← Back
Elevator apt, fireproof without stores
Haber (NYCHA)
3021 WEST 25 STREET · Coney Island-Sea Gate · BIN 3322052
💬 Discuss this project
1964Year Built
14Stories
D3Building Class
R5Zoning
279,451 sfGross Floor Area
380Units
LL97 Covered6 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 125,818 sf lot · 2.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Roof1p · 1 filing · 3 docs
Floor 11 filing · 6 docs
Site & exterior4 filings · 10 docs
Filed — no permit issued2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY4707/08/2026
NYCHA2007/08/2026
N.Y.C HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RKTB ARCHITECTS110/25/2024
THE LIRO GROUP209/10/2024
SHENOY ENGINEERING, P.C.108/14/2024
AK CONSULTING SERVICES, INC208/15/2023
IKRA CONSULTING LLC108/15/2023
KNF SERVICES CROP109/18/2020
DOOLING & COMPANY ARCHITECTS105/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HRF SERVICES CORP203/21/2026
AK CONSULTING SERVICES603/21/2026
AE DESIGN SOLUTION203/21/2026
JMV ASSOCIATES LLC203/21/2026
RIGGINING CONSULTANTS103/21/2026
SHENOY ENGINEERING P C203/21/2026
TAREK M ZEID P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AWL INDUSTRIES INCGeneral Contractor1307/08/2026
CARLITOS CONTRACTING CORPGeneral Contractor1007/08/2026
ROMA SCAFFOLDING INCGeneral Contractor807/08/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
AMMITZBOLL, PAULElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
BAKER, WElectrical103/21/2026
EIA ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902102/15/2024
Building Lifecycle
All (92)Filed (10)Permit Issued (18)Signed Off (6)Facade (FISP) (20)Violation (16)Inspection (1)Objection (4)Special Inspection (17)
08/01/2025
Violation issued (FDNY_NOV, closed)
12/16/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01048852-I1
12/12/2024
Signed off — Alteration
BLDG 1- NYCHA- Plumbing Scope of work for Replacement of gas piping and risers. All as per plans filed herewith.
B00995391-I1
11/14/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/05/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 3040 WEST 24 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00915282-I1
11/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 3040 WEST 24 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00915246-I1
10/25/2024
Filed — Alteration
In-kind replacement of doors and door frames at Elevator Machine Room, Elevator Pit and Pipe Space. 2-HR rated enclosures in lobbies, corridors, and Basement. Replacement of power connection, lighting fixtures, receptacles in EMR and Elevator Pit.
B01111778-I1
10/23/2024
Special inspection requirement — Final
10/10/2024
Permit issued — Plumbing
B00995391-I1-PL
09/19/2024
Cycle 9 facade report signed — SWARMP
09/16/2024
Special inspection requirement — Interior lighting power
09/16/2024
Special inspection requirement — Maintenance information
09/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
09/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/16/2024
Special inspection requirement — Lighting controls
09/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/10/2024
Filed — Alteration
BLDG 1- NYCHA- Plumbing Scope of work for Replacement of gas piping and risers. All as per plans filed herewith.
B00995391-P1
09/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2024
Objection resolved — Addressed
08/30/2024
Cycle 9 facade report submitted
08/14/2024
Filed — Alteration
Replacement of elevator motors & control panels. Replacement of power connections to mechanical equipment. Replacement of lighting fixtures in elevator machine room & pits. Replacement of receptacles in elevator machine room & pit. Replace feeder cable.
B01092625-I1
08/09/2024
Permit issued — Construction Fence
B00915246-I1-FN
08/09/2024
Permit issued — Sidewalk Shed
B00915282-I1-SH
08/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2024
Special inspection requirement — Interior lighting power
08/07/2024
Special inspection requirement — Lighting controls
08/07/2024
Special inspection requirement — Maintenance information
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
07/24/2024
Cycle 9 facade inspection completed
06/04/2024
Permit issued — Suspended Scaffold
B01048852-I1-SC
05/29/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01048852-I1
02/27/2024
Objection resolved — Addressed
02/20/2024
Objection raised — Other
02/20/2024
Objection raised — Other
02/15/2024
Filed — Alteration
BLDG 1- NYCHA- Plumbing Scope of work for Replacement of gas piping and risers. All as per plans filed herewith.
B00995391-I1
02/06/2024
Violation issued (FDNY_NOV, closed)
01/05/2024
Signed off — Alteration
B00385050-I1
09/08/2023
Cycle 9 facade report submitted
09/08/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2023
Cycle 9 facade report signed — UNSAFE
08/28/2023
Cycle 9 facade inspection completed
08/16/2023
Permit issued — Construction Fence
B00915246-I1-FN
08/15/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 3040 WEST 24 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00915282-I1
08/15/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 3040 WEST 24 STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00915246-I1
08/15/2023
Permit issued — Sidewalk Shed
B00915282-I1-SH
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2022
Permit issued — Construction Fence
B00007508-I1-FN
08/20/2021
Permit issued — Construction Fence
B00007508-I1-FN
06/16/2021
Permit issued — Supported Scaffold
B00385050-I1-SF
09/23/2020
Permit issued — Supported Scaffold
B00385050-I1-SF
09/18/2020
Filed — Alteration
B00385050-I1
07/13/2020
Signed off — Alteration
B00038168-I1
06/18/2020
Permit issued — Construction Fence
B00007508-I1-FN
11/19/2019
Permit issued — Sidewalk Shed
B00038168-I1-SH
11/07/2019
Violation issued (ECB, closed)
Construction
06/10/2019
Permit issued — Construction Fence
B00007508-I1-FN
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP10/10/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC08/09/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC08/09/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/04/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC08/16/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC08/15/2023
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC08/26/2022
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC08/20/2021
DOB NOWSupported ScaffoldSigned-offAWL INDUSTRIES INC06/16/2021
DOB NOWSupported ScaffoldSigned-offAWL INDUSTRIES INC09/23/2020
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC06/18/2020
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/19/2019
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC06/10/2019
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/23/2018
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP11/09/2018
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC07/16/2018
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP05/17/2018
DOB NOWConstruction FencePermit IssuedAWL INDUSTRIES INC12/26/2017
BIS—ISSUEDAWL INDUSTRIES INC12/20/2023
BISMHISSUEDAWL INDUSTRIES INC06/19/2023
BISPLISSUEDEASTERN PLBG & MECH CONTR02/16/2023
BISOTISSUEDAWL INDUSTRIES INC06/13/2022
BISOTISSUEDAWL INDUSTRIES INC06/13/2022
BISOTISSUEDAWL INDUSTRIES INC06/13/2022
BISOTISSUEDAWL INDUSTRIES INC06/13/2022
BISMHISSUEDAWL INDUSTRIES INC06/13/2022
BISPLISSUEDEASTERN PLBG & MECH CONTR06/07/2022
BISPLISSUEDEASTERN PLBG & MECH CONTR02/22/2022
BISOTISSUEDAWL INDUSTRIES INC06/15/2021
BISOTISSUEDAWL INDUSTRIES INC06/15/2021
BISOTISSUEDAWL INDUSTRIES INC06/15/2021
BISMHISSUEDAWL INDUSTRIES INC06/15/2021
BISOTISSUEDAWL INDUSTRIES INC06/15/2021
BISPLISSUEDEASTERN PLBG & MECH CONTR03/02/2021
BISOTISSUEDAWL INDUSTRIES INC06/30/2020
BISOTISSUEDAWL INDUSTRIES INC06/30/2020
BISMHISSUEDAWL INDUSTRIES INC06/30/2020
BISOTISSUEDAWL INDUSTRIES INC06/30/2020
BISOTISSUEDAWL INDUSTRIES INC06/30/2020
BISSPISSUEDSIRINA FIRE PROT CORP06/27/2020
+ 28 more permits on file
7 projects · most recent 07/15/2025
General Wiring
FiledStatusContractorScope
07/15/2025CompleteE-J ELEC. INSTALLATION CO1 meters, 1 new_meters
03/15/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
01/31/2024CompleteE-J ELEC. INSTALLATION CO1 meters, 1 new_meters
09/21/2023CompleteHYLAN DATACOM & ELECL LLC—
11/21/2022CompleteJEMCO ELECT. CONTRS INC—
04/18/2019Permit IssuedEIA ELECTRIC, INCGeneral Wiring
05/02/2018Permit IssuedKLK ELECTRIC, INC—
1 project · most recent 08/14/2024
FiledStatusContractorScope
08/14/2024——1 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/14/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/23/2024Final—progress
09/16/2024Interior lighting power—energy_progress
09/16/2024Maintenance information—energy_progress
09/16/2024Fire-Resistance Rated Construction—progress
09/16/2024Fire-Resistant Penetrations and Joints—special
09/16/2024Energy Code Compliance Inspections—progress
09/16/2024Tenant Protection Plan Compliance—special
09/16/2024Lighting controls—energy_progress
09/12/2024Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
09/12/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/05/2024Tenant Protection Plan Compliance—special
09/05/2024Fire-Resistant Penetrations and Joints—special
08/07/2024Tenant Protection Plan Compliance—special
08/07/2024Interior lighting power—energy_progress
08/07/2024Lighting controls—energy_progress
08/07/2024Maintenance information—energy_progress
08/07/2024Energy Code Compliance Inspections—progress
▾Documents — 302 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026B00007508-I1Request digital key ↗
09/03/2026B00038168-I1Request digital key ↗
08/27/2026B00915282-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00385050-I1Request digital key ↗
▸Applications & Permits69
▸BISPLAN / WORK APPROVAL APPLICATION39
01/27/2025321119552Open ↗
01/21/2025321119552Open ↗
12/17/2024321119552Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION25
12/20/2023321119552Open ↗
06/14/2022321447261Open ↗
05/13/2021321447261Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
09/24/2019321119552Open ↗
09/20/2019321447261Open ↗
01/31/2018321447261Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/22/2017321447261Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISFLOOD ZONE COMPLIANCE3
07/15/2024321576157Open ↗
03/08/2024321447261Open ↗
01/19/2024321119552Open ↗
▸BISZONING DIAGRAM2
09/19/2017321119552Open ↗
02/24/2017321447261Open ↗
▸Seals & Professional Certifications43
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
02/15/2018321447261Open ↗
02/15/2018321447261Open ↗
02/15/2018321447261Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B00007508-I1Open ↗
09/03/2026B00038168-I1Open ↗
08/27/2026B00915282-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/07/2016340431081Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/07/2016340431081Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/07/2016340431081Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00995391-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING5
04/11/2023321447261Open ↗
03/31/2023321447261Open ↗
02/15/2023321447261Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/25/2016321447261Open ↗
10/25/2016321447261Open ↗
09/12/2016321447261Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
01/10/2025321119552Open ↗
06/13/2024321576157Open ↗
▸BISHEATING SYSTEMS1
03/08/2024321447261Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/07/2024321447261Open ↗
▸BISSPRINKLER SYSTEMS1
02/16/2022321447261Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/24/2025321119552Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST4
12/24/2024321447261Open ↗
12/24/2024321447261Open ↗
10/31/2024321447261Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026B00385050-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00995391-P1Open ↗
08/26/2026B00995391-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/13/2024321447261Open ↗
03/07/2024321447261Open ↗
02/13/2024321447261Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/15/2018321447261Open ↗
02/15/2018321447261Open ↗
06/20/2017321119552Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR LIGHTING POWER1
03/07/2024321447261Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY16
12/23/2024321447261Open ↗
11/15/2024321447261Open ↗
09/20/2024321447261Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
12/24/2024321447261Open ↗
02/15/2018321447261Open ↗
02/15/2018321447261Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/13/2018321447261Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/15/2024321447261Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/08/2024321447261Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/08/2024321447261Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/21/2023321447261Open ↗
▸BISMASONRY1
11/21/2023321447261Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
06/20/2017321119552Open ↗
▸BISHIGH-PRESSURE STEAM PIPING (WELDING)1
11/21/2023321447261Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/21/2023321447261Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/21/2023321447261Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/21/2023321447261Open ↗
▸BISVERTICAL MASONRY FOUNDATION ELEMENTS/PIERS1
11/21/2023321447261Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/03/2026B00007508-I1Open ↗
09/03/2026B00038168-I1Open ↗
08/13/2026B00995391-P1Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/24/2024321447261Open ↗
06/20/2017321119552Open ↗
06/20/2017321119552Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
01/27/2025321119552Open ↗
01/21/2025321119552Open ↗
12/17/2024321119552Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST6
12/24/2024321447261Open ↗
07/16/2024321576157Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B01111778-I1Open ↗
08/13/2026B00385050-I1Open ↗
08/13/2026B01092625-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/12/2016321447261Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00385050-I1Open ↗
08/13/2026B00995391-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT5
06/20/2017321119552Open ↗
05/23/2017321576157Open ↗
09/12/2016321447261Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/15/2024321576157Open ↗
07/15/2024321576157Open ↗
01/24/2024321447261Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/28/2019321447261Open ↗
02/15/2018321447261Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/15/2018321447261Open ↗
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET9
05/23/2017321576157Open ↗
10/25/2016321447261Open ↗
10/25/2016321447261Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
01/15/2025321119552Open ↗
12/24/2024321447261Open ↗
12/24/2024321447261Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/07/2016340431081Open ↗
Showing 1 of 5 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM3
01/10/2025321119552Open ↗
06/20/2017321119552Open ↗
06/01/2015321119552Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
09/10/2024321119552Open ↗
07/16/2024321576157Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/21/2023321447261Open ↗
▸BISCHIMNEYS AND VENTS1
03/08/2024321447261Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/15/2018321447261Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
10/31/2024321447261Open ↗
▸BISTCO - Supporting Documents1
01/21/2025321119552Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01048852-I1Open ↗