← Back
Elevator cooperative
304 EAST 52 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1039670
💬 Discuss this project
1915Year Built
6.5Stories
D4Building Class
R8BZoning
8,759 sfGross Floor Area
10Units
Rent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Elevator cooperative · Owner of record: BELMONT 52 LLC · 2,059 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction64p · 5 filings · 20 docs
PenthouseUnder Construction76p · 5 filings · 20 docs
Floor 6Under Construction64p · 5 filings · 20 docs
Floor 5Under Construction70p · 5 filings · 20 docs
Floor 4Under Construction73p · 6 filings · 20 docs
Floor 3Under Construction75p · 6 filings · 20 docs
Floor 2Under Construction75p · 6 filings · 20 docs
Floor 1Under Construction65p · 6 filings · 20 docs
CellarUnder Construction84p · 8 filings · 20 docs
Site & exterior17p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELMONT 52 LLC2907/08/2026
OWNERS REP1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2020$4.1M—— → —$468/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1403/21/2026
JAM CONSULTANTS, INC.4403/21/2026
NH EXPEDITING AND CONSULTING LLC203/21/2026
METROPOLIS GROUP INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROYAL EMPRESS INCGeneral Contractor7207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor907/08/2026
ZONE PLUMBING & HEATING CPlumbing407/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical203/22/2026
VILLAGE P & H NY INCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62522209/04/2026
Building Lifecycle
All (177)Filed (34)Permit Issued (45)Signed Off (12)Violation (23)Inspection (11)Objection (22)Special Inspection (30)
09/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P8
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
08/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P7
04/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P6
04/21/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
02/25/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Admin
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P5
12/04/2025
Signed off — Alteration
Installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584090-I1
05/22/2025
Signed off — Alteration
Installation of mechanical equipment and related ductwork as shown on drawings filed herewith. No change in use, egress, or occupancy. Filed in conjunction with ALT 1# M00516029
M00584086-I1
05/14/2025
Permit issued — Plumbing
M00584090-I1-PL
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2025
Signed off — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-I1
12/24/2024
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
12/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/23/2024
Filed — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-P4
12/18/2024
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
12/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P4
12/11/2024
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
11/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2024
Signed off — Alteration
FILING FOR A CONSTRUCTION FENCE TO SAFEGUARD THE PROPERTY DURING CONSTRUCTION.
M00634636-I1
11/01/2024
Permit issued — Sprinklers
M00584096-I1-EW-SP
09/20/2024
Filed — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-P3
09/06/2024
Filed — Alteration
Installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584090-P2
08/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2024
Signed off — Alteration
Removal of non-load bearing partition walls, doors, floors, ceiling, millwork, appliances, fixtures & related piping. Infill existing chimneys & patch wall. Remove masonry garden &privacy walls in rear yard. Contd. in comments
M00452298-I1
07/30/2024
Permit issued — General Construction
M00452298-I1-GC
07/23/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P3
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08035103-I1
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08028222-I1
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08032931-I1
04/01/2024
Violation issued (HPD, closed)
A
03/15/2024
Permit issued — General Construction
M00516029-I1-GC
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C05/14/2025
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC11/01/2024
DOB NOWGeneral ConstructionSigned-offROYAL EMPRESS INC07/30/2024
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC03/15/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/11/2024
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC03/01/2024
DOB NOWConstruction FenceSigned-offROYAL EMPRESS INC03/01/2024
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC01/19/2024
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC01/19/2024
DOB NOWConstruction FenceSigned-offROYAL EMPRESS INC01/19/2024
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC12/29/2023
DOB NOWConstruction FenceSigned-offROYAL EMPRESS INC12/29/2023
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC12/29/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/23/2023
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC09/28/2023
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C09/25/2023
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC09/15/2023
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC09/11/2023
DOB NOWConstruction FenceSigned-offROYAL EMPRESS INC09/11/2023
DOB NOWConstruction FenceSigned-offROYAL EMPRESS INC07/03/2023
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC07/03/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/14/2023
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C01/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/04/2022
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC10/28/2022
DOB NOWStructuralSigned-offROYAL EMPRESS INC10/28/2022
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC10/28/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/28/2022
DOB NOWFoundationSigned-offROYAL EMPRESS INC10/27/2022
DOB NOWGeneral ConstructionPermit IssuedROYAL EMPRESS INC10/24/2022
DOB NOWSupport of ExcavationSigned-offROYAL EMPRESS INC09/20/2022
DOB NOWSupport of ExcavationSigned-offROYAL EMPRESS INC09/20/2022
DOB NOWFoundationSigned-offROYAL EMPRESS INC09/20/2022
DOB NOWStructuralSigned-offROYAL EMPRESS INC09/12/2022
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC09/12/2022
DOB NOWSupport of ExcavationSigned-offROYAL EMPRESS INC05/20/2022
DOB NOWSupport of ExcavationSigned-offROYAL EMPRESS INC03/09/2022
DOB NOWFoundationSigned-offROYAL EMPRESS INC01/22/2022
DOB NOWStructuralSigned-offROYAL EMPRESS INC12/07/2021
DOB NOWMechanical SystemsSigned-offROYAL EMPRESS INC12/07/2021
+ 5 more permits on file
6 projects · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025CompleteTUXEDO ELEC'L CONTR'G INC—
04/11/2023Permit IssuedL J ELEC'L SERV. INC.General Wiring
11/04/2022CompleteSOLAS ELECTRICAL CORP—
08/11/2022Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
11/11/2021Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
12/14/2018Permit IssuedALL WAYS ELECTRIC CORP.W5 meters
1 project · most recent 07/25/2022
Steel Concrete Masonry
FiledStatusContractorScope
07/25/2022Signed-offROYAL EMPRESS INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/03/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
09/02/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
09/02/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
09/02/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
09/02/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/02/2026MasonryINDARDEO PARBHUNATHspecial
09/02/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
09/02/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
09/02/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/24/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/24/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
08/24/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
08/24/2026MasonryINDARDEO PARBHUNATHspecial
08/24/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
08/24/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/24/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
08/24/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
04/21/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
04/21/2026MasonryINDARDEO PARBHUNATHspecial
04/21/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/21/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
04/21/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
04/21/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
04/21/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
04/21/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
12/24/2024Sprinkler SystemsINDARDEO PARBHUNATHspecial
Latest 25 of 87.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch30
09/03/2026M00584069-I1Request digital key ↗
09/03/2026M00584069-P1Request digital key ↗
09/03/2026M00584069-S1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00452298-I1Request digital key ↗
09/03/2026M00452298-P3Request digital key ↗
09/03/2026M00452298-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P4Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-I1Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications117
▸DOB NOWSpecial Inspector Seal & Signature48
10/02/2026M00516029-P6Open ↗
10/02/2026M00516029-P6Open ↗
10/02/2026M00516029-P6Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/03/2026M00584069-S1Open ↗
09/03/2026M00584069-I1Open ↗
09/03/2026M00584069-P1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
10/02/2026M00516029-P6Open ↗
10/02/2026M00516029-P6Open ↗
10/02/2026M00516029-P6Open ↗
Showing 3 of 34 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/03/2026M00584090-P1Open ↗
09/03/2026M00584090-I1Open ↗
09/03/2026M00584090-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00584069-I1Open ↗
08/13/2026M00452298-I1Open ↗
08/13/2026M00516029-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00516029-I1Open ↗
08/13/2026M00584086-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00516029-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00516029-I1Open ↗
▸Other Documents20
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P4Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P6Open ↗
08/17/2026M00516029-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/15/2026M00656249-I1Open ↗
08/15/2026M00633228-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00516029-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00516029-I1Open ↗