| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01444103 | 2520 BATCHELDER STREET BROOKLYN | New Job Filing | Job in process | 08/11/2026 | 08/10/2026 | — | Renovation to the Building Heating System and Control Components & Devices |
| M01437520 | 1497 3 AVENUE MANHATTAN | New Job Filing | Complete | 07/28/2026 | 07/27/2026 | — | Removal and disconnecting electrical connections to refrigerators and store signage with a max of 10 Electrical Disconnection Outlet Points |
| M01412659 | 885 10 AVENUE MANHATTAN | New Job Filing | Job in process | 06/09/2026 | 06/09/2026 | — | Installation of 1 -Accessibility Lift. 1- Service Disconnect, 1- 20amp circuit |
| M01405637 | 784 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 05/21/2026 | 05/26/2026 | — | New 400 Amp Electrical Street for a Commercial Restaurant |
| M01402243 | 1128 3 AVENUE MANHATTAN | New Job Filing | Complete | 05/14/2026 | 05/14/2026 | — | Sign and Power Feed Removal |
| M01402255 | 44 WEST 47 STREET MANHATTAN | New Job Filing | Complete | 05/14/2026 | 05/14/2026 | — | Sign and Power Feed Removal |
| Name | Projects together | Most recent |
|---|---|---|
| Zara Realty Holding Corp. | 108 | — |
| Ceprine Construction Inc | 47 | — |
| Zara Realty Holding Co. | 37 | — |
| Marlande Heating Corp. | 17 | — |
| N/A | 16 | — |
| Pr | 4 | — |
| Olshan Properties | 4 | — |
| Valle Sign & Awnings | 4 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01444103 | 2520 BATCHELDER STREET BROOKLYN | New Job Filing | Job in process | 08/11/2026 | 08/10/2026 | — | Renovation to the Building Heating System and Control Components & Devices |
| M01437520 | 1497 3 AVENUE MANHATTAN | New Job Filing | Complete | 07/28/2026 | 07/27/2026 | — | Removal and disconnecting electrical connections to refrigerators and store signage with a max of 10 Electrical Disconnection Outlet Points |
| M01412659 | 885 10 AVENUE MANHATTAN | New Job Filing | Job in process | 06/09/2026 | 06/09/2026 | — | Installation of 1 -Accessibility Lift. 1- Service Disconnect, 1- 20amp circuit |
| M01405637 | 784 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 05/21/2026 | 05/26/2026 | — | New 400 Amp Electrical Street for a Commercial Restaurant |
| M01402243 | 1128 3 AVENUE MANHATTAN | New Job Filing | Complete | 05/14/2026 | 05/14/2026 | — | Sign and Power Feed Removal |
| M01402255 | 44 WEST 47 STREET MANHATTAN | New Job Filing | Complete | 05/14/2026 | 05/14/2026 | — | Sign and Power Feed Removal |
| B01393879 | 185 MONTAGUE STREET BROOKLYN | New Job Filing | Complete | 04/28/2026 | 04/28/2026 | — | Minor Work, replacement of exiting lighting, no new electrical loads. Insulation of one 3 way switch for convenience |
| Q01388168 | 87-74 258 STREET QUEENS | New Job Filing | Job in process | 04/16/2026 | 04/21/2026 | — | Adequate wiring to entire |
| M01388176 | 156 NAGLE AVENUE MANHATTAN | New Job Filing | Job in process | 04/16/2026 | 04/17/2026 | — | Boiler, Burner Wiring |
| M01388946 | 1230 AVENUE OF THE AMER MANHATTAN | New Job Filing | Job in process | 04/17/2026 | 04/17/2026 | — | Temporary Lighting / Power_ Demo all unnecessary |
| M01370200 | 30 WEST 61 STREET MANHATTAN | New Job Filing | Job in process | 03/13/2026 | 03/16/2026 | — | Necessary wiring to a Temp Boiler Model # 600-150 |
| M01364628 | 685 3 AVENUE MANHATTAN | New Job Filing | Complete | 02/26/2026 | 02/28/2026 | — | Signage Removal - NO other work to be performed |
| M01346312 | 348 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 01/14/2026 | 01/20/2026 | — | Electrical fit-out for two offices on the 8th floor. |
| X01345044 | 255 FIELDSTON TERRACE BRONX | New Job Filing | Job in process | 01/12/2026 | 01/12/2026 | — | Boiler Burner Wiring |
| B01332075 | 443 9 ST BROOKLYN | New Job Filing | Job in process | 12/11/2025 | 12/11/2025 | — | Installation of Wheelchair Lift |
| B01328568 | 309 GOLD STREET BROOKLYN | New Job Filing | Complete | 12/04/2025 | 12/05/2025 | — | Sign and Power Feed Removal |
| B01328556 | 910 MANHATTAN AVENUE BROOKLYN | New Job Filing | Complete | 12/04/2025 | 12/04/2025 | — | Sign and Power Feed Removal |
| B01328565 | 348 FULTON STREET BROOKLYN | New Job Filing | Complete | 12/04/2025 | 12/04/2025 | — | Sign Install and also Sign and Power Feed Removal : Objection 1C9 27-3018 B |
| B01328632 | 63 FLUSHING AVENUE BROOKLYN | New Job Filing | Complete | 12/04/2025 | 12/04/2025 | — | Sign and Sign Power Feed Removal |
| M01328560 | 1482 3 AVENUE MANHATTAN | New Job Filing | Complete | 12/04/2025 | 12/04/2025 | — | Sign and Power Feed Removal |
| M01328641 | 45 WEST 67 STREET MANHATTAN | New Job Filing | Complete | 12/04/2025 | 12/04/2025 | — | Sign and Sign Power Feed Removal |
| Q01327141 | 30-18 ASTORIA BOULEVARD QUEENS | New Job Filing | Complete | 12/02/2025 | 12/02/2025 | — | Sign and Power Feed Removal |
| Q01319903 | 32-24 STEINWAY STREET QUEENS | New Job Filing | Job in process | 11/17/2025 | 11/17/2025 | — | This permit is to supersede application Q08021901 original contractor non responsive, Electrical work for one elevator. |
| Q01285500 | 88-22 PARSONS BOULEVARD QUEENS | New Job Filing | Job in process | 09/11/2025 | 09/11/2025 | — | Provide power for light poles and gate |
| M01267212 | 870 BROADWAY MANHATTAN | New Job Filing | Job in process | 08/06/2025 | 08/06/2025 | — | 7th Street Burger_ New Build- Existing Service and Electrical Panels- Branch Circuitry Only |
| M01255446 | 983 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 07/14/2025 | 07/14/2025 | — | Boiler Burner Wiring |
| M01250895 | 71 JACKSON STREET MANHATTAN | New Job Filing | Job in process | 07/03/2025 | 07/03/2025 | — | Hot Water Heater Wiring |
| M01244206 | 509 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 06/20/2025 | 06/20/2025 | — | Install 2- 30amp temporary Power feeds and service disconnect switches for temporary AC units. This is to resolve complaint 1698047 which w… |
| Q01220831 | 88-22 PARSONS BOULEVARD QUEENS | New Job Filing | Complete | 05/05/2025 | 05/05/2025 | — | Parking Lot Light and power, This application is to overlap and cancel Jomen Electric Permit # Q01186620 |
| Q01194497 | 54-01 69 LANE QUEENS | New Job Filing | Job in process | 03/13/2025 | 03/21/2025 | — | New 3 Gang outdoor meters |
| M01195890 | 1020 5 AVENUE MANHATTAN | New Job Filing | Job in process | 03/17/2025 | 03/17/2025 | — | Boiler Burner Wiring |
| Q01194537 | 30-77 38 STREET QUEENS | New Job Filing | Complete | 03/13/2025 | 03/13/2025 | — | New Pre Action Compressor install |
| Q01189436 | 23-17 BROADWAY QUEENS | New Job Filing | Job in process | 03/04/2025 | 03/04/2025 | — | Install and remove shunts |
| B01158056 | 39 WAVERLY AVENUE BROOKLYN | New Job Filing | Job in process | 12/19/2024 | 12/19/2024 | — | Installation of 5- 30amp Dryer Lines_ 5 Separate ApartmentsThis application is to supersede my original application (B01155430). I was unaw… |
| B01155430 | 39 WAVERLY AVENUE BROOKLYN | New Job Filing | Job in process | 12/13/2024 | 12/13/2024 | — | Installation of 5- 30A Dryer Lines_ 5 separate Apartments |
| Q01127902 | 176-20 JAMAICA AVE QUEENS | New Job Filing | Job in process | 10/16/2024 | 10/16/2024 | — | Service Work and Meters |
| Q01127908 | 176-16 JAMAICA AVE QUEENS | New Job Filing | Job in process | 10/16/2024 | 10/16/2024 | — | Service equipment and meters |
| M01110313 | 121 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 10/10/2024 | 10/15/2024 | — | Boiler Burner Wiring |
| M01125011 | 983 PARK AVENUE MANHATTAN | New Job Filing | Cancelled | 10/10/2024 | 10/15/2024 | — | Boiler Burner Wiring |
| Q01105880 | 150-26 SULLIVAN DRIVE QUEENS | New Job Filing | Job in process | 10/10/2024 | 10/15/2024 | — | Entire Interior wiring, Electrical incoming service by others, |
| Q01125038 | 150-32 SULLIVAN DRIVE QUEENS | New Job Filing | Job in process | 10/10/2024 | 10/15/2024 | — | Wiring to entire one family dwelling incoming service by others |
| M01117593 | 60 EAST 55 STREET MANHATTAN | New Job Filing | Complete | 09/26/2024 | 09/26/2024 | — | This application is to supersede application M 00094636 due to non response from original electrical contractor. |
| B01075871 | 992 MANHATTAN AVENUE BROOKLYN | New Job Filing | Complete | 07/03/2024 | 07/03/2024 | — | Restaurant Fit Out. Branch Wiring, 1- New Electrical Sub Panel |
| S01075213 | 106 HOLLY AVENUE STATEN ISLAND | New Job Filing | Complete | 07/02/2024 | 07/02/2024 | — | Minor extension_ House Bump out 5'x7' Room |
| M01068016 | 304 PARK AVENUE SOUTH MANHATTAN | New Job Filing | Job in process | 06/18/2024 | 06/18/2024 | — | Renovation_ Complete disconnect and reconnect of all existing equipment. |
| M01066666 | 517 WEST 142 STREET MANHATTAN | New Job Filing | Job in process | 06/14/2024 | 06/14/2024 | — | New 200amp Service_ Additional Meter_ Complete rewiring of 2 apartments |
| Q01059475 | 101-04 QUEENS BOULEVARD QUEENS | New Job Filing | Job in process | 05/31/2024 | 05/31/2024 | — | This application is to supersede application Q00827100-I1-EL due to the fact the original contractor cannot be contacted and this needs to b… |
| X01047096 | 1998 BRUCKNER BOULEVARD BRONX | New Job Filing | Job in process | 05/07/2024 | 05/07/2024 | — | Electrical Alterations of existing retail space. Branch wiring only. Electrical Panels by landlord. |
| Q01039445 | 90-15 QUEENS BOULEVARD QUEENS | New Job Filing | Complete | 04/22/2024 | 04/29/2024 | — | Connect existing circuits to new signage, Sign Description; JAMBA and also Auntie Ann's on same façade. |
| Q01040830 | 90-15 QUEENS BOULEVARD QUEENS | New Job Filing | Complete | 04/24/2024 | 04/25/2024 | — | Replace existing signage to existing circuits |
| M01024943 | 775 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 03/25/2024 | 03/25/2024 | — | Sign Install and sign inspection: 775 Columbus Ave Manhattan NY 10025 ( Sign Dimension 1'-6.125"" H X 10'-6"" W )( BAYA BAR ) ACAI BOWLs, S… |
| M01024944 | 172 EAST 91 STREET MANHATTAN | New Job Filing | Job in process | 03/25/2024 | 03/25/2024 | — | Sign Install and Sign Inspection; Sign Dimension 2'-4"" H X 9'-10.25"" W ( BAYA BAR ), ( ACAI BOWLS, Smoothies, Coffee, Juice BAR ) |
| M00999646 | 424 EAST 13 STREET MANHATTAN | New Job Filing | Complete | 02/01/2024 | 02/01/2024 | — | Apartment Renovation_ No Riser / Apartment #4 |
| M00977310 | 249 8 AVENUE MANHATTAN | New Job Filing | Complete | 12/15/2023 | 12/15/2023 | — | Replace Boilers and burners |
| M00977937 | 88 CENTRAL PARK WEST MANHATTAN | New Job Filing | Job in process | 12/15/2023 | 12/15/2023 | — | Boiler and burner replacement |
| Q00977774 | 187-35 HILLSIDE AVENUE QUEENS | New Job Filing | Job in process | 12/15/2023 | 12/15/2023 | — | Split Apt 1K to 2 Apts 1L |
| Q00977803 | 162-20 89 AVENUE QUEENS | New Job Filing | Job in process | 12/15/2023 | 12/15/2023 | — | split Apt 1C to 1C & 1F |
| M00977021 | 145 WEST 86 STREET MANHATTAN | New Job Filing | Job in process | 12/14/2023 | 12/14/2023 | — | Burner replacement 1- Industrial Combustion MMG-63P |
| M00968807 | 142 EAST 27 STREET MANHATTAN | New Job Filing | Complete | 11/29/2023 | 11/29/2023 | — | Replace Defective Electrical Equipment |
| M00943075 | 140 WEST STREET MANHATTAN | New Job Filing | Job in process | 10/04/2023 | 10/04/2023 | — | Retail Fit Out- Branch Wiring Only. Service Riser, Electrical Panels and HVAC Connections were handled by landlords electrician. |
| M00943078 | 200 BROADWAY MANHATTAN | New Job Filing | Complete | 10/04/2023 | 10/04/2023 | — | New Water Heater Installation |
| Q00894346 | 94-25 56 AVENUE QUEENS | New Job Filing | Complete | 06/22/2023 | 06/22/2023 | — | 6th & 7th Floor Public Lighting |
| S00887314 | 419 JERSEY STREET STATEN ISLAND | New Job Filing | Complete | 06/08/2023 | 06/08/2023 | — | This application for an administrative correction. Original application S00864655 was missing information needed to remove violation #35204… |
| S00864655 | 419 JERSEY STREET STATEN ISLAND | New Job Filing | Complete | 04/25/2023 | 04/25/2023 | — | Replace damaged Standpipe and Feeder_ NO Meter work performed. This application is to resolve Violation # 35204182M |
| Q00857723 | 88-25 153 STREET QUEENS | New Job Filing | Job in process | 04/11/2023 | 04/11/2023 | — | ADAQUIT WIRING TO Apt L6, L4, Supers Utility Room, See DOB Permit #421745124-01-AL |
| Q00857731 | 150-01 88 AVENUE QUEENS | New Job Filing | Complete | 04/11/2023 | 04/11/2023 | — | Legal Separation of 1 Apt into 2 AKA Apt 1C and 1E |
| B00846899 | 128 VAN BRUNT STREET BROOKLYN | New Job Filing | Job in process | 03/20/2023 | 03/21/2023 | — | Additional overcurrent protection of a second level device 200 Amps or less |
| Q00845839 | 32-38 38 STREET QUEENS | New Job Filing | Complete | 03/17/2023 | 03/17/2023 | — | As indicated on Q08054838 add #3riser |
| M00844525 | 140 WEST END AVENUE MANHATTAN | New Job Filing | Complete | 03/15/2023 | 03/15/2023 | — | Alteration to an existing Kitchen |
| Q00838167 | 23-32 31 ROAD QUEENS | New Job Filing | Complete | 03/03/2023 | 03/03/2023 | — | Wiring to 3 Gas Boilers |
| Q00832376 | 23-32 31 ROAD QUEENS | New Job Filing | Complete | 02/21/2023 | 02/21/2023 | — | Install 3- power feeds for Hot Water Heaters in Basement |
| S00829023 | 56 MYRNA LANE STATEN ISLAND | New Job Filing | Complete | 02/14/2023 | 02/14/2023 | — | Lighting, Receptacle, Switches Upgrade |
| M00824090 | 11 WEST 67 STREET MANHATTAN | New Job Filing | Job in process | 02/06/2023 | 02/08/2023 | — | Alteration to Service for future use. Please Reference ""EPR # MN02039"" |
| Q00819030 | 80-25 PARSONS BOULEVARD QUEENS | New Job Filing | Job in process | 01/26/2023 | 01/26/2023 | — | 40 Amp Ckt to an Electric range |
| Q00818209 | 91-61 193 STREET QUEENS | New Job Filing | Job in process | 01/25/2023 | 01/25/2023 | — | Split apts 1H & 1G into 2 apts each (Q00796277) |
| Q08054838 | 32-38 38 STREET QUEENS | New Job Filing | Complete | 12/14/2022 | 12/14/2022 | — | Electrical Violation Entire work performed by others |
| M08046322 | 410 EAST 52 STREET MANHATTAN | New Job Filing | Job in process | 11/29/2022 | 11/29/2022 | — | Installation of an Emergency Inverter |
| M08046329 | 414 EAST 52 STREET MANHATTAN | New Job Filing | Complete | 11/29/2022 | 11/29/2022 | — | Installation of an Emergency Back Up inverter |
| M08046343 | 424 EAST 52 STREET MANHATTAN | PAA | Job in process | 11/29/2022 | 11/29/2022 | — | Installation of emergency inverter |
| M08046353 | 434 EAST 52 STREET MANHATTAN | New Job Filing | Complete | 11/29/2022 | 11/29/2022 | — | Installation of a 10 K Inverter |
| M08046366 | 433 EAST 51 STREET MANHATTAN | New Job Filing | Complete | 11/29/2022 | 11/29/2022 | — | Installation of a 10K Inverter |
| Q08035708 | 140-60 BEECH AVENUE QUEENS | New Job Filing | Job in process | 11/07/2022 | 11/15/2022 | — | conversion of 4 apartments to 6 apartments and utility room BIN #4117154, 421745106, ES106459777 |
| Q08026949 | 138-58 FRANCIS LEWIS BLVD QUEENS | New Job Filing | Complete | 10/25/2022 | 10/25/2022 | — | Overlap application by Others A041534 |
| M08007460 | 10 UNION SQUARE EAST MANHATTAN | New Job Filing | Job in process | 09/21/2022 | 09/21/2022 | — | PAA: Addition of Electrical Panels (2) not listed on the original filing. |
| B08004949 | 266 ST NICHOLAS AVENUE BROOKLYN | New Job Filing | Job in process | 09/16/2022 | 09/16/2022 | — | Restore power to Building |
| M08003051 | 2 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 09/13/2022 | 09/13/2022 | — | Minor Renovation_ Casework reconfiguration, disconnect and reinstall electric throughout. New lighting package, no new switch feeds, No new… |
| Q08003070 | 31-44 STEINWAY STREET QUEENS | New Job Filing | Job in process | 09/13/2022 | 09/13/2022 | — | Minor Renovation_ Casework reconfiguration, disconnect and reinstall electric throughout. No new switch feeds, No new loads. Thank you. |
| M00787450 | 544 WEST 157 STREET MANHATTAN | New Job Filing | Job in process | 08/04/2022 | 08/09/2022 | — | Wiring to Apartment #3 |
| M00782894 | 19 BEACH STREET MANHATTAN | New Job Filing | Complete | 07/28/2022 | 08/01/2022 | — | New and Existing wiring to Pent House Apt. |
| M00773273 | 352 EAST 85 STREET MANHATTAN | New Job Filing | Job in process | 07/12/2022 | 07/12/2022 | — | 16 new 40 Amp stove outlets |
| Q00746956 | 88-05 171 STREET QUEENS | New Job Filing | Job in process | 05/27/2022 | 05/27/2022 | — | Add Service Switch and feeder as indicated on App A361501 objection |
| Q00724637 | 23-27 STEINWAY STREET QUEENS | New Job Filing | Complete | 04/25/2022 | 04/25/2022 | — | Removal of a 220V Ckt. to Washer Dryer. as directed on ECB 35587223K |
| M00716740 | 120 BROADWAY MANHATTAN | New Job Filing | Complete | 04/11/2022 | 04/12/2022 | — | HWH Install_ 30KW 3p 208v |
| Q00699630 | 32-24 STEINWAY STREET QUEENS | New Job Filing | Job in process | 03/17/2022 | 04/01/2022 | — | Mix Use 10 Apartments & 2 Commercial |
| M00708964 | 1158 5 AVENUE MANHATTAN | New Job Filing | Job in process | 03/30/2022 | 03/30/2022 | — | Dryer Ckt and outlets to Apts 4D & 3D |
| Q00707905 | 149-51 CROSS ISLAND PARKWAY QUEENS | New Job Filing | Job in process | 03/28/2022 | 03/28/2022 | — | Branch Wiring Only. Service Riser, Electrical Panels and HVAC wiring were handled by landlords electrician. |
| Q00705431 | 21-16 RENE COURT QUEENS | New Job Filing | Job in process | 03/24/2022 | 03/24/2022 | — | Relocate Service Outdoor Add meter for PLP for a Legal 2 Family Deed Document ID # 2022031000250001 |
| S00700437 | 58 COLLFIELD AVENUE STATEN ISLAND | New Job Filing | Complete | 03/17/2022 | 03/17/2022 | — | General Electrical Upgrades |
| Q00697444 | 30-01 BROADWAY QUEENS | New Job Filing | Job in process | 03/16/2022 | 03/16/2022 | — | This Application to supersede application A024671 by others, Original contractor no longer active. |
| M00680895 | 111 ST MARKS PLACE MANHATTAN | New Job Filing | Complete | 02/15/2022 | 02/15/2022 | — | Replace riser, add stove outlet to Apt 2 |