← Back
Parochial school, yeshiva
Brooklyn Prospect Charter School - Csd 15.2
3002 FT HAMILTON PARKWAY · BIN 3123973
💬 Discuss this project
1958Year Built
4Stories
W2Building Class
R5Zoning
89,296 sfGross Floor Area
1Units
LL97 Covered4 Open Violations ▸FDNY Report ↗
Parochial school, yeshiva · 42,070 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 4Under Construction44p · 2 filings · 20 docs
Floor 3Under Construction32p · 1 filing · 20 docs
Floor 2Under Construction32p · 1 filing · 20 docs
Floor 1Under Construction33p · 1 filing · 20 docs
CellarUnder Construction32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION303/21/2026
BKYN PROSPECT CHARTER SCHOOL303/21/2026
IMMACULATE HEART MARY RC CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WESBUILT CONSTRUCTION MANGeneral Contractor609/15/2026
ROOPCHAND SINGHElectrical103/21/2026
TORRES IVANElectrical103/21/2026
SP PLUMBING AND HEATINGPlumbing107/08/2026
ZEREGA CONTRACTING CORPPlumbing107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688508/11/2026
Building Lifecycle
All (101)Filed (13)Permit Issued (8)Violation (31)Objection (19)Special Inspection (30)
09/14/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-P2
09/14/2026
Permit issued — General Construction
B01387227-S2-GC
09/10/2026
Permit issued — Earth Work
B01387227-S1-EA
09/10/2026
Permit issued — General Construction
B01387227-I1-GC
09/10/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
09/10/2026
Special inspection requirement — Footing and Foundation
SEBASTIAN SETTEDUCATE JR., P.E
08/25/2026
Objection raised — Scope
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/19/2026
Objection raised — Scope
08/11/2026
Filed — Alteration
Foundation work for renovation
B01363682-P2
08/11/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-P1
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Fenestration air leakage
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
07/29/2026
Objection resolved — Open
07/29/2026
Objection resolved — Open
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/15/2026
Permit issued — Plumbing
B01363682-S1-PL
07/09/2026
Permit issued — Structural
B01363682-S3-ST
07/09/2026
Permit issued — Mechanical Systems
B01363682-S2-MS
07/08/2026
Permit issued — General Construction
B01363682-I1-GC
06/23/2026
Objection raised — Scope
06/23/2026
Objection raised — Scope
06/22/2026
Objection raised — Scope
06/18/2026
Objection raised — Admin
06/18/2026
Objection raised — Scope
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Structural
06/01/2026
Objection raised — Other
05/28/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-S2
05/28/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-S3
05/22/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-S1
05/18/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/20/2026
Filed — Alteration CO
Foundation associated with playground equipment installation
B01387227-I1
04/16/2026
Special inspection requirement — Final
04/08/2026
Filed — Alteration
Foundation work for renovation
B01363682-P1
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
04/08/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
03/29/2026
Filed — Alteration
Foundation work for renovation
B01363682-S2
03/29/2026
Filed — Alteration
Foundation work for renovation
B01363682-S3
03/29/2026
Filed — Alteration
Foundation work for renovation
B01363682-S1
03/29/2026
Filed — Alteration
Foundation work for renovation
B01363682-I1
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
02/26/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN09/14/2026
DOB NOWEarth WorkPermit IssuedWESBUILT CONSTRUCTION MAN09/10/2026
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN09/10/2026
DOB NOWPlumbingPermit IssuedZEREGA CONTRACTING CORP07/15/2026
DOB NOWStructuralPermit IssuedWESBUILT CONSTRUCTION MAN07/09/2026
DOB NOWMechanical SystemsPermit IssuedWESBUILT CONSTRUCTION MAN07/09/2026
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN07/08/2026
DOB NOWPlumbingSigned-offJORGE ESPEJO09/10/2019
BISEQISSUEDHKS CONSTRUCTION CORP07/08/2016
BISOTISSUEDRAIN GUARD CONSTRUCTION C06/29/2016
BISOTISSUEDTALISEN CONSTRUCTION CORP06/10/2015
BISOTISSUEDTALISEN CONSTRUCTION CORP08/01/2014
BISMHISSUEDTALISEN CONSTRUCTION CORP08/01/2014
BIS—ISSUEDTALISEN CONSTRUCTION CORP08/01/2014
BIS—ISSUEDTALISEN CONSTRUCTION CORP07/08/2014
BISPLISSUEDWILLIAM C. GERAKARIS P&H06/25/2014
BISOTISSUEDTALISEN CONSTRUCTION CORP06/17/2014
BISMHISSUEDTALISEN CONSTRUCTION CORP06/17/2014
BISPLISSUEDMAC FELDER INC07/02/2013
BISPLISSUEDMAC FELDER INC07/02/2013
BISOTISSUEDTALISEN CONSTRUCTION CORP06/27/2013
BISOTISSUEDTALISEN CONSTRUCTION CORP06/27/2013
BISOTISSUEDTALISEN CONSTRUCTION CORP06/27/2013
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/10/2012
BISPLISSUEDDUMONT PLBG & HTG CORP07/12/2012
BISOTISSUEDTALISEN CONSTRUCTION CORP07/11/2012
BISMHISSUEDTALISEN CONSTRUCTION CORP07/11/2012
BISOTISSUEDNICHOLSON & GALLOWAY, INC.09/11/2002
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Permit IssuedWESBUILT CONSTRUCTION MANHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TUHYE1683AMM0AN 168,000 BTU · Vrf Outdoor ×2
MXZ-SM60NAM2 60,000 BTU · Vrf Outdoor ×1
TUHYE1443AMM0AN 144,000 BTU · Vrf Outdoor ×1
Trane UCCAH10A0J0EZ022 162,080 BTU · Vrf Outdoor ×1
UCCAM30A0J0EZ0 521,690 BTU · Vrf Outdoor ×1
1 project · most recent 08/11/2026
Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedZEREGA CONTRACTING CORPWater/Sanitary
2 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedCLOONAGH ELECTRICAL CORPGeneral Wiring
09/05/2019Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
2 projects · most recent 09/14/2026
Steel Concrete
FiledStatusContractorScope
09/14/2026Permit IssuedWESBUILT CONSTRUCTION MAN3 scope_items
08/11/2026Permit IssuedZEREGA CONTRACTING CORPSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/10/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/10/2026Footing and FoundationSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/10/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
08/10/2026Exterior Insulation and Finish Systems (EIFS)SEBASTIAN SETTEDUCATE JR., P.Especial
08/10/2026Fenestration and door U-factor and product ratingsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/10/2026Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/10/2026Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/10/2026Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/10/2026Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/10/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/10/2026Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/18/2026Excavations - Sheeting, Shoring, and Bracing—special
04/16/2026Final—progress
04/08/2026Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
04/08/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
04/08/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
04/08/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
04/08/2026Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
04/08/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
04/08/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
02/26/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/26/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
02/26/2026HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/26/2026Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/26/2026Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 31.
▾Documents — 314 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/03/2026B01387227-P1Request digital key ↗
08/17/2026B01363682-S1Request digital key ↗
08/17/2026B01363682-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00208614-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION33
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION19
11/09/2019322011675Open ↗
08/07/2019321930452Open ↗
07/06/2016340399269Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/23/2026B01387227-S4Open ↗
09/23/2026B01387227-P2Open ↗
08/17/2026B01363682-S1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026B01363682-P2Open ↗
08/28/2026B01363682-P2Open ↗
08/24/2026B01363682-S2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B01363682-P2Open ↗
08/28/2026B01363682-P2Open ↗
08/24/2026B01363682-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/06/2016340399269Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/06/2016340399269Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE11
09/17/2014321006371Open ↗
09/11/2014321006371Open ↗
12/26/2013320742461Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING8
06/21/2014320862526Open ↗
10/09/2013320742461Open ↗
10/05/2013320742461Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
04/03/2015321006371Open ↗
03/24/2015321006371Open ↗
03/24/2015321006371Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/24/2015321006371Open ↗
03/07/2013320501845Open ↗
02/07/2013320501845Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/22/2014321006371Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/23/2015320862526Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/07/2015320942708Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/17/2026B01387227-I1Open ↗
08/17/2026B01387227-P1Open ↗
08/15/2026B01387227-S2Open ↗
▸BISST-1 Street Tree Checklist2
07/11/2014320862526Open ↗
06/21/2014320862526Open ↗
▸BISSTREET TREE CHECKLIST2
09/18/2015321234017Open ↗
07/21/2014320862526Open ↗
▸BISTenant Protection Plan and Notes1
08/02/2019321930452Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01387227-I1Open ↗
▸Environmental & Asbestos18
▸BISTHIS IS NOT AN ASBESTOS PROJECT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/17/2026B01363682-I1Open ↗
08/17/2026B01363682-S3Open ↗
08/17/2026B01363682-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/15/2014321006371Open ↗
07/07/2014320942708Open ↗
Showing 2 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
06/21/2014320862526Open ↗
05/15/2013320742461Open ↗
05/14/2013320742461Open ↗
▸BISASBESTOS INSPECTION REPORT1
06/23/2016321234017Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/11/2017321234017Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00208614-I1Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/09/2019322011675Open ↗
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
04/11/2017321234017Open ↗
07/16/2015320862526Open ↗
07/07/2015320942708Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
06/21/2014320862526Open ↗
06/21/2014320862526Open ↗
01/06/2014320742461Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/06/2014320742461Open ↗
01/06/2014320742461Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/06/2016340399269Open ↗
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/23/2026B01387227-P2Open ↗
09/23/2026B01387227-S4Open ↗
08/17/2026B01363682-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
04/11/2017321234017Open ↗
08/26/2016340399269Open ↗
07/23/2015320862526Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
04/11/2017321234017Open ↗
04/11/2017321234017Open ↗
12/11/2015321234017Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
08/14/2014321029560Open ↗
07/15/2014321006371Open ↗
06/21/2014320862526Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/22/2014320862526Open ↗
07/09/2014320862526Open ↗
06/21/2014320862526Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
09/09/2019322011675Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
09/09/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET13
09/10/2019322011675Open ↗
09/09/2019322011666Open ↗
08/02/2019321930452Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION11
11/09/2019322011675Open ↗
03/21/2015321006371Open ↗
09/19/2014321006371Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/06/2016340399269Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/17/2026B01387227-I1Open ↗
08/17/2026B01387227-P1Open ↗
▸BISAPPRVD FAB CERT OF INTENT1
09/26/2019322011675Open ↗
▸BISPLOT DIAGRAM1
07/23/2015320862526Open ↗
▸BISOP-4 - Special Report1
03/24/2015321006371Open ↗