← Back
BuildNYC
Elevator cooperative
3001 HENRY HUDSON PARKWAY
BRONX · BIN 2083488
💬 Discuss this project
1934Year Built
6Stories
D4Building Class
R6AZoning
147,500 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · 67,350 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarHudsoncrest Properties INC.3p · 2 filings · 10 docs
Site & exteriorGarthchester Realty Associates12p · 3 filings · 5 docs
Filed — no permit issuedFacade repair outrigger installation6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Trentcentun1903/22/2026
Hudsoncrest Properties807/08/2026
Garthchester Realty309/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY Management Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & H InstallationScaffold207/11/2026
Mega Electrical ContractingElectrical103/21/2026
R.C.M. ElectricElectrical103/21/2026
Maximum Electrical ContractingElectrical103/21/2026
Five Boro Restoration GCGeneral Contractor104/09/2026
LXS AirGeneral Contractor107/08/2026
Arma ElectricElectrical103/21/2026
Absolute Plumbing & Heating & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY Restoration Technology6187101/13/2026
Greenline Developers3447105/13/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/06/2026
Signed off — Alteration
Facade repairs as per plans. No change in use, occupancy, or egress.
X01333637-I1
10/08/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
X01427937-I1-SH
09/08/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2026
Permit issued — Sidewalk Shed
X01427937-I1-SH
133 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedA & H Installation07/10/2026
DOB NOWSidewalk ShedPermit IssuedA H Installation04/03/2026
DOB NOWGeneral ConstructionSigned-offFive Boro Restoration GC03/31/2026
DOB NOWMechanical SystemsSigned-offLXS Air05/28/2021
DOB NOWPlumbingSigned-offAbsolute Plumbing & Heating & Mechanical05/20/2021
BISOTISSUEDTower Building Services12/21/2015
BISEQISSUEDEmpire Scaffolding System10/17/2015
BISOTISSUEDK.J. Remodeling of NY Co*10/14/2015
BISOTISSUEDTower Building Services10/09/2015
BISPLRE-ISSUEDHod Piping & Heating10/02/2013
BISOTISSUEDDivision One Construction07/26/2013
BISPLISSUEDAlan E. Rosenberg06/19/2012
BISOTISSUEDAugust Construction Group05/15/2012
BISOTISSUEDAM&G Waterproofing04/18/2012
BISPLISSUEDBell Fuel Oil02/15/2012
BISFBISSUEDAbilene02/15/2012
BISOTISSUEDAM&G Waterproofing01/05/2012
BISOTISSUEDDNA Contracting02/26/2009
BISEQISSUEDOutdoor Installation10/06/2008
BISOTISSUEDHouseman Sewer06/08/2007
BISOTISSUEDCap Restoration01/21/2003
BISPLISSUEDAlan E. Rosenberg01/21/2000
BISOTISSUEDCap Restoration09/14/1999
BISPLISSUEDAlan E. Rosenberg12/11/1998
BISOTISSUEDCap Restoration11/23/1998
BISOTISSUEDNational Microwave Contractors12/08/1995
BISOTISSUEDFort Cica Roofing & General Cont05/11/1995
4 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedHigh Quality Electric of NYC—
09/26/2023CompleteR.C.M. Electric—
07/25/2021CompleteArma ElectricGeneral Wiring
09/27/2018Permit IssuedCentennial Elevator IndustriesGeneral Wiring
1 project · most recent 04/02/2026
Sidewalk Shed
FiledStatusContractorScope
04/02/2026Permit IssuedA & H InstallationSidewalk Shed
1 project · most recent 06/08/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/08/2026——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/08/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2021Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/14/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/13/2021Duct leakage testing, insulation and designROMAN MARDAREWICHenergy_progress
05/12/2021Mechanical SystemsDAVID SILBERMANspecial
05/12/2021FinalROMAN MARDAREWICHprogress
169 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account