/29/2024
Signed off — Alteration
M00985076-I1
03/26/2024
Signed off — Alteration
CONCRETE EYEBROWS REPAIRS, MISCELLANEOUS BRICK REPLACEMENT & REPOINTING, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00764703-I1
02/08/2024
Permit issued — General Construction
M00764703-I1-GC
01/31/2024
Permit issued — General Construction
M00985076-I1-GC
01/22/2024
Filed — Alteration
M00985076-I1
12/06/2023
Permit issued — Supported Scaffold
M00804716-I1-SH
12/04/2023
Permit issued — Sidewalk Shed
M00804716-I1-SF
10/31/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, open)
C
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, closed)
A
04/25/2023
Filed — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS.ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804716-P1
04/20/2023
Permit issued — Sprinklers
M00720657-I1-EW-SP
04/10/2023
Filed — Alteration
INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS TO RESOLVE FDNY VIOLATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00720657-I1
04/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
03/21/2023
Cycle 9 facade report signed — SWARMP
03/18/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Signed off — Alteration
INSTALL (1) NEW BARBECUE ON OUTDOOR ROOF DECK. CONNECT TO EXISTING LOW PRESSURE GAS LINE IN ROOFTOP BOILER ROOM. ALL WORK IN CONJUNCTION WITH BIS 120353535. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00683452-I1
02/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
02/10/2023
Permit issued — General Construction
M00764703-I1-GC
02/06/2023
Cycle 9 facade report submitted
01/24/2023
Cycle 9 facade inspection completed
12/31/2022
Permit issued — Supported Scaffold
M00804716-I1-SF
12/31/2022
Permit issued — Supported Scaffold
M00804716-I1-SH
12/30/2022
Filed — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS.ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00804716-I1
12/28/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00627132-I1
11/03/2022
Violation issued (HPD, closed)
I
09/13/2022
Special inspection requirement — Masonry
Howard Zimmerman
09/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
09/13/2022
Special inspection requirement — Final
Howard Zimmerman
09/06/2022
Filed — Alteration
CONCRETE EYEBROWS REPAIRS, MISCELLANEOUS BRICK REPLACEMENT & REPOINTING, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00764703-P1
09/06/2022
Special inspection requirement — Masonry
09/06/2022
Special inspection requirement — Final
09/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/31/2022
Objection raised — Other
07/31/2022
Objection resolved — Addressed
07/31/2022
Objection raised — Other
07/31/2022
Objection resolved — Addressed
07/25/2022
Filed — Alteration
CONCRETE EYEBROWS REPAIRS, MISCELLANEOUS BRICK REPLACEMENT & REPOINTING, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00764703-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSigns Cad01/29/2025
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY02/08/2024
DOB NOWGeneral ConstructionSigned-offPasha USA Construction01/31/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/06/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY12/04/2023
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co04/20/2023
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY02/10/2023
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/31/2022
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/31/2022
DOB NOWPlumbingSigned-offDemar Mechanical06/01/2022
DOB NOWSidewalk ShedSigned-offCeprine Construction03/17/2022
DOB NOWSidewalk ShedSigned-offCeprine Construction06/16/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating12/12/2019
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating08/27/2019
DOB NOWSignSigned-offSignstar NYC06/12/2018
DOB NOWSignSigned-offSignstar NYC06/12/2018
DOB NOWSidewalk ShedSigned-offCeprine Construction02/05/2018
BISPLISSUEDCity/Suburban Plumbing01/06/2026
BISPLISSUEDGo Greener Plumbing09/20/2022
BISSPISSUEDGo Greener Plumbing09/20/2022
BISBLISSUEDCity/Suburban Plumbing10/04/2021
BISPLISSUEDCity/Suburban Plumbing10/04/2021
BISOTISSUEDA. Bonaduce06/05/2020
BISOTISSUEDA. Bonaduce01/13/2020
BISPLISSUEDAll Pro Plumbing & Heating08/29/2019
BISOTISSUEDA101 CONSTRUCTION+DESIGN08/22/2019
BISPLISSUEDCity/Suburban Plumbing10/10/2018
BISBLISSUEDCity/Suburban Plumbing10/10/2018
BISPLISSUEDFull Circle Plumbing07/06/2018
BISMHISSUEDPetrill Construction Management07/03/2018
BISOTISSUEDPetrill Construction Management07/03/2018
BISOTISSUEDSign Star NYC06/14/2018
BISOTISSUEDDJM NYC04/03/2018
BISOTISSUEDInput Construction12/22/2017
BISPLISSUEDCity/Suburban Plumbing07/26/2017
BISOTISSUEDCapitol Awning Co07/11/2017
BIS—ISSUEDMauceri Sign Co06/21/2017
BISPLISSUEDLCS Plumbing & Consulting05/22/2017
BISSPISSUEDCapitol Fire Sprinkler Co05/08/2017
BISOTISSUEDAncor05/05/2017
+ 27 more permits on file
1 project · most recent 04/10/2023
FiledStatusContractorScope
04/10/2023Signed-offRael Automatic Sprinkler Co22 heads
22 projects · most recent 12/30/2025
General Wiring
FiledStatusContractorScope
12/30/2025Permit IssuedCentennial Elevator IndustriesGeneral Wiring
11/19/2025CompleteGreen Power Electric—
03/21/2025CompleteSigns Cad—
02/06/2024CompleteMatros Automated ElectricalGeneral Wiring
01/04/2024CompleteR. Strangis Electrical ContractorsGeneral Wiring
01/03/2024CompleteNyco ElectricGeneral Wiring
09/27/2023CompleteKopp ElectricGeneral Wiring
07/11/2023CompletePrecision Electrical ContGeneral Wiring
05/11/2023CompletePhilip A. RobinsonGeneral Wiring
05/09/2023CompleteA & A Electrical ContractingGeneral Wiring
12/27/2022CompleteIlluminous ElectricGeneral Wiring
10/31/2022CompleteNee Electrical—
04/25/2022CompleteNee Electrical—
03/25/2022CompleteRainbow Electric Co—
03/18/2022CancelledBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/31/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/03/2025FinalRyan Hungprogress
04/10/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
02/16/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
09/13/2022MasonryHoward Zimmermanspecial
09/13/2022Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
09/13/2022FinalHoward Zimmermanprogress
09/06/2022Masonry—special
09/06/2022Final—progress
09/06/2022Structural Stability – Alterations of existing buildings—special
07/11/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
04/18/2022Post-installed AnchorsMAURICIO ANDRADEspecial
04/18/2022Sprinkler SystemsMAURICIO ANDRADEspecial
04/18/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/17/2018FinalLEON SKVIRSKYprogress
05/17/2018FinalLEON SKVIRSKYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteFloor 1
Project M01162415 Alteration · LOC Issued · 01/29/2025
Project M00045128 Alteration · LOC Issued · 06/11/2018
Project M00045136 Alteration · LOC Issued · 06/11/2018
James Christian CosmeticsMedical / HealthcareFloor 1
Project M00985076 Alteration · LOC Issued · 01/22/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,163 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/06/2026M00016737-I1Request digital key ↗
09/06/2026M00045136-I1Request digital key ↗
09/06/2026M00045128-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00196876-I1Request digital key ↗
▸Applications & Permits262
▸BISPLAN / WORK APPROVAL APPLICATION176
04/15/2025123376827Open ↗
06/03/2024122152552Open ↗
02/23/2024122486498Open ↗
Showing 3 of 176 on file for this type
▸BISWORK PERMIT APPLICATION83
01/06/2026123376827Open ↗
04/23/2025123376827Open ↗
10/18/2024123376827Open ↗
Showing 3 of 83 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications252
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION131
10/15/2021122012570Open ↗
Showing 1 of 131 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M00016737-I1Open ↗
09/06/2026M00045136-I1Open ↗
09/02/2026M00683452-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M00045136-I1Open ↗
08/24/2026M00045128-I1Open ↗
08/23/2026M00764703-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00683452-I1Open ↗
08/30/2026M00683452-P1Open ↗
08/26/2026M00720657-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment94
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISEQUIPMENT USE PERMITS17
03/29/2024122012570Open ↗
03/08/2024122486498Open ↗
03/08/2024122486498Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING9
02/15/2024122486498Open ↗
11/14/2023122486498Open ↗
09/28/2023122486498Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
01/17/2024122468953Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
03/08/2024122486498Open ↗
03/02/2024122486498Open ↗
11/29/2023122486498Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
07/05/2023122486498Open ↗
04/10/2023123376827Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes14
05/01/2024122012570Open ↗
02/02/2023123004275Open ↗
08/12/2022122486498Open ↗
Showing 3 of 14 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00196876-I1Open ↗
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00985076-I1Open ↗
08/14/2026M00764703-I1Open ↗
08/13/2026M00764703-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance75
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
10/16/2020140871590Open ↗
Showing 1 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
11/05/2021123004275Open ↗
11/05/2021123004275Open ↗
10/16/2020140871590Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
07/05/2023122486498Open ↗
04/07/2023123376827Open ↗
02/01/2023122148906Open ↗
Showing 3 of 4 on file for this type
▸BIS* HVAC INSULATION AND SEALING3
07/05/2023122486498Open ↗
04/10/2023123376827Open ↗
02/01/2023123004275Open ↗
▸BISINTERIOR LIGHTING POWER3
07/05/2023122486498Open ↗
04/10/2023123376827Open ↗
02/01/2023123004275Open ↗
▸BISLIGHTING CONTROLS3
07/05/2023122486498Open ↗
04/10/2023123376827Open ↗
02/01/2023123004275Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/13/2023123376827Open ↗
04/10/2023123376827Open ↗
11/05/2021123004275Open ↗
Showing 3 of 12 on file for this type
▸BISMECHANICAL SYSTEMS3
07/05/2023122486498Open ↗
04/12/2023123376827Open ↗
02/01/2023123004275Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/10/2023123376827Open ↗
02/01/2023123004275Open ↗
▸BIS* EXIT SIGNS1
07/26/2023122486498Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/01/2023123004275Open ↗
▸BISPOST-INSTALLED ANCHORS1
07/05/2023122486498Open ↗
▸Approvals, Objections & Sign-offs133
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST87
02/10/2026123376827Open ↗
02/04/2026122021301Open ↗
02/04/2026123026297Open ↗
Showing 3 of 87 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE22
06/27/2023122012570Open ↗
06/13/2023122012570Open ↗
06/08/2023122012570Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER7
01/06/2026123376827Open ↗
09/20/2022122486498Open ↗
09/20/2022122607875Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL4
04/10/2023123376827Open ↗
02/01/2023122148906Open ↗
02/01/2023122148906Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership92
▸BISCOST AFFIDAVIT83
04/30/2023122607875Open ↗
10/16/2020140871590Open ↗
Showing 2 of 83 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
04/29/2024122468953Open ↗
07/25/2023122486498Open ↗
05/02/2023123376827Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms131
▸BISEFILING COVER SHEET59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISBOROUGH INTAKE FORM40
01/06/2026123376827Open ↗
Showing 1 of 40 on file for this type
▸BISADDITIONAL INFORMATION28
04/22/2024122619639Open ↗
11/28/2023122486498Open ↗
08/28/2023122486498Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
10/30/2023122266788Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWDHCR Document3
09/02/2026M00683452-P1Open ↗
09/02/2026M00683452-I1Open ↗
08/13/2026M00196876-I1Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS2
07/05/2023122486498Open ↗
02/01/2023122148906Open ↗
▸BISMAINTENANCE INFORMATION2
07/05/2023122486498Open ↗
02/01/2023123004275Open ↗