Other college and university
Reid Hall
3009 BROADWAY · BIN 1082347
💬 Discuss this project
1901Year Built
14Stories
W6Building Class
R8Zoning
698,122 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SAFE
Other college and university · Owner of record: BARNARD COLLEGE · 151,100 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 2 filings · 11 docs
Cellar3p · 2 filings · 20 docs
Basement7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARNARD COLLEGE - COLUMBIA UNIVERSI709/13/2026
BARNARD COLLEGE2303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SILMAN108/25/2026
GEORGE J. XERAKIAS, PE108/10/2026
SOCOTEC, INC.107/30/2026
LORING CONSULTING ENGINEERS, INC.507/28/2026
INTEGRATED DESIGN GROUP207/27/2026
APPLIED DESIGN INITIATIVE, LLC103/17/2021
JAMES H. FAHEY104/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMCELL CONSTRUCTION CORP.General Contractor203/21/2026
ICS BUILDERS, INCGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983408/25/2026
SOCOTEC, INC.301107/30/2026
ATLANTIC ENGINEERINGLABOR1381103/17/2021
Building Lifecycle
All (77)Filed (13)Permit Issued (4)Signed Off (3)Facade (FISP) (14)Violation (5)Objection (8)Special Inspection (30)
08/26/2026
Objection resolved — Resolved
08/25/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S6
08/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND FACADE REPAIRS.
M01420863-I1
08/10/2026
Permit issued — Suspended Scaffold
M01420863-I1-SC
08/07/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Structural
07/30/2026
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01418961-I1
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S5
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S4
07/28/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-S1
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S2
07/28/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-S2
07/27/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-I1
07/27/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-I1
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
07/17/2026
Cycle 10 facade report submitted
06/30/2026
Signed off — Alteration
M01369121-I1
06/23/2026
Special inspection requirement — Masonry
Jesse Rushworth
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/23/2026
Special inspection requirement — Post-installed Anchors
Jesse Rushworth
06/18/2026
Special inspection requirement — Final
Jesse Rushworth
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Special inspection requirement — Heating Systems
06/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — Maintenance information
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/05/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/05/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
05/29/2026
Special inspection requirement — Mechanical Systems
05/29/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
05/29/2026
Special inspection requirement — Final
05/29/2026
Special inspection requirement — Final
MARISA HARTE
05/20/2026
Cycle 10 facade inspection completed
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
05/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
05/08/2026
Special inspection requirement — Final
MARISA HARTE
03/20/2026
Permit issued — Suspended Scaffold
M01369121-I1-SC
03/17/2026
Filed — Alteration
M01369121-I1
03/29/2023
Violation issued (HPD, closed)
A
09/30/2022
Cycle 9 facade report signed — SAFE
09/28/2022
Cycle 9 facade inspection completed
03/08/2022
Violation issued (HPD, closed)
A
02/20/2022
Cycle 9 facade report submitted
05/28/2021
Signed off — Alteration
APPLICATION FILED REMOVAL OF CHAIN LINK FENCE AND CONSTRUCTION OF FIRE RATED PARTITIONS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00480616-I1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedNEW ROC CONTRACTING CORP08/10/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM03/20/2026
DOB NOWGeneral ConstructionSigned-offICS BUILDERS, INC04/29/2021
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP07/01/2019
BISOTISSUEDB & A RESTORATION CONTRA03/14/2019
BISOTISSUEDB & A RESTORATION CONTRA04/27/2018
BISOTISSUEDB & A RESTORATION CONTRA11/06/2017
BISOTISSUEDB & A RESTORATION CONTRA03/23/2017
BISOTISSUEDRC3 ELECTRIC, LLC06/09/2016
BISOTISSUEDRC3 ELECTRIC, LLC06/28/2013
BISOTISSUEDCHAMPION CONTRUCTION CORP06/21/2010
BIS—ISSUEDBERGER SIGNS INC.03/25/2008
BISOTISSUEDA. BEST CONTRACTING01/09/2007
BISSPISSUEDTAGGART ASSOC.07/09/2004
BISPLISSUEDTAGGART ASSOCIATES CORP06/03/2004
BISMHISSUEDLENDLEASE(US)CONSTRUCTION06/02/2004
BISOTISSUEDLENDLEASE(US)CONSTRUCTION06/02/2004
BISPLISSUEDTAGGART ASSOCIATES CORP06/10/2002
BISOTISSUEDCALDWELL & WALSH BUILDING CONST12/13/2001
BISPLISSUEDSATELLITE PLUMBING CORP11/28/2000
BISPLISSUEDBRENNAN BROS CO INC01/25/1999
BISOTISSUEDA.W. & S. CONSTRUCTION CO09/29/1998
BISMHISSUEDWIRELESS DEVEL.05/19/1998
BIS—ISSUEDCAULDWELL WINGATE01/12/1998
BIS—ISSUEDCAULDWELL WINGATE06/04/1997
BIS—ISSUEDTISHMAN CONST.CORP.OF NY01/11/1994
2 projects · most recent 08/25/2026
Others Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026——Air Conditioning Systems, Heating Systems, Others, Ventilation Systems
Cooling
Mitsubishi Electric PKA-AK24NL 24,500 BTU · Split System ×2
PUY-AH24NL 24,500 BTU · Condensing Unit ×2
Heating
Aerco BMK-5000N 5,000 BTU · Boiler ×3
Markel 5100 400 CFM · Electric Heater ×1
Ventilation
Greenheck SQ-16-M2-VG 1,750 CFM · Exhaust Fan ×3
SQ-100VG 1,050 CFM · Exhaust Fan ×1
Other
Bell & Gossett 2.5AC Pump ×3
B300 ×1
RL-8F ×1
ap110-127-XL Heat Exchanger ×1
Neptune FTF-2CL ×1
07/28/2026——Others—
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026———
2 projects · most recent 08/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/25/2026——Gas, Water/Sanitary
07/28/2026——Gas, Water/Sanitary
1 project · most recent 09/02/2026
FiledStatusContractorScope
09/02/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
2 projects · most recent 08/25/2026
Steel
FiledStatusContractorScope
08/25/2026——Steel
08/10/2026Permit IssuedNEW ROC CONTRACTING CORP1 scope_items
1 project · most recent 08/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/10/2026Permit IssuedNEW ROC CONTRACTING CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/07/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026Energy Code Compliance Inspections—progress
07/21/2026Energy Code Compliance Inspections—progress
06/23/2026MasonryJesse Rushworthspecial
06/23/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/23/2026Post-installed AnchorsJesse Rushworthspecial
06/18/2026FinalJesse Rushworthprogress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026Fire-Resistant Penetrations and Joints—special
06/09/2026Heating Systems—special
06/09/2026Duct leakage testing, insulation and design—energy_progress
06/09/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026Maintenance information—energy_progress
06/08/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
06/05/2026Post-installed AnchorsMARISA HARTEspecial
06/05/2026Structural Steel - DetailsMARISA HARTEspecial
06/05/2026Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
05/29/2026Mechanical Systems—special
05/29/2026Sprinkler SystemsMARISA HARTEspecial
05/29/2026Final—progress
05/29/2026FinalMARISA HARTEprogress
Latest 25 of 36.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/05/2026M00058618-I1Request digital key ↗
09/04/2026M00480616-I1Request digital key ↗
08/18/2026M01369121-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
09/12/2019123000199Open ↗
04/27/2018123000199Open ↗
11/09/2017123000199Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/14/2021103032861Open ↗
08/14/2017123000199Open ↗
08/10/2017123000199Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00058618-I1Open ↗
08/16/2026M01399509-S2Open ↗
08/16/2026M01399509-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/30/2020123000199Open ↗
03/26/2020123000199Open ↗
03/26/2020123000199Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01418961-I1Open ↗
09/01/2026M01418961-I1Open ↗
09/01/2026M01418961-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01418961-I1Open ↗
08/31/2026M00480616-I1Open ↗
08/31/2026M00480616-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/01/2017123000199Open ↗
03/01/2017123000199Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/01/2017123000199Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
06/19/2023103797214Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00058618-I1Open ↗
08/16/2026M01399509-S6Open ↗
08/16/2026M01399509-S4Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/17/2018123000199Open ↗
03/24/2017123000199Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
03/30/2020123000199Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/01/2017123000199Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/14/2021103032861Open ↗
09/14/2021103032861Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/16/2026M01399509-S6Open ↗
08/16/2026M01399509-S4Open ↗
08/16/2026M01399530-S2Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/12/2019123000199Open ↗
09/11/2019123000199Open ↗
03/01/2017123000199Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/20/2023103797214Open ↗
09/14/2021103032861Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/19/2023103797214Open ↗
03/01/2017123000199Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/01/2017123000199Open ↗
▸BISBOROUGH INTAKE FORM1
03/27/2020123000199Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/14/2021103032861Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01369121-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01420863-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01420863-I1Open ↗