← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Nyu Langone Inflammatory Bowel Disease Center
305 EAST 33RD STREET · BIN 1087841
💬 Discuss this project
2009Year Built
12Stories
RMBuilding Class
R8AZoning
136,099 sfGross Floor Area
131Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: KTL 303 · 17,281 sf lot · 7.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSidewalk shed and pedestrian protection1p · 2 filings · 5 docs
Floor 1NYU Langone Health, Burlington31p · 6 filings · 20 docs
CellarNYU Langone Health, Burlington42p · 7 filings · 20 docs
Site & exteriorFacade Restoration9p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KTL 3032003/21/2026
H.kal 34th St1803/21/2026
The Kibel Companies1303/21/2026
NYU Hospital Center1103/21/2026
NYU Langone Health1007/08/2026
303 E 33rd St Condominiums303/21/2026
The Church of the Sacred Hearts203/21/2026
Kips Bay Community Association203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Spar Unlimited104/30/2025
Iaq Systems312/05/2024
Michielli & Wyetzner Architects104/10/2024
FL&M Engineering Design & Inspection105/23/2022
Sullivan112/23/2021
Loring Consulting Engineers712/14/2020
Reuther Bowen105/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group2403/21/2026
Cornerstone Consulting103/21/2026
Rigid Structural Design203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Paul M MaintenanceGeneral Contractor707/08/2026
Bigman BrothersElectrical203/21/2026
Sirina Fire ProtectionFire Protection207/08/2026
Ashlar MechanicalFire Protection107/08/2026
Louis L.buttermark & SonsPlumbing107/08/2026
Andamio ScaffoldingScaffold107/08/2026
Herbert RoseGeneral Contractor107/08/2026
C.M. Richey Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4231112/05/2024
Rimkus New York8123112/23/2021
Building Lifecycle
All (135)Filed (16)Permit Issued (14)Signed Off (11)Facade (FISP) (12)Violation (53)Inspection (1)Special Inspection (28)
06/23/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720:
M01310009-I1
04/29/2026
Cycle 10 facade report signed — SAFE
04/17/2026
Cycle 10 facade report submitted
03/11/2026
Cycle 10 facade inspection completed
12/31/2025
Violation issued (ECB, closed)
Elevators
12/24/2025
Permit issued — Suspended Scaffold
M01310009-I1-SC
11/07/2025
Permit issued — Suspended Scaffold
M01310009-I1-SC
11/03/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720:
M01310009-I1
07/02/2025
Signed off — Alteration
Rigging for industrial rope access.
M01215405-I1
05/19/2025
Permit issued — Suspended Scaffold
M01215405-I1-SC
04/30/2025
Filed — Alteration
Rigging for industrial rope access.
M01215405-I1
01/30/2025
Signed off — Alteration
Modification of existing sprinkler system as shown on drawing . No change to use, egress or occupancy.
M01013322-I1
12/06/2024
Special inspection requirement — Post-installed Anchors
Young Suh
12/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
12/06/2024
Special inspection requirement — Sprinkler Systems
Young Suh
12/05/2024
Filed — Alteration
Modification of existing sprinkler system as shown on drawing . No change to use, egress or occupancy.
M01013322-P1
10/09/2024
Signed off — Alteration
MODIFICATION TO EXISTING DIFFUSER, DUCT WORK AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01013318-I1
10/01/2024
Signed off — Alteration
REMOVAL AND INSTALLATION OF WALLS, DOORS FLOOR FINISHES AND CEILINGS AS SHOWN ON DRAWINGS.
M01013317-I1
07/12/2024
Permit issued — Sprinklers
M01013322-I1-EW-SP
05/10/2024
Permit issued — General Construction
M01013317-I1-GC
05/08/2024
Permit issued — Mechanical Systems
M01013318-I1-MS
04/18/2024
Filed — Alteration
MODIFICATION TO EXISTING DIFFUSER, DUCT WORK AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01013318-I1
04/10/2024
Filed — Alteration
Modification of existing sprinkler system as shown on drawing . No change to use, egress or occupancy.
M01013322-I1
04/10/2024
Filed — Alteration
REMOVAL AND INSTALLATION OF WALLS, DOORS FLOOR FINISHES AND CEILINGS AS SHOWN ON DRAWINGS.
M01013317-I1
03/20/2024
Special inspection requirement — Lighting controls
Young Suh
03/20/2024
Special inspection requirement — Interior lighting power
Young Suh
03/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2024
Special inspection requirement — Lighting controls
Young Suh
03/13/2024
Special inspection requirement — Post-installed Anchors
Young Suh
03/13/2024
Special inspection requirement — Final
Young Suh
03/13/2024
Special inspection requirement — Interior lighting power
Young Suh
03/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/01/2024
Special inspection requirement — Mechanical Systems
Young Suh
03/01/2024
Special inspection requirement — Final
Young Suh
12/27/2022
Cycle 9 facade report submitted
12/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2022
Violation issued (FDNY_NOV, closed)
12/09/2022
Violation issued (FDNY_NOV, closed)
11/30/2022
Cycle 9 facade report signed — SAFE
11/18/2022
Cycle 9 facade inspection completed
09/14/2022
Signed off — Alteration
M00739683-I1
07/22/2022
Signed off — Alteration
M00596967-I1
06/09/2022
Permit issued — General Construction
M00596967-I1-GC
05/23/2022
Filed — Alteration
M00739683-I1
05/23/2022
Permit issued — Sidewalk Shed
M00739683-I1-SH
05/17/2022
Special inspection requirement — Final
FADY HABEEL
01/06/2022
Cycle 9 facade report signed — SWARMP
01/04/2022
Signed off — Alteration
Installation, removal, and relocation of sprinkler fixtures along with related piping.
M00235625-I1
12/23/2021
Filed — Alteration
M00596967-I1
12/17/2021
Cycle 9 facade inspection completed
11/01/2021
Cycle 9 facade report submitted
01/25/2021
Permit issued — Sprinklers
M00235625-I1-EW-SP
01/15/2021
Signed off — Alteration
remove and replace VAV boxes and associated duct work.
M00235585-I1
12/18/2020
Special inspection requirement — Sprinkler Systems
Young Suh
12/14/2020
Filed — Alteration
Installation, removal, and relocation of sprinkler fixtures along with related piping.
M00235625-P2
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offKLG Contracting12/24/2025
DOB NOWSuspended ScaffoldSigned-offKLG Contracting11/07/2025
DOB NOWSuspended ScaffoldSigned-offCerina General Contracting05/19/2025
DOB NOWSprinklersSigned-offAshlar Mechanical07/12/2024
DOB NOWGeneral ConstructionSigned-offPaul M Maintenance05/10/2024
DOB NOWMechanical SystemsSigned-offPaul M Maintenance05/08/2024
DOB NOWGeneral ConstructionSigned-offHerbert Rose06/09/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/23/2022
DOB NOWSprinklersSigned-offSirina Fire Protection01/25/2021
DOB NOWStructuralSigned-offPaul M Maintenance05/27/2020
DOB NOWMechanical SystemsSigned-offPaul M Maintenance04/01/2020
DOB NOWMechanical SystemsSigned-offPaul M Maintenance01/03/2020
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons12/19/2019
DOB NOWSprinklersSigned-offSirina Fire Protection12/19/2019
BISOTISSUEDPaul M Maintenance03/27/2020
BISOTISSUEDPaul M Maintenance12/06/2019
BISOTISSUEDUSA Construction & Painting01/05/2018
BISOTISSUEDAK Premier Contracting04/05/2017
BISOTISSUEDAgo & Alaudin General Con03/21/2017
BISFBISSUEDDemar Plumbing12/03/2014
BISPLISSUEDDemar Plumbing12/03/2014
BISPLISSUEDDemar Plumbing01/31/2014
BISOTISSUEDJ.A. Jennings10/17/2012
BISOTISSUEDJ.A. Jennings05/23/2012
BISMHISSUEDJ.A. Jennings02/22/2012
BISOTRE-ISSUEDJ.A. Jennings02/22/2012
BISEQISSUEDJ.A. Jennings02/22/2012
BISOTISSUEDJ.A. Jennings02/22/2012
BISPLISSUEDPar Plumbing Co11/17/2011
BISSDISSUEDPace Plumbing10/06/2011
BISSPISSUEDPace Plumbing09/06/2011
BISMHISSUEDJ.A. Jennings08/15/2011
BISEQISSUEDJ.A. Jennings08/15/2011
BISOTISSUEDJ.A. Jennings08/15/2011
BISOTISSUEDJ.A. Jennings08/15/2011
BISSPISSUEDFive Borough NYC11/24/2010
BISEQISSUEDKTL 30306/01/2010
BIS—ISSUEDKTL 30305/19/2010
BISPLISSUEDReliable Plumbing & Heating04/28/2010
BISEQISSUEDPerimeter Bridge & Scaffo03/26/2010
+ 24 more permits on file
7 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026CompleteR & T Electrical—
01/17/2025CompleteBigman BrothersGeneral Wiring
05/25/2022CompleteBorowide Elect'l Contractors—
05/04/2022CompletePM Electrical MaintenanceGeneral Wiring
05/20/2021CompletePM Electrical Maintenance—
10/01/2020CompleteC.M. Richey Electrical ContractingGeneral Wiring
01/07/2020CompleteC.M. Richey Electrical Contracting—
1 project · most recent 11/03/2025
Suspended Scaffold
FiledStatusContractorScope
11/03/2025Signed-offKLG ContractingSuspended Scaffold
1 project · most recent 11/03/2025
FiledStatusContractorScope
11/03/2025Signed-offKLG Contracting—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/06/2024Post-installed AnchorsYoung Suhspecial
12/06/2024Tenant Protection Plan ComplianceYoung Suhspecial
12/06/2024Sprinkler SystemsYoung Suhspecial
03/20/2024Lighting controlsYoung Suhenergy_progress
03/20/2024Interior lighting powerYoung Suhenergy_progress
03/20/2024Tenant Protection Plan ComplianceYoung Suhspecial
03/20/2024Tenant Protection Plan ComplianceYoung Suhspecial
03/20/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
03/20/2024HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/13/2024Lighting controlsYoung Suhenergy_progress
03/13/2024Post-installed AnchorsYoung Suhspecial
03/13/2024FinalYoung Suhprogress
03/13/2024Interior lighting powerYoung Suhenergy_progress
03/13/2024Energy Code Compliance InspectionsYoung Suhprogress
03/13/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
03/01/2024Mechanical SystemsYoung Suhspecial
03/01/2024FinalYoung Suhprogress
05/17/2022FinalFADY HABEELprogress
12/18/2020Sprinkler SystemsYoung Suhspecial
05/18/2020Shutoff dampersYoung Suhenergy_progress
05/18/2020FinalYoung Suhprogress
05/18/2020Mechanical SystemsYoung Suhspecial
05/18/2020HVAC insulation and sealing Young Suhenergy_progress
04/22/2020FinalYoung Suhprogress
04/22/2020Shutoff dampersYoung Suhenergy_progress
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYU Langone HealthMedical / HealthcareCellar, Floor 1
Project M01013317 Alteration · LOC Issued · 04/10/2024
Project M01013322 Alteration · LOC Issued · 04/10/2024
BurlingtonRetailCellar, Floor 1
Project M00235604 Alteration · LOC Issued · 12/16/2019
Project M00235585 Alteration · LOC Issued · 12/13/2019
Project M00235625 Alteration · LOC Issued · 12/13/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 458 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch8
09/02/2026M00739683-I1Request digital key ↗
09/01/2026M00596967-I1Request digital key ↗
08/27/2026M01013317-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00235625-I1Request digital key ↗
08/15/2026M00235625-P2Request digital key ↗
08/15/2026M00235625-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00235604-I1Request digital key ↗
08/15/2026M00235604-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00235585-I1Request digital key ↗
08/15/2026M00235585-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00344565-I1Request digital key ↗
▸Applications & Permits103
▸BISPLAN / WORK APPROVAL APPLICATION57
11/01/2019123692147Open ↗
01/03/2018140728443Open ↗
03/27/2017123047899Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION43
03/27/2020123692147Open ↗
12/09/2019123692147Open ↗
01/03/2018140728443Open ↗
Showing 3 of 43 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications123
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
11/06/2019123692147Open ↗
11/01/2019123692147Open ↗
03/27/2017123047899Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00235604-I1Open ↗
09/04/2026M00344565-I1Open ↗
09/04/2026M00235585-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
11/01/2019123692147Open ↗
03/27/2017123047899Open ↗
03/27/2017123047899Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00235585-I1Open ↗
09/01/2026M00235585-I1Open ↗
09/01/2026M00235585-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
05/10/2012121062866Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/06/2026M00235625-P1Open ↗
09/01/2026M00235585-I1Open ↗
08/31/2026M01013317-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/01/2019123692147Open ↗
01/03/2018140728443Open ↗
03/27/2017123047899Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/03/2018140728443Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/03/2018140728443Open ↗
▸Trade Schedules & Equipment44
▸BISSELF-CERT PLUMBING NOTICE13
06/11/2015122158645Open ↗
09/29/2014121911468Open ↗
09/19/2014121911468Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING9
03/09/2015122158645Open ↗
08/26/2011120739950Open ↗
08/18/2011120739950Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
03/25/2015122158645Open ↗
03/06/2015122158645Open ↗
12/09/2014122158645Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
09/20/2013120739941Open ↗
09/09/2013120739941Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
05/21/2012120739950Open ↗
05/03/2012120739950Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
12/09/2014122158645Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/13/2012120739950Open ↗
06/13/2012120739950Open ↗
▸BISEQUIPMENT USE PERMITS1
06/13/2012120739950Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
05/03/2012120739950Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
12/12/2019123692147Open ↗
03/27/2017123047899Open ↗
01/03/2018140728443Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00235604-I1Open ↗
09/04/2026M00344565-I1Open ↗
09/04/2026M00235585-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/01/2019123692147Open ↗
01/03/2018140728443Open ↗
02/03/2014121911468Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/10/2012121062866Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY4
05/07/2012120739950Open ↗
05/07/2012120739950Open ↗
05/07/2012120739950Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/06/2019123692147Open ↗
11/01/2019123692147Open ↗
03/27/2017123047899Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/06/2020123692147Open ↗
11/06/2020123692147Open ↗
01/03/2018140728443Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
11/06/2020123692147Open ↗
05/07/2012120739950Open ↗
06/04/2012120739950Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00235585-I1Open ↗
08/13/2026M00596967-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/03/2018140728443Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/16/2011120739950Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/06/2020123692147Open ↗
11/06/2020123692147Open ↗
01/03/2018140728443Open ↗
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
11/06/2020123692147Open ↗
11/18/2015122158645Open ↗
10/27/2014121911468Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
05/10/2012121062866Open ↗
07/08/2011120739941Open ↗
07/07/2011120739950Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/24/2011120086398Open ↗
Showing 1 of 7 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/13/2011110104020Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT25
11/06/2020123692147Open ↗
11/01/2019123692147Open ↗
01/03/2018140728443Open ↗
Showing 3 of 25 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/13/2011110104020Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET19
11/01/2019123692147Open ↗
03/27/2017123047899Open ↗
12/09/2014122158645Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION13
07/29/2020123692147Open ↗
05/13/2020123692147Open ↗
08/04/2014121911468Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM2
05/13/2020123692147Open ↗
03/27/2020123692147Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/03/2018140728443Open ↗
Showing 1 of 2 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/13/2011110104020Open ↗
04/15/2011110284479Open ↗
04/15/2011110284479Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification2
08/13/2026M01310009-I1Open ↗
08/13/2026M01215405-I1Open ↗
▸BISSafety Monitoring Plan (SMP)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type