BuildNYC
Elevator apt, fireproof without stores
Jackson (NYCHA)
301 EAST 156TH STREET · BIN 2091225
💬 Discuss this project
1960Year Built
16Stories
D3Building Class
R8Zoning
748,000 sfGross Floor Area
868Units
LL97 Covered5 Active Violations 0 unresolved · 5 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 343,403 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsExterior facade repairs, Jackson Houses Building 051 filing
RoofMaterial hoist system installation12p · 2 filings · 20 docs
BulkheadRoofing Replacement and Rooftop Structure Renovation6p · 1 filing · 20 docs
Floor 13Emergency Facade Repair1 filing · 9 docs
Floor 12Emergency Facade Repair1 filing · 9 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarNYC Housing Authority4p · 5 filings · 20 docs
Site & exteriorNYC Housing Authority12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV603/21/2026
Dseny Engineering Services203/21/2026
AK Consulting Services2603/21/2026
Green Light Expediting603/21/2026
Superstructures Engineering + Architects303/21/2026
Joel Phagoo P.E103/21/2026
Gamill Engineering203/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK EnterprisesScaffold1607/08/2026
P & K ContractingScaffold1007/08/2026
Roma ScaffoldingScaffold907/08/2026
Raven Construction ServicesGeneral Contractor707/08/2026
P & K ContractingGeneral Contractor403/21/2026
Skyworx ContractingScaffold307/08/2026
Kordun ConstructionPlumbing310/04/2026
Kordun ConstructionGeneral Contractor307/08/2026
Skyline P & HPlumbing203/22/2026
Roma Scaffoldingspecialty_contractor207/08/2026
Raven Construction ServicesScaffold207/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Selectric Electrical Cont Co IElectrical103/21/2026
All-Star Electrical ServicesElectrical103/22/2026
Jemco Electric ContractorsElectrical103/21/2026
JCC ConstructionPlumbing107/08/2026
Kordun ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MT Group798304/10/2025
Bureau Veritas Na6902509/02/2024
Distinct Engineering Solu2641101/22/2024
AK Consulting Services, I6198101/22/2024
Joel Phagoo, PE2416101/08/2024
Socotec Engineering4983106/20/2023
Bitopi Consultants7036101/05/2023
Building Lifecycle
All (171)Filed (28)Permit Issued (39)Signed Off (19)Facade (FISP) (16)Violation (31)Inspection (8)Special Inspection (30)
08/05/2026
Signed off — Alteration
FN/NYCHA JACKSON HOUSES BLDG #5 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00656586-I1
05/13/2026
Signed off — Alteration
Removal of boiler, connecting to new geothermal hvac system. Jackson building 5
X00733640-I1
05/08/2026
Signed off — Alteration
installing concrete pads for new equipment; jackson building 5
X00734793-I1
05/06/2026
Signed off — Alteration
interior remodel in conjunction with new geothermal hvac system. Jackson building 5
X00752519-I1
05/05/2026
Signed off — Alteration
plumbing connections for new geothermal hvac system. Jackson building 5
X00734180-I1
10/02/2025
Signed off — Alteration
X00548540-I1
09/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/18/2025
Violation issued (FDNY_NOV, closed)
08/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/06/2025
Violation issued (FDNY_NOV, closed)
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Preliminary
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
04/10/2025
Filed — Alteration
X00548540-P2
04/09/2025
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Preliminary
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
03/20/2025
Signed off — Alteration
MATERIAL HOIST SYSTEM AT 301 EAST 156TH STREET, BRONX
X00994230-I1
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/12/2025
Permit issued — Suspended Scaffold
X00994230-I1-SC
02/25/2025
Signed off — Alteration
NYCHA Jackson Bldg 05, Exterior Faade repairs per the plans, including: Removal / Replacement /Repairs to masonry, concrete slab, shelf angle, slate sills, windows, and joint sealants. Pinning of existing brickwork with adhesive anchors. Expansion Joints.
X00989374-I1
12/04/2024
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00985652-I1
11/28/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879129-I1
11/28/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879872-I1
10/14/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879129-P2
10/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 301 EAST 156TH STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08033214-I1
10/03/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156TH STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08033164-I1
10/03/2024
Signed off — Alteration
X00807794-I1
10/03/2024
Cycle 9 facade report submitted
10/03/2024
Cycle 9 facade report signed — SAFE
09/19/2024
Cycle 9 facade inspection completed
09/16/2024
Signed off — Alteration
NYCHA Jackson Houses Bldg 05, Emergency exterior repairs as per the plans filed, including: Removal of deteriorated brick masonry. Replace steel angle, flashing & brick masonry. Concrete spandrel repair.
X00892684-I1
09/04/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Final
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
09/02/2024
Filed — Alteration
Removal of boiler, connecting to new geothermal hvac system. Jackson building 5
X00733640-P1
09/02/2024
Filed — Alteration
plumbing connections for new geothermal hvac system. Jackson building 5
X00734180-P1
07/29/2024
Permit issued — General Construction
X00752519-I1-GC
07/02/2024
Permit issued — Sidewalk Shed
X00879129-I1-SH
06/28/2024
Permit issued — Construction Fence
X00879872-I1-FN
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/16/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
05/16/2024
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng03/12/2025
DOB NOWGeneral ConstructionSigned-offRaven Construction Services07/29/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises07/02/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises06/28/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises05/15/2024
DOB NOWStructuralSigned-offRaven Construction Services05/06/2024
DOB NOWPlumbingSigned-offKordun Construction04/25/2024
DOB NOWGeneral ConstructionSigned-offP & K Contracting04/15/2024
DOB NOWMechanical SystemsSigned-offKordun Construction04/11/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises01/31/2024
DOB NOWGeneral ConstructionSigned-offRoma Scaffolding01/30/2024
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng01/26/2024
DOB NOWSuspended ScaffoldSigned-offZoria Housing01/19/2024
DOB NOWSidewalk ShedSigned-offRoma Scaffolding01/16/2024
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding01/16/2024
DOB NOWConstruction FenceSigned-offRoma Scaffolding01/12/2024
DOB NOWConstruction FencePermit IssuedP & K Contracting09/20/2023
DOB NOWGeneral ConstructionSigned-offRaven Construction Services08/08/2023
DOB NOWGeneral ConstructionSigned-offP & K Contracting07/27/2023
DOB NOWConstruction FenceSigned-offMNK Enterprises05/30/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises05/25/2023
DOB NOWStructuralSigned-offRaven Construction Services05/09/2023
DOB NOWGeneral ConstructionSigned-offRaven Construction Services03/31/2023
DOB NOWPlumbingSigned-offKordun Construction02/28/2023
DOB NOWMechanical SystemsSigned-offKordun Construction02/28/2023
DOB NOWGeneral ConstructionSigned-offRoma Scaffolding02/07/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding12/31/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding12/30/2022
DOB NOWConstruction FenceSigned-offRaven Construction Services10/12/2022
DOB NOWConstruction FenceSigned-offRaven Construction Services08/05/2022
DOB NOWConstruction FencePermit IssuedP & K Contracting07/18/2022
DOB NOWPlumbingSigned-offJCC Construction07/06/2022
DOB NOWConstruction FencePermit IssuedP & K Contracting07/16/2021
DOB NOWConstruction FencePermit IssuedP & K Contracting03/24/2021
DOB NOWConstruction FencePermit IssuedP & K Contracting12/23/2020
DOB NOWSidewalk ShedSigned-offSkyworx Contracting03/03/2020
DOB NOWConstruction FencePermit IssuedP & K Contracting01/06/2020
DOB NOWSidewalk ShedSigned-offP & K Contracting01/06/2020
DOB NOWConstruction FenceSigned-offSkyworx Contracting12/18/2019
BISPLISSUEDRichards P and H Co03/08/2021
+ 10 more permits on file
10 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026CompleteArcadia Elect'l CoGeneral Wiring
06/13/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
03/10/2025CompleteJemco Electric ContractorsGeneral Wiring
04/04/2024Permit IssuedAmin Electrical—
08/17/2023CompleteLit Mode Electrical Contg—
01/24/2023Permit IssuedHylan Datacom & Electrical—
07/05/2022CompleteArcadia Elect'l Co—
03/01/2022CompleteEia Electric1 meters
05/06/2020Permit IssuedAll-Star Electrical Services—
01/06/2020CompleteAmin Electrical—
2 projects · most recent 04/12/2022
Fence
FiledStatusContractorScope
04/12/2022Signed-offRaven Construction ServicesFence
01/03/2020Permit IssuedP & K ContractingFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
04/17/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
04/17/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
04/17/2025MasonryCHRISTOPHER BEHLEspecial
04/17/2025Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
04/17/2025PreliminaryCHRISTOPHER BEHLEprogress
04/17/2025Energy Code Compliance InspectionsCHRISTOPHER BEHLEprogress
04/17/2025Fire-Resistance Rated ConstructionCHRISTOPHER BEHLEprogress
04/17/2025Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
04/09/2025MasonryCHRISTOPHER BEHLEspecial
04/09/2025Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
04/09/2025PreliminaryCHRISTOPHER BEHLEprogress
04/09/2025Fire-Resistance Rated ConstructionCHRISTOPHER BEHLEprogress
04/09/2025Energy Code Compliance InspectionsCHRISTOPHER BEHLEprogress
04/09/2025Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
04/09/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
04/09/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
09/04/2024Heating SystemsIBRAHIM MOURADspecial
09/04/2024Mechanical SystemsIBRAHIM MOURADspecial
09/04/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/04/2024FinalIBRAHIM MOURADprogress
09/04/2024HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
09/04/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
09/04/2024HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
09/04/2024Maintenance informationIBRAHIM MOURADenergy_progress
05/16/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
Latest 25 of 56.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch24
08/24/2026X00656586-I1Request digital key ↗
08/24/2026X00733349-I1Request digital key ↗
08/24/2026X00734180-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00289783-I1Request digital key ↗
08/15/2026X00320516-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00281117-I1Request digital key ↗
08/26/2026X00289797-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION12
06/11/2020240167724Open ↗
04/28/2020240167724Open ↗
04/21/2020240167724Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
03/08/2021240242750Open ↗
03/08/2021240242750Open ↗
11/26/2018240167724Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/28/2015220363979Open ↗
▸Seals & Professional Certifications76
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/26/2026X00281117-I1Open ↗
08/26/2026X00289797-I1Open ↗
08/26/2026X00289783-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026X00548540-P2Open ↗
09/01/2026X00548540-P2Open ↗
08/31/2026X00734793-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026X00734180-P1Open ↗
09/01/2026X00548540-P2Open ↗
08/31/2026X00734793-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/08/2020240167724Open ↗
03/12/2020240242750Open ↗
09/08/2015220364585Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/08/2020240167724Open ↗
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/08/2020240167724Open ↗
04/16/2014220363979Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
04/24/2019240242750Open ↗
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
11/14/2018240242750Open ↗
11/14/2018240242750Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
08/13/2026X00320516-I1Open ↗
08/13/2026X00289783-I1Open ↗
08/13/2026X00281117-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
04/08/2020240167724Open ↗
11/14/2018240242750Open ↗
12/22/2016240167724Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/24/2026X00734180-I1Open ↗
08/24/2026X00752519-I1Open ↗
08/24/2026X00734793-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00733349-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/08/2015220364585Open ↗
09/08/2015220364585Open ↗
05/29/2014220364585Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/21/2026X00733640-I1Open ↗
08/13/2026X00548540-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/08/2015220364585Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/15/2020240167724Open ↗
03/11/2020240242750Open ↗
05/15/2019240242750Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
08/26/2026X00281117-I1Open ↗
08/26/2026X00289783-I1Open ↗
08/24/2026X00734180-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/24/2026X00734180-I1Open ↗
08/13/2026X00989374-I1Open ↗
08/13/2026X00733640-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/14/2018240242750Open ↗
07/20/2015240067208Open ↗
06/26/2014220363979Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/15/2020240167724Open ↗
10/28/2015220363979Open ↗
09/08/2015220364585Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026X00289797-I1Open ↗
08/13/2026X00281117-I1Open ↗
08/13/2026X00320516-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00289783-I1Open ↗
08/13/2026X00281117-I1Open ↗
08/13/2026X00289797-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/15/2019240242750Open ↗
10/01/2018240230852Open ↗
09/08/2015220364585Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION5
04/08/2020240167724Open ↗
05/22/2019240242750Open ↗
05/15/2019240242750Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
12/22/2016240167724Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
04/28/2020240167724Open ↗
04/21/2020240167724Open ↗
04/08/2020240167724Open ↗
▸BISEFILING COVER SHEET2
05/29/2014220364585Open ↗
04/16/2014220363979Open ↗
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/26/2018240167724Open ↗
10/28/2015220363979Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X00994230-I1Open ↗
08/13/2026X00985652-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X00985652-I1Open ↗
08/13/2026X00994230-I1Open ↗