← Back
BuildNYC
Parsonage, rectory
3021 KINGSBRIDGE AVENUE
BRONX · BIN 2087519
💬 Discuss this project
1931Year Built
3Stories
M3Building Class
R6Zoning
6,401 sfGross Floor Area
1Units
0 Active Violations
Parsonage, rectory · Owner of record: St Johns R C Church · 3,585 sf lot · 1.79 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 11 filing
Cellar5 filings
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Roman Catholic Church of St John403/21/2026
St John's Church303/21/2026
Church of St John103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering1912/23/2025
KZ Engineering107/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alklem PlumbingPlumbing907/08/2026
Emg Industrial ChimneyGeneral Contractor303/21/2026
Pittelli Electric ContElectrical103/21/2026
The Metro GroupGeneral Contractor107/25/2026
Emg Industrial ChimneyScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808612/23/2025
Building Lifecycle
All (73)Filed (20)Permit Issued (7)Signed Off (5)Violation (2)Inspection (9)Special Inspection (15)
08/11/2026
Signed off — Alteration
REPLACE BOILER AND OIL BURNER WITH DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918943-I1
07/24/2026
Signed off — Alteration
INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918961-I1
07/23/2026
Permit issued — Mechanical Systems
X00918961-I1-GC
07/13/2026
Signed off — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-I1
07/13/2026
Signed off — Alteration
RELOCATE TWO (2) EXISTING 275- GALLON FUEL OIL STORAGE TANKS. INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01309732-I1
07/13/2026
Signed off — Alteration
RELOCATE TWO (2) EXISTING 275- GALLON FUEL OIL STORAGE TANKS. INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01309732-S1
06/23/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/09/2026
Permit issued — Plumbing
X01309732-S1-PL
03/02/2026
Permit issued — Boiler Equipment
X01309732-I1-BE
02/03/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/26/2025
Special inspection requirement — Final
Joseph Bazini
12/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
12/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
12/26/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
12/23/2025
Filed — Alteration
RELOCATE TWO (2) EXISTING 275- GALLON FUEL OIL STORAGE TANKS. INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01309732-I1
12/23/2025
Filed — Alteration
RELOCATE TWO (2) EXISTING 275- GALLON FUEL OIL STORAGE TANKS. INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01309732-S1
12/23/2025
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918943-P3
12/23/2025
Filed — Alteration
INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918961-P3
10/28/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
10/28/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
10/28/2025
Special inspection requirement — Final
Joseph Bazini
07/23/2025
Permit renewed — Boiler Equipment
Renewed without changes
X00918943-I1-BE
07/22/2025
Permit renewed — Plumbing
Renewed without changes
X00918957-I1-PL
05/27/2025
Filed — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-P5
05/27/2025
Filed — Alteration
INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918961-P2
05/27/2025
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918943-P2
05/27/2025
Filed — Alteration
INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01226461-I1
05/15/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
05/15/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
05/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
05/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
02/12/2025
Filed — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-P4
01/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2025
Filed — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-P3
11/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2024
Filed — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-P2
09/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2024
Permit renewed — Plumbing
Renewed without changes
X00918957-I1-PL
08/05/2024
Permit renewed — Boiler Equipment
Renewed without changes
X00918943-I1-BE
06/28/2024
Boiler inspection report filed
Initial · no defects · Accepted
04/15/2024
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
X00907537-I1-SF
12/29/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/19/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918943-P1
12/19/2023
Filed — Alteration
INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918961-P1
12/19/2023
Filed — Alteration
X00918950-P1
12/19/2023
Filed — Alteration
INSTALL NEW GAS SERVICE AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918957-P1
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
11/13/2023
Special inspection requirement — Final
Joseph Bazini
11/13/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
08/31/2023
Permit issued — Boiler Equipment
X00918943-I1-BE
08/31/2023
Permit issued — Plumbing
X00918957-I1-PL
08/30/2023
Permit issued — Mechanical Systems
X00918961-I1-MS
08/28/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918943-I1
08/28/2023
Filed — Alteration
INSTALL GAS VENT FOR REPLACEMENT DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00918961-I1
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—The Metro Group—
DOB NOW—Alklem Plumbing—
DOB NOW—Marlande Heating—
DOB NOW—Alklem Plumbing—
DOB NOW—Alklem Plumbing—
DOB NOW—Alklem Plumbing—
DOB NOW—Alklem Plumbing—
DOB NOW—Alklem Plumbing—
DOB NOW—Alklem Plumbing—
DOB NOW—Emg Industrial Chimney—
DOB NOW—Emg Industrial Chimney—
BIS—Marlande Heating—
BIS—PCF State Restoration—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/22/2026X00907537-I1Request the plans ↗
08/21/2026X00918961-I1Request the plans ↗
08/21/2026X00918961-P1Request the plans ↗
Showing 3 of 20 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/26/2019220713360Open ↗
03/29/2011220110305Open ↗
▸BISWORK PERMIT APPLICATION2
03/29/2011220110305Open ↗
03/29/2011220110305Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/21/2026X00918961-P3Open ↗
08/21/2026X00918961-I1Open ↗
08/21/2026X00918961-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X00918943-I1Open ↗
09/23/2026X00918943-I1Open ↗
09/23/2026X00918943-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026X00918961-P3Open ↗
08/25/2026X01309732-I1Open ↗
08/25/2026X00918961-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/29/2011220110305Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/29/2011220110305Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/26/2019220713360Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/29/2011220110305Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/21/2026X00918961-I1Open ↗
08/21/2026X00918950-I1Open ↗
08/20/2026X00918957-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/29/2011220110305Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/26/2019220713360Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY1
03/29/2011220110305Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/26/2019220713360Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/31/2011220110305Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026X00918943-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/21/2026X00918950-P1Open ↗
08/21/2026X00918950-I1Open ↗
08/20/2026X00918957-P1Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/26/2019220713360Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/29/2011220110305Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/26/2019220713360Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/26/2019220713360Open ↗
03/29/2011220110305Open ↗