303 WEST 66TH STREET · BIN 1030923
💬 Discuss this project
1962Year Built
20Stories
D4Building Class
R8Zoning
426,476 sfGross Floor Area
421Units
LL97 CoveredRent Stabilized4 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: Lincoln Guild Housing · 55,250 sf lot · 7.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsLincoln GuildUnder Construction2 filings
RoofLincoln Guild Housing CORPUnder Construction2p · 3 filings · 9 docs
Floor 18Unit 18GW1 filing · 4 docs
Floor 172 filings · 6 docs
Floor 16Unit 16FW, Unit 16GW4p · 2 filings · 6 docs
Floor 15
Floor 14
Floor 13
Floor 12Unit 12JW1 filing · 2 docs
Floor 11Unit 11EE, Unit 11FE, Unit 11ABE2p · 3 filings · 6 docs
Floor 10Unit 10EE, Unit 10JE, Unit 10KEUnder Construction3 filings · 7 docs
Floor 9
Floor 8Unit 8HW, Unit 8JW1 filing · 16 docs
Floor 7
Floor 6
Floor 5Unit 5B, Unit 5C, Unit 5BC +23 filings · 16 docs
Floor 4
Floor 3Unit 3LW3 filings · 6 docs
Floor 2
Floor 1Lincoln Guild Housing CORP4 filings · 6 docs
Site & exteriorTemporary sidewalk shed for facade workUnder Construction3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lincoln Guild Housing15610/13/2026
Atlas Building103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold609/16/2026
Gallery Restorationspecialty_contractor403/21/2026
Xinos ConstructionGeneral Contractor409/09/2026
Tristar Plumbing & HeatingGeneral Contractor303/21/2026
Nick White ConstructionGeneral Contractor303/21/2026
Mesa ConstructionGeneral Contractor303/21/2026
Wasoff Plumbing & Utility CoPlumbing207/08/2026
Nion ElectricElectrical203/22/2026
PK ElectricElectrical203/22/2026
At Construction & WirelessGeneral Contractor207/08/2026
Giovanni Martini ContractingGeneral Contractor203/21/2026
Renovation by MY HomeGeneral Contractor203/21/2026
Zaq ConstructionGeneral Contractor203/21/2026
Highland PlumbingPlumbing207/08/2026
Tristar Plumbing & HeatingPlumbing207/08/2026
Bright Remodeling & ConstructionGeneral Contractor107/08/2026
Create Renovation & DesignGeneral Contractor107/08/2026
Essential RemodelingGeneral Contractor104/09/2026
Joseph Weinstein ElectricElectrical103/22/2026
Signore & Sons PlumbingPlumbing107/08/2026
Kle ConstructionGeneral Contractor107/08/2026
Gotham Wiring LicensedElectrical103/22/2026
MP WallsGeneral Contractor107/08/2026
Erg Electric CoElectrical103/21/2026
Star Plumbing & HeatingPlumbing107/08/2026
Lina ElectricElectrical103/21/2026
Walter GuerreroGeneral Contractor107/08/2026
Montgomery Electrical ContractingElectrical103/21/2026
TMS Plumbing & HeatingPlumbing107/08/2026
Big City Electrical SolutionsElectrical103/22/2026
Bypass MechanicalPlumbing107/08/2026
Raza ElectricElectrical103/21/2026
Gsa ElectricElectrical103/21/2026
Flint MechanicalPlumbing107/08/2026
A+ Electric of Greater NYElectrical103/22/2026
Singer Electric CoElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Adm Construction NYGeneral Contractor107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898506/26/2026
Michael Zenreich Architects1724104/28/2026
Ryan Special Engineering2018209/09/2025
Steel Core Engineering PL1098208/20/2025
Buildtech Engineering6369111/09/2023
Rand Engineering & Architects266103/07/2023
Dean Mendez Architect, P8621103/07/2023
Domani Inspection Service843101/16/2023
Wong Architect1272202/02/2022
Rad Design & Architecture2082107/16/2021
Robert Safran Architect3595104/26/2021
Menotti Engineering & Con6980112/20/2019
Gregory V. Perotto, P.E947312/20/2019
Building Lifecycle
All (266)Filed (36)Permit Issued (42)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (26)Objection (38)Special Inspection (30)
10/06/2026
Violation issued (ECB, open)
Construction
10/06/2026
Violation issued (ECB, open)
Unknown
10/06/2026
Violation issued (ECB, open)
Unknown
09/15/2026
Permit issued — Sidewalk Shed
M01414671-I1-SH
09/08/2026
Permit issued — General Construction
M01387553-I1-GC
07/10/2026
Filed — Alteration
Work includes per the filed plans provide davit structure on roof.
M01387553-P1
07/10/2026
Special inspection requirement — Post-installed Anchors
07/10/2026
Special inspection requirement — Final
07/10/2026
Special inspection requirement — Insulation placement and R values
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/09/2026
Special inspection requirement — Insulation placement and R values
07/09/2026
Special inspection requirement — Post-installed Anchors
07/09/2026
Special inspection requirement — Final
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Permit issued — Suspended Scaffold
M01414617-I1-SC
06/26/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01414613-I1
06/26/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR MATERIAL HOIST FOR ROOF REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01414617-I1
06/26/2026
Permit issued — Supported Scaffold
M01414613-I1-SF
06/23/2026
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01414671-I1
06/23/2026
Permit issued — Sidewalk Shed
M01414671-I1-SH
06/09/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/09/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
06/09/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/05/2026
Permit issued — General Construction
M01391813-I1-GC
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/20/2026
Filed — Alteration
Work includes per the filed plans provide davit structure on roof.
M01387553-I1
05/20/2026
Signed off — Alteration
CONSTRUCTION OF PARTITION PER PLANS, REPLACEMENT OF EXISTING PLUMBING FIXTURES IN SAME LOCATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01377983-I1
05/19/2026
Objection raised — Other
05/19/2026
Objection raised — Energy
05/19/2026
Objection raised — Scope
04/28/2026
Filed — Alteration
Applications being filed for interior renovations of Apt 10EE. Work includes non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
M01391813-I1
04/27/2026
Permit issued — General Construction
M01377983-I1-GC
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
04/27/2026
Special inspection requirement — Post-installed Anchors
Michael Zenreich
04/26/2026
Special inspection requirement — Lighting in dwelling units
RAMI IDLBY
04/23/2026
Special inspection requirement — Final
RAMI IDLBY
04/16/2026
Signed off — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR MATERIAL HOIST FOR ROOF REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01226851-I1
03/25/2026
Filed — Alteration
CONSTRUCTION OF PARTITION PER PLANS, REPLACEMENT OF EXISTING PLUMBING FIXTURES IN SAME LOCATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01377983-I1
03/25/2026
Special inspection requirement — Final
Ian Bentley
02/17/2026
Signed off — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-I1
02/17/2026
Signed off — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-S1
01/15/2026
Signed off — Alteration
MATERIAL HOIST
M01284705-I1
01/15/2026
Permit issued — Suspended Scaffold
M01284705-I1-SC
11/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2025
Permit issued — General Construction
M01284105-I1-GC
10/01/2025
Permit issued — Plumbing
M01284105-S1-PL
09/30/2025
Objection raised — Fire_Protection
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection raised — Admin
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Admin
09/18/2025
Permit issued — General Construction
M01269605-I1-GC
09/15/2025
Permit issued — Suspended Scaffold
M01284705-I1-SC
09/09/2025
Filed — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-I1
09/09/2025
Filed — Alteration
Plumbing work related to the combination of apartments 5JW and 5HW on the 5th floor.
M01284105-S1
Latest 60 of 266 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/15/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction06/29/2026
DOB NOWSupported ScaffoldPermit IssuedXinos Construction06/26/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/23/2026
DOB NOWGeneral ConstructionPermit IssuedAdm Construction NY06/05/2026
DOB NOWGeneral ConstructionSigned-offBright Remodeling & Construction04/27/2026
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co01/15/2026
DOB NOWGeneral ConstructionSigned-offNick White Construction10/07/2025
DOB NOWPlumbingSigned-offSignore & Sons Plumbing10/01/2025
DOB NOWGeneral ConstructionPermit IssuedEssential Remodeling09/18/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co09/15/2025
DOB NOWSuspended ScaffoldSigned-offXinos Construction05/16/2025
DOB NOWGeneral ConstructionSigned-offGallery Restoration01/13/2025
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co09/30/2024
DOB NOWPlumbingSigned-offHighland Plumbing09/27/2024
DOB NOWGeneral ConstructionPermit IssuedXinos Construction05/15/2024
DOB NOWGeneral ConstructionSigned-offZaq Construction04/16/2024
DOB NOWGeneral ConstructionSigned-offAt Construction & Wireles04/11/2024
DOB NOWSuspended ScaffoldSigned-offXinos Construction03/15/2024
DOB NOWSidewalk ShedSigned-offXinos Construction02/15/2024
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I01/12/2024
DOB NOWGeneral ConstructionSigned-offGallery Restoration12/18/2023
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co09/18/2023
DOB NOWPlumbingSigned-offHighland Plumbing08/08/2023
DOB NOWGeneral ConstructionSigned-offKle Construction06/09/2023
DOB NOWGeneral ConstructionSigned-offAt Construction & Wireles05/25/2023
DOB NOWGeneral ConstructionPermit IssuedXinos Construction04/25/2023
DOB NOWSidewalk ShedSigned-offXinos Construction01/12/2023
DOB NOWPlumbingSigned-offBypass Mechanical09/28/2022
DOB NOWGeneral ConstructionSigned-offWalter Guerrero08/31/2022
DOB NOWPlumbingSigned-offFlint Mechanical08/30/2022
DOB NOWPlumbingSigned-offTMS Plumbing & Heating03/22/2022
DOB NOWGeneral ConstructionSigned-offRenovation by MY Home02/16/2022
DOB NOWGeneral ConstructionSigned-offMP Walls08/30/2021
DOB NOWGeneral ConstructionSigned-offCreate Renovation & Desig08/25/2021
DOB NOWPlumbingSigned-offStar Plumbing & Heating06/14/2021
DOB NOWGeneral ConstructionSigned-offMesa Construction05/27/2021
DOB NOWMechanical SystemsSigned-offTristar Plumbing & Heating09/22/2020
DOB NOWMechanical SystemsSigned-offBartosz Winsko03/03/2020
+ 52 more permits on file
1 project · most recent 12/20/2019
Others
FiledStatusContractorScopeMake / Model / Capacity
12/20/2019Signed-offTristar Plumbing & HeatingOthers
Other
Enervex BEF500X 2,800 CFM · Exhaust Fan ×1
3 projects · most recent 08/20/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/20/2025——Gas, Water/Sanitary
12/20/2019Signed-offTristar Plumbing & HeatingGas, Plumbing-Sprinkler
12/20/2019Signed-offTristar Plumbing & HeatingGas, Plumbing-Sprinkler
25 projects · most recent 10/06/2026
General Wiring
FiledStatusContractorScope
10/06/2026CompleteNew York City Electric—
09/15/2026Permit IssuedTower Electric—
06/23/2026Permit Issued220 ElectricGeneral Wiring
01/06/2026Permit IssuedLina ElectricGeneral Wiring
09/30/2025Permit IssuedBig City Electrical SolutionsGeneral Wiring
09/24/2025Permit IssuedPremium ElectricGeneral Wiring
06/06/2025CompleteTower Electric—
02/24/2025CompleteNion ElectricGeneral Wiring
02/10/2025CompleteVoltron ElectricGeneral Wiring
01/20/2025CompletePrudent ElectricGeneral Wiring
12/26/2023CompleteDagnachew & Associates—
12/23/2023CompleteDeluxe Electrical & MaintenanceGeneral Wiring
10/26/2023CompleteJoseph Weinstein ElectricGeneral Wiring
10/26/2023CompleteSunbird Electrical ContractingGeneral Wiring
06/13/2023CompletePK ElectricGeneral Wiring
1 project · most recent 07/10/2026
FiledStatusContractorScope
07/10/2026Permit IssuedXinos Construction1 scope_items
2 projects · most recent 06/26/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/26/2026Permit IssuedXinos ConstructionScaffold
06/23/2026Permit IssuedXinos ConstructionSidewalk Shed
1 project · most recent 06/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/26/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
11/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
07/10/2026Post-installed Anchors—special
07/10/2026Tenant Protection Plan Compliance—special
07/10/2026Final—progress
07/10/2026Insulation placement and R values—energy_progress
07/09/2026Post-installed Anchors—special
07/09/2026Tenant Protection Plan Compliance—special
07/09/2026Final—progress
07/09/2026Insulation placement and R values—energy_progress
06/09/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
06/09/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
06/09/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/27/2026Fire-Resistant Penetrations and JointsMichael Zenreichspecial
04/27/2026Post-installed AnchorsMichael Zenreichspecial
04/26/2026Lighting in dwelling unitsRAMI IDLBYenergy_progress
04/23/2026FinalRAMI IDLBYprogress
03/25/2026FinalIan Bentleyprogress
09/09/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/09/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/09/2025FinalAUDRA MANZANOprogress
08/15/2025Maintenance informationChad Murphyenergy_progress
08/15/2025Lighting controlsChad Murphyenergy_progress
08/15/2025Lighting in dwelling unitsChad Murphyenergy_progress
08/15/2025Interior lighting powerChad Murphyenergy_progress
08/14/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
08/14/2025Energy Code Compliance InspectionsChad Murphyprogress
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lincoln GuildOtherFloors 1–20, Roof
Project M01387553 Alteration · Permit Entire · 05/20/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 798 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch31
09/03/2026M00521292-I1Request digital key ↗
09/03/2026M00558574-I1Request digital key ↗
09/02/2026M00667028-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00281966-I1Request digital key ↗
09/05/2026M00281973-I1Request digital key ↗
08/15/2026M00466413-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00281971-I1Request digital key ↗
09/05/2026M00281976-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00466394-I1Request digital key ↗
▸Applications & Permits150
▸BISWORK PERMIT APPLICATION78
09/07/2021110004566Open ↗
12/21/2020121625474Open ↗
01/06/2020123849498Open ↗
Showing 3 of 78 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION71
02/06/2022140647637Open ↗
02/06/2022140659927Open ↗
02/06/2022140669211Open ↗
Showing 3 of 71 on file for this type
▸BISAPPLICATION MUST REINSTSTED FOR ADDITIONAL WORK1
10/07/2021110004566Open ↗
▸Seals & Professional Certifications217
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION73
09/18/2019110033721Open ↗
09/18/2019110033721Open ↗
03/19/2019122953438Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/03/2026M00466394-I1Open ↗
09/03/2026M00521292-I1Open ↗
09/03/2026M00558574-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/12/2026M00281971-I1Open ↗
09/01/2026M00281976-I1Open ↗
08/27/2026M01269605-S1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/12/2026M00281971-I1Open ↗
09/12/2026M00281971-I1Open ↗
09/02/2026M00281966-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
07/21/2017123328657Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
07/21/2017123328657Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
07/17/2017140669211Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
07/17/2017140669211Open ↗
Showing 1 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
04/20/2020123849498Open ↗
02/26/2019123849498Open ↗
01/09/2019122953438Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING13
06/08/2020123849498Open ↗
06/04/2020123849498Open ↗
05/07/2020123849498Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes13
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
09/29/2017123184712Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00281976-I1Open ↗
08/13/2026M00281971-I1Open ↗
08/13/2026M00281973-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/03/2026M00466394-I1Open ↗
09/03/2026M00558574-I1Open ↗
09/02/2026M00667028-I1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
02/26/2019123849498Open ↗
09/29/2017123184712Open ↗
Showing 2 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/21/2018123191802Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance58
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
03/19/2019122953438Open ↗
02/26/2019123849498Open ↗
10/02/2018121625474Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
03/19/2019122953438Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
07/31/2020123849498Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00466394-I1Open ↗
08/13/2026M00558574-I1Open ↗
09/02/2026M00667016-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
10/13/2021110004566Open ↗
10/08/2021110004566Open ↗
09/30/2021110004566Open ↗
Showing 3 of 10 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
10/14/2021110004566Open ↗
▸Approvals, Objections & Sign-offs61
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
10/14/2021110004566Open ↗
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSUPERSEDING LETTER11
09/07/2021110004566Open ↗
12/21/2020121625474Open ↗
08/27/2019121625474Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/24/2018121291011Open ↗
Showing 1 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
11/03/2017121291011Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT60
10/14/2021110004566Open ↗
09/11/2020123191802Open ↗
07/31/2020123849498Open ↗
Showing 3 of 60 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/14/2021110004566Open ↗
▸Filing & Intake Forms59
▸BISEFILING COVER SHEET22
02/26/2019123849498Open ↗
03/21/2018123191802Open ↗
09/29/2017123184712Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM19
09/07/2021110004566Open ↗
04/20/2020123849498Open ↗
09/18/2019110033721Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION10
10/07/2021110004566Open ↗
11/15/2019121625474Open ↗
10/24/2019123849498Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
07/17/2017140669211Open ↗
Showing 1 of 8 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/19/2017123328657Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWManufacturer's Specifications4
08/16/2026M01414617-I1Open ↗
08/13/2026M01018898-I1Open ↗
08/13/2026M01284705-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/16/2026M01414617-I1Open ↗
08/13/2026M01226851-I1Open ↗
08/13/2026M01284705-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
08/13/2026M00811890-I1Open ↗