← Back
Foreign government
Beaux-Arts Institute of Design
304 EAST 44 STREET · Murray Hill-Kips Bay · BIN 1038672
💬 Discuss this project
1928Year Built
5Stories
Z4Building Class
C5-2Zoning
37,395 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Foreign government · 5,925 sf lot · 6.31 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof8p · 2 filings · 12 docs
Floor 613p · 3 filings · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior8p · 2 filings · 8 docs
Filed — no permit issued1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
304 EAST 44 ST CORP203/22/2026
CAJ CONSTRUCTION103/22/2026
304 EAST 44TH ST.CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ ENGINEERING, P.C210/29/2020
JOHN WALSH106/25/2020
BICALURO ASSOCIATES PC306/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING803/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor407/08/2026
DELL MECHANICAL CORPPlumbing207/08/2026
JOHN AHRENSElectrical103/21/2026
ROBERT FINNElectrical103/21/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
CAJ CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BECKER ENGINEERING, PC633306/25/2020
Building Lifecycle
All (73)Filed (6)Permit Issued (6)Signed Off (4)Violation (36)Inspection (6)Objection (10)Special Inspection (5)
10/11/2024
Signed off — Alteration
HVAC system associated with 6th floor renovation. No change to use, egress, or occupancy.
M00343792-I1
09/03/2024
Signed off — Alteration
Modification to existing sprinkler system to accommodate architectural work on the 6th floor. No change to use, egress or occupancy under this application.
M00345433-I1
03/18/2023
Violation issued (FDNY_NOV, closed)
01/26/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/19/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/19/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
05/12/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2022
Permit issued — Sprinklers
M00345433-I1-EW-SP
02/16/2022
Permit issued — Plumbing
M00345314-I1-PL
01/14/2022
Permit issued — Plumbing
M00345314-I1-PL
12/20/2021
Permit issued — Mechanical Systems
M00343792-I1-MS
09/17/2021
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00419755-I1
09/17/2021
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00419750-I1
10/30/2020
Permit issued — Sidewalk Shed
M00419750-I1-SH
10/30/2020
Permit issued — Supported Scaffold
M00419755-I1-SF
10/29/2020
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00419755-I1
10/29/2020
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00419750-I1
10/27/2020
Special inspection requirement — Final
Karol Zdancewicz
10/27/2020
Special inspection requirement — Final
Karol Zdancewicz
08/21/2020
Violation issued (ECB, closed)
Construction
06/25/2020
Filed — Alteration
M00336394-I1
06/08/2020
Objection raised — Scope
06/08/2020
Objection resolved — Addressed
06/08/2020
Objection raised — Scope
06/08/2020
Objection resolved — Addressed
06/04/2020
Objection raised — Other
06/04/2020
Objection resolved — Addressed
06/04/2020
Objection raised — Other
06/04/2020
Objection resolved — Addressed
06/04/2020
Objection raised — Other
06/04/2020
Objection resolved — Addressed
06/03/2020
Filed — Alteration
HVAC system associated with 6th floor renovation. No change to use, egress, or occupancy.
M00343792-I1
06/03/2020
Filed — Alteration
Modification to existing sprinkler system to accommodate architectural work on the 6th floor. No change to use, egress or occupancy under this application.
M00345433-I1
06/03/2020
Filed — Alteration
Install kitchen, bathroom and laundry fixtures on the 6th floor. No change to use, egress or occupancy.
M00345314-I1
04/29/2020
Special inspection requirement — Sprinkler Systems
John Becker
04/22/2020
Special inspection requirement — Mechanical Systems
John Becker
04/22/2020
Special inspection requirement — Final
John Becker
07/24/2018
Violation issued (FDNY_NOV, closed)
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2015
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
10/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/23/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/29/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/29/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/12/2009
Violation issued (FDNY_ORDER, closed)
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/28/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/17/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/12/2006
Violation issued (FDNY_ORDER, closed)
03/28/2005
Violation issued (FDNY_ORDER, closed)
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/30/2001
Violation issued (ECB, closed)
Elevators
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP02/17/2022
DOB NOWPlumbingPermit IssuedDELL MECHANICAL CORP02/16/2022
DOB NOWPlumbingPermit IssuedDELL MECHANICAL CORP01/14/2022
DOB NOWMechanical SystemsSigned-offCAJ CONSTRUCTION12/20/2021
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC10/30/2020
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC10/30/2020
BIS—ISSUEDCAJ CONSTRUCTION CORP02/14/2023
BISMHISSUEDCAJ CONSTRUCTION CORP02/14/2023
BISOTISSUEDCAJ CONSTRUCTION CORP02/14/2023
BISOTISSUEDCAJ CONSTRUCTION CORP02/14/2023
BISMHISSUEDCAJ CONSTRUCTION CORP11/18/2021
BIS—ISSUEDCAJ CONSTRUCTION CORP11/18/2021
BISOTISSUEDCAJ CONSTRUCTION CORP11/18/2021
BISOTISSUEDCAJ CONSTRUCTION CORP11/18/2021
BIS—ISSUEDCAJ CONSTRUCTION CORP08/21/2020
BISOTISSUEDCAJ CONSTRUCTION CORP08/14/2020
BISOTISSUEDCAJ CONSTRUCTION CORP07/08/2020
BISMHISSUEDCAJ CONSTRUCTION CORP07/08/2020
BISOTISSUEDCAJ CONSTRUCTION CORP07/08/2020
BISSPISSUEDFULL CAPACITY FIRE CORP07/06/2020
BISOTISSUEDCAJ CONSTRUCTION CORP01/14/2020
BISOTISSUEDCAJ CONSTRUCTION CORP01/14/2020
BISMHISSUEDCAJ CONSTRUCTION CORP01/14/2020
BISMHISSUEDCAJ CONSTRUCTION CORP02/19/2019
BISOTISSUEDCAJ CONSTRUCTION CORP02/19/2019
BISOTISSUEDCAJ CONSTRUCTION CORP02/19/2019
BISSPISSUEDFULL CAPACITY FIRE CORP04/10/2018
BISPLISSUEDDELL MECHANICAL CORP01/19/2018
BISMHISSUEDCAJ CONSTRUCTION CORP01/18/2018
BISOTISSUEDCAJ CONSTRUCTION CORP01/12/2018
BISOTISSUEDCAJ CONSTRUCTION CORP01/12/2018
BISEQISSUEDOUTDOOR INSTALLATIONS LLC12/08/2006
BISOTISSUEDGREAT WILL CONSTRUCTION11/29/2006
BISEQISSUEDADVANCED INSTALL. INC06/20/2005
BISOTISSUEDLOTUS CONSTR & DEV CORP12/01/1998
BISEQISSUEDHEYDT CONTRACTING CORP03/27/1991
BISEQISSUEDHEYDT CONT.11/15/1990
BISEQISSUEDHEYDT CONTRACTING CORP11/08/1990
1 project · most recent 06/03/2020
Gas Water/Sanitary
FiledStatusContractorScope
06/03/2020Permit IssuedDELL MECHANICAL CORPGas, Water/Sanitary
2 projects · most recent 11/03/2020
General Wiring
FiledStatusContractorScope
11/03/2020Permit IssuedBOROWIDE ELECT'L CONTR'S—
03/21/2018Permit IssuedBELMONT ELECTRICAL, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/12/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/27/2020FinalKarol Zdancewiczprogress
10/27/2020FinalKarol Zdancewiczprogress
04/29/2020Sprinkler SystemsJohn Beckerspecial
04/22/2020Mechanical SystemsJohn Beckerspecial
04/22/2020FinalJohn Beckerprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Egypt Mission toOfficeFloor 6
Project M00345314 Alteration · Permit Entire · 06/03/2020
Project M00345433 Alteration · LOC Issued · 06/03/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00419755-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00345314-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00343792-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00345433-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00419750-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00336394-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION26
04/11/2023122775853Open ↗
04/11/2023140927781Open ↗
05/24/2022122732819Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION15
08/21/2020123855890Open ↗
08/14/2020140927781Open ↗
06/26/2020122775853Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00336394-I1Open ↗
08/13/2026M00343792-I1Open ↗
08/13/2026M00345314-I1Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/21/2020123855890Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/21/2020123855890Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
07/15/2020123855890Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/10/2020123855890Open ↗
08/31/2018122732819Open ↗
08/31/2018122732819Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/04/2026M00336394-I1Open ↗
08/13/2026M00345314-I1Open ↗
08/13/2026M00343792-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M00343792-I1Open ↗
08/24/2026M00419755-I1Open ↗
08/23/2026M00419750-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026M00343792-I1Open ↗
08/24/2026M00345433-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2020140927781Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
09/11/2020122775853Open ↗
09/10/2020122732819Open ↗
08/25/2020122732819Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/03/2016122775853Open ↗
04/06/2016122732819Open ↗
▸BISEQUIPMENT USE PERMITS1
10/25/2023122732819Open ↗
▸BISSPRINKLER SYSTEMS1
04/24/2023122775853Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/25/2023122732819Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/21/2020123855890Open ↗
▸BISSTREET TREE CHECKLIST1
02/10/2020123855890Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/10/2020123855890Open ↗
06/09/2016122797580Open ↗
05/03/2016122775853Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00345433-I1Open ↗
08/13/2026M00345314-I1Open ↗
08/13/2026M00343792-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/10/2020123855890Open ↗
04/06/2016122732819Open ↗
04/06/2016122732819Open ↗
▸BISNYCECC EXEMPTION2
08/07/2020140927781Open ↗
07/15/2020123855890Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/15/2020123855890Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/25/2023122732819Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY9
05/08/2023122775853Open ↗
06/29/2021123855890Open ↗
10/01/2020122732819Open ↗
Showing 3 of 9 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS3
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
09/23/2021123855890Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/25/2023122732819Open ↗
04/24/2023122775853Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
▸BISMECHANICAL SYSTEMS1
07/25/2023122732819Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
07/25/2023140927781Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/25/2023122732819Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/25/2023140927781Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/04/2026M00336394-I1Open ↗
08/13/2026M00345314-I1Open ↗
08/13/2026M00343792-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL5
04/06/2021123855890Open ↗
08/07/2020140927781Open ↗
07/17/2020123855890Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/07/2020123855890Open ↗
02/10/2020123855890Open ↗
02/10/2020123855890Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
05/08/2023122775853Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/25/2023140927781Open ↗
02/10/2020123855890Open ↗
04/11/2018122775853Open ↗
▸BISLANDMARKS SIGNOFF1
07/25/2023140927781Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT9
04/01/2021123855890Open ↗
08/07/2020140927781Open ↗
02/10/2020123855890Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/26/2023122775853Open ↗
07/25/2023140927781Open ↗
07/25/2023122732819Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION7
05/27/2022122732819Open ↗
01/25/2022122732819Open ↗
04/28/2021123855890Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
02/10/2020123855890Open ↗
06/09/2016122797580Open ↗
05/03/2016122775853Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/07/2020140927781Open ↗
▸BISBOROUGH INTAKE FORM1
03/29/2018122775853Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
02/10/2020123855890Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/12/2016122732819Open ↗