← Back
BuildNYC
Elevator cooperative
304 EAST 52ND STREET
MANHATTAN · BIN 1039670
💬 Discuss this project
1915Year Built
6.5Stories
D4Building Class
R8BZoning
8,759 sfGross Floor Area
10Units
Rent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸
Elevator cooperative · Owner of record: Belmont 52 · 2,059 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBelmont 52 LLC64p · 5 filings · 20 docs
PenthouseUnit PH276p · 5 filings · 20 docs
Floor 6Belmont 52 LLC64p · 5 filings · 20 docs
Floor 5Belmont 52 LLC71p · 5 filings · 20 docs
Floor 4Belmont 52 LLC74p · 6 filings · 20 docs
Floor 3Belmont 52 LLC76p · 6 filings · 20 docs
Floor 2Belmont 52 LLC75p · 6 filings · 20 docs
Floor 1Belmont 52 LLC65p · 6 filings · 20 docs
CellarBelmont 52 LLC85p · 8 filings · 20 docs
Site & exteriorNon-load bearing partition removal18p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Issembert Companies3209/15/2026
Belmont 522907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2020$4.1M—— → —$468/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1403/21/2026
KM Associates of New York2203/21/2026
NH Expediting and Consulting203/21/2026
Metropolis Group403/21/2026
K & M Associates2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Royal EmpressGeneral Contractor5807/08/2026
Royal EmpressScaffold1407/08/2026
Core Scaffold SystemsScaffold907/08/2026
Zone Plumbing & HeatingPlumbing407/08/2026
Tuxedo Electrical ContractingElectrical203/22/2026
Village P & H NYFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I62522209/04/2026
Building Lifecycle
All (173)Filed (34)Permit Issued (45)Signed Off (12)Violation (21)Inspection (9)Objection (22)Special Inspection (30)
09/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P8
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
09/02/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
08/24/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
08/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P7
04/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P6
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
04/21/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
02/25/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Admin
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P5
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/29/2026
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
01/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
01/29/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
01/29/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
01/29/2026
Special inspection requirement — Sprayed fire-resistant materials
INDARDEO PARBHUNATH
12/04/2025
Signed off — Alteration
Installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584090-I1
05/22/2025
Signed off — Alteration
Installation of mechanical equipment and related ductwork as shown on drawings filed herewith. No change in use, egress, or occupancy. Filed in conjunction with ALT 1# M00516029
M00584086-I1
05/14/2025
Permit issued — Plumbing
M00584090-I1-PL
01/08/2025
Signed off — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-I1
12/23/2024
Filed — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-P4
12/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P4
12/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
11/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2024
Signed off — Alteration
FILING FOR A CONSTRUCTION FENCE TO SAFEGUARD THE PROPERTY DURING CONSTRUCTION.
M00634636-I1
11/01/2024
Permit issued — Sprinklers
M00584096-I1-EW-SP
09/20/2024
Filed — Alteration
Installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584096-P3
09/06/2024
Filed — Alteration
Installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
M00584090-P2
07/31/2024
Signed off — Alteration
Removal of non-load bearing partition walls, doors, floors, ceiling, millwork, appliances, fixtures & related piping. Infill existing chimneys & patch wall. Remove masonry garden &privacy walls in rear yard. Contd. in comments
M00452298-I1
07/30/2024
Permit issued — General Construction
M00452298-I1-GC
07/23/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P3
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08035103-I1
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08028222-I1
04/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08032931-I1
04/01/2024
Violation issued (HPD, closed)
A
03/15/2024
Permit issued — General Construction
M00516029-I1-GC
03/11/2024
Permit issued — Supported Scaffold
M08035103-I1-SF
03/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing for vertical and horizontal enlargement for six story building. Tenant Fit-Out work, as shown on drawings filed herewith.
M00516029-P2
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZone Plumbing & Heating05/14/2025
DOB NOWSprinklersSigned-offVillage P & H NY11/01/2024
DOB NOWGeneral ConstructionSigned-offRoyal Empress07/30/2024
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress03/15/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/11/2024
DOB NOWConstruction FenceSigned-offRoyal Empress03/01/2024
DOB NOWMechanical SystemsSigned-offRoyal Empress03/01/2024
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress01/19/2024
DOB NOWMechanical SystemsSigned-offRoyal Empress01/19/2024
DOB NOWConstruction FenceSigned-offRoyal Empress01/19/2024
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress12/29/2023
DOB NOWConstruction FenceSigned-offRoyal Empress12/29/2023
DOB NOWMechanical SystemsSigned-offRoyal Empress12/29/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/23/2023
DOB NOWSprinklersSigned-offVillage P & H NY09/28/2023
DOB NOWPlumbingSigned-offZone Plumbing & Heating09/25/2023
DOB NOWMechanical SystemsSigned-offRoyal Empress09/15/2023
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress09/11/2023
DOB NOWConstruction FenceSigned-offRoyal Empress09/11/2023
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress07/03/2023
DOB NOWConstruction FenceSigned-offRoyal Empress07/03/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/14/2023
DOB NOWPlumbingSigned-offZone Plumbing & Heating01/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems11/04/2022
DOB NOWMechanical SystemsSigned-offRoyal Empress10/28/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/28/2022
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress10/28/2022
DOB NOWStructuralSigned-offRoyal Empress10/28/2022
DOB NOWFoundationSigned-offRoyal Empress10/27/2022
DOB NOWGeneral ConstructionPermit IssuedRoyal Empress10/24/2022
DOB NOWSupport of ExcavationSigned-offRoyal Empress09/20/2022
DOB NOWFoundationSigned-offRoyal Empress09/20/2022
DOB NOWSupport of ExcavationSigned-offRoyal Empress09/20/2022
DOB NOWStructuralSigned-offRoyal Empress09/12/2022
DOB NOWMechanical SystemsSigned-offRoyal Empress09/12/2022
DOB NOWSupport of ExcavationSigned-offRoyal Empress05/20/2022
DOB NOWSupport of ExcavationSigned-offRoyal Empress03/09/2022
DOB NOWFoundationSigned-offRoyal Empress01/22/2022
DOB NOWStructuralSigned-offRoyal Empress12/07/2021
DOB NOWMechanical SystemsSigned-offRoyal Empress12/07/2021
+ 5 more permits on file
6 projects · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025CompleteTuxedo Electrical Contracting—
04/11/2023Permit IssuedL J Electrical ServiceGeneral Wiring
11/04/2022CompleteSolas Electrical—
08/11/2022Permit IssuedInterstate ElectricGeneral Wiring
11/11/2021Permit IssuedInterstate ElectricGeneral Wiring
12/14/2018Permit IssuedAll Ways Electric Corp.w5 meters
1 project · most recent 07/25/2022
Steel Concrete Masonry
FiledStatusContractorScope
07/25/2022Signed-offRoyal EmpressSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/03/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
09/02/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/02/2026MasonryINDARDEO PARBHUNATHspecial
09/02/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
09/02/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
09/02/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
09/02/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
09/02/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
09/02/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
08/24/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/24/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
08/24/2026MasonryINDARDEO PARBHUNATHspecial
08/24/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
08/24/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/24/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/24/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
04/21/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/21/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
04/21/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
04/21/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
04/21/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
04/21/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
04/21/2026Sprayed fire-resistant materialsINDARDEO PARBHUNATHspecial
04/21/2026MasonryINDARDEO PARBHUNATHspecial
01/29/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
Latest 25 of 95.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch30
09/03/2026M00584069-P1Request digital key ↗
09/03/2026M00584069-I1Request digital key ↗
09/03/2026M00584069-S1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00452298-I1Request digital key ↗
09/03/2026M00452298-P3Request digital key ↗
09/03/2026M00452298-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P4Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P3Open ↗
08/17/2026M00516029-P1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWSpecial Inspector Seal & Signature52
10/03/2026M00516029-P5Open ↗
10/03/2026M00516029-P5Open ↗
10/03/2026M00516029-P5Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/03/2026M00516029-P5Open ↗
10/03/2026M00516029-P5Open ↗
10/03/2026M00516029-P5Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/03/2026M00584069-P1Open ↗
09/03/2026M00584069-I1Open ↗
09/03/2026M00584069-S1Open ↗
Showing 3 of 35 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/03/2026M00584090-I1Open ↗
09/03/2026M00584090-P2Open ↗
09/03/2026M00584090-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00584069-I1Open ↗
08/13/2026M00516029-I1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00516029-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00516029-I1Open ↗
▸Other Documents20
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P4Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/21/2026M00516029-P7Open ↗
08/17/2026M00516029-P4Open ↗
08/17/2026M00516029-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/15/2026M00656249-I1Open ↗
08/15/2026M00633228-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00516029-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00516029-I1Open ↗