← Back
Elevator apt, fireproof without stores
Jackson (NYCHA)
3050 PARK AVENUE · BIN 2091225
💬 Discuss this project
1960Year Built
16Stories
D3Building Class
R8Zoning
748,000 sfGross Floor Area
868Units
LL97 Covered16 Open Violations 11 unresolved · 5 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 343,403 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Roof12p · 2 filings · 20 docs
Bulkhead6p · 1 filing · 20 docs
Cellar4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA7307/08/2026
NYC HOUSING AUTHORITY 9203/22/2026
P K CONTRACTING203/22/2026
NYC HOUSING AUTHORITY603/22/2026
NYCHA 99203/22/2026
NEW YORK CITY HOUSING AUTHORITY503/22/2026
NYHA103/22/2026
NEELAM CONSTRUCTION203/21/2026
SHARAN BUILDERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV603/21/2026
DSENY ENGINEERING SERVICES203/21/2026
AK CONSULTING SERVICES2603/21/2026
GREEN LIGHT EXPEDITING LLC603/21/2026
SUPERSTRUCTURES ENG + ARCH303/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
GAMILL ENGINEERING, PC203/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES LLCGeneral Contractor1607/08/2026
P & K CONTRACTING INCGeneral Contractor1407/08/2026
ROMA SCAFFOLDING INCGeneral Contractor1107/08/2026
RAVEN CONSTRUCTION SERVICGeneral Contractor907/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor307/08/2026
SKYWORX CONTRACTING INCGeneral Contractor307/08/2026
SKYLINE P & H INCPlumbing203/22/2026
KORDUN CONSTRUCTION CORPPlumbing207/08/2026
VINCENT SPINAElectrical103/21/2026
JAMES MAGRIPLESElectrical103/21/2026
GUY FORDElectrical103/21/2026
FORD, GUYElectrical103/21/2026
JCC CONSTRUCTION CORPPlumbing107/08/2026
ALL-STAR ELEC'L SERVICESElectrical103/22/2026
KORDUN CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MT GROUP798304/10/2025
BUREAU VERITAS NA6902509/02/2024
DISTINCT ENGINEERING SOLU2641101/22/2024
AK CONSULTING SERVICES, I6198101/22/2024
JOEL PHAGOO ,PE, PLLC2416101/08/2024
SOCOTEC ENGINEERING4983106/20/2023
BITOPI CONSULTANTS LLC7036101/05/2023
Building Lifecycle
All (175)Filed (28)Permit Issued (40)Signed Off (19)Facade (FISP) (16)Violation (34)Inspection (8)Special Inspection (30)
08/05/2026
Signed off — Alteration
FN/NYCHA JACKSON HOUSES BLDG #5 SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00656586-I1
05/13/2026
Signed off — Alteration
Removal of boiler, connecting to new geothermal hvac system. Jackson building 5
X00733640-I1
05/08/2026
Signed off — Alteration
installing concrete pads for new equipment; jackson building 5
X00734793-I1
05/06/2026
Signed off — Alteration
interior remodel in conjunction with new geothermal hvac system. Jackson building 5
X00752519-I1
05/05/2026
Signed off — Alteration
plumbing connections for new geothermal hvac system. Jackson building 5
X00734180-I1
10/02/2025
Signed off — Alteration
X00548540-I1
09/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/18/2025
Violation issued (FDNY_NOV, closed)
08/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/06/2025
Violation issued (FDNY_NOV, closed)
04/17/2025
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Preliminary
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
04/17/2025
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
04/10/2025
Filed — Alteration
X00548540-P2
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Preliminary
CHRISTOPHER BEHLE
04/09/2025
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
03/20/2025
Signed off — Alteration
MATERIAL HOIST SYSTEM AT 301 EAST 156TH STREET, BRONX
X00994230-I1
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/12/2025
Permit issued — Suspended Scaffold
X00994230-I1-SC
02/25/2025
Signed off — Alteration
NYCHA Jackson Bldg 05, Exterior Faade repairs per the plans, including: Removal / Replacement /Repairs to masonry, concrete slab, shelf angle, slate sills, windows, and joint sealants. Pinning of existing brickwork with adhesive anchors. Expansion Joints.
X00989374-I1
12/04/2024
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00985652-I1
11/28/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879872-I1
11/28/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879129-I1
10/14/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156 STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00879129-P2
10/03/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 301 EAST 156TH STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08033164-I1
10/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 301 EAST 156TH STREET, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08033214-I1
10/03/2024
Signed off — Alteration
X00807794-I1
10/03/2024
Cycle 9 facade report submitted
10/03/2024
Cycle 9 facade report signed — SAFE
09/19/2024
Cycle 9 facade inspection completed
09/16/2024
Signed off — Alteration
NYCHA Jackson Houses Bldg 05, Emergency exterior repairs as per the plans filed, including: Removal of deteriorated brick masonry. Replace steel angle, flashing & brick masonry. Concrete spandrel repair.
X00892684-I1
09/04/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — Final
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
09/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
09/02/2024
Filed — Alteration
plumbing connections for new geothermal hvac system. Jackson building 5
X00734180-P1
09/02/2024
Filed — Alteration
Removal of boiler, connecting to new geothermal hvac system. Jackson building 5
X00733640-P1
07/29/2024
Permit issued — General Construction
X00752519-I1-GC
07/02/2024
Permit issued — Sidewalk Shed
X00879129-I1-SH
06/28/2024
Permit issued — Construction Fence
X00879872-I1-FN
05/16/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/16/2024
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC03/12/2025
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC07/29/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC07/02/2024
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC06/28/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/15/2024
DOB NOWStructuralSigned-offRAVEN CONSTRUCTION SERVIC05/06/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/25/2024
DOB NOWGeneral ConstructionSigned-offP & K CONTRACTING INC04/15/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/11/2024
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC01/31/2024
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC01/30/2024
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC01/26/2024
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC01/19/2024
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/16/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/16/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/12/2024
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC09/20/2023
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC08/08/2023
DOB NOWGeneral ConstructionSigned-offP & K CONTRACTING INC07/27/2023
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC05/30/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/25/2023
DOB NOWStructuralSigned-offRAVEN CONSTRUCTION SERVIC05/09/2023
DOB NOWGeneral ConstructionSigned-offRAVEN CONSTRUCTION SERVIC03/31/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP02/28/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP02/28/2023
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC02/07/2023
DOB NOWSupported ScaffoldSigned-offJJS BUILDERS01/06/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC12/31/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/30/2022
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC10/12/2022
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC08/05/2022
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC07/18/2022
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP07/06/2022
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC07/16/2021
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC03/24/2021
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC12/23/2020
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC03/03/2020
DOB NOWSidewalk ShedSigned-offP & K CONTRACTING INC01/06/2020
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC01/06/2020
DOB NOWConstruction FenceSigned-offSKYWORX CONTRACTING INC12/18/2019
+ 11 more permits on file
10 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026CompleteARCADIA ELECT'L CO. INC.General Wiring
06/13/2025CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
03/10/2025CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
04/04/2024Permit IssuedAMIN ELECTRICAL CORP—
08/17/2023CompleteLIT MODE ELECL CONTG INC—
01/24/2023Permit IssuedHYLAN DATACOM & ELECL LLC—
07/05/2022CompleteARCADIA ELECT'L CO. INC.—
03/01/2022CompleteEIA ELECTRIC, INC1 meters
05/06/2020Permit IssuedALL-STAR ELEC'L SERVICES—
01/06/2020CompleteAMIN ELECTRICAL CORP—
2 projects · most recent 04/12/2022
Fence
FiledStatusContractorScope
04/12/2022Signed-offRAVEN CONSTRUCTION SERVICFence
01/03/2020Permit IssuedP & K CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
04/17/2025Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
04/17/2025Fire-Resistance Rated ConstructionCHRISTOPHER BEHLEprogress
04/17/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
04/17/2025Energy Code Compliance InspectionsCHRISTOPHER BEHLEprogress
04/17/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
04/17/2025PreliminaryCHRISTOPHER BEHLEprogress
04/17/2025Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
04/17/2025MasonryCHRISTOPHER BEHLEspecial
04/09/2025Energy Code Compliance InspectionsCHRISTOPHER BEHLEprogress
04/09/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
04/09/2025MasonryCHRISTOPHER BEHLEspecial
04/09/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
04/09/2025Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
04/09/2025Fire-Resistance Rated ConstructionCHRISTOPHER BEHLEprogress
04/09/2025PreliminaryCHRISTOPHER BEHLEprogress
04/09/2025Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
09/04/2024Maintenance informationIBRAHIM MOURADenergy_progress
09/04/2024Mechanical SystemsIBRAHIM MOURADspecial
09/04/2024Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/04/2024Heating SystemsIBRAHIM MOURADspecial
09/04/2024FinalIBRAHIM MOURADprogress
09/04/2024HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
09/04/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
09/04/2024HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
05/16/2024Maintenance informationIBRAHIM MOURADenergy_progress
Latest 25 of 56.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch24
08/24/2026X00656586-I1Request digital key ↗
08/24/2026X00733349-I1Request digital key ↗
08/24/2026X00734180-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00289783-I1Request digital key ↗
08/15/2026X00320516-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00281117-I1Request digital key ↗
08/26/2026X00289797-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION12
06/11/2020240167724Open ↗
04/28/2020240167724Open ↗
04/21/2020240167724Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
03/08/2021240242750Open ↗
03/08/2021240242750Open ↗
11/26/2018240167724Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/28/2015220363979Open ↗
▸Seals & Professional Certifications76
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/26/2026X00281117-I1Open ↗
08/26/2026X00289797-I1Open ↗
08/26/2026X00289783-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026X00548540-P2Open ↗
09/01/2026X00548540-P2Open ↗
08/31/2026X00734793-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026X00734180-P1Open ↗
09/01/2026X00548540-P2Open ↗
08/31/2026X00734793-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/08/2020240167724Open ↗
03/12/2020240242750Open ↗
09/08/2015220364585Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/08/2020240167724Open ↗
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/08/2020240167724Open ↗
04/16/2014220363979Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/22/2016240167724Open ↗
08/01/2014240067208Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
04/24/2019240242750Open ↗
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
11/14/2018240242750Open ↗
11/14/2018240242750Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
08/13/2026X00289797-I1Open ↗
08/13/2026X00281117-I1Open ↗
08/13/2026X00289783-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
04/08/2020240167724Open ↗
11/14/2018240242750Open ↗
12/22/2016240167724Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/24/2026X00734180-I1Open ↗
08/24/2026X00752519-I1Open ↗
08/24/2026X00734793-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00733349-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/08/2015220364585Open ↗
09/08/2015220364585Open ↗
05/29/2014220364585Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/21/2026X00733640-I1Open ↗
08/13/2026X00548540-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/08/2015220364585Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/15/2020240167724Open ↗
03/11/2020240242750Open ↗
05/15/2019240242750Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
08/26/2026X00281117-I1Open ↗
08/26/2026X00289783-I1Open ↗
08/24/2026X00734180-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/24/2026X00734180-I1Open ↗
08/13/2026X00892684-I1Open ↗
08/13/2026X00989374-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/14/2018240242750Open ↗
07/20/2015240067208Open ↗
06/26/2014220363979Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/15/2020240167724Open ↗
10/28/2015220363979Open ↗
09/08/2015220364585Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026X00289797-I1Open ↗
08/13/2026X00289783-I1Open ↗
08/13/2026X00320516-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00320516-I1Open ↗
08/13/2026X00289783-I1Open ↗
08/13/2026X00289797-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/15/2019240242750Open ↗
10/01/2018240230852Open ↗
09/08/2015220364585Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION5
04/08/2020240167724Open ↗
05/22/2019240242750Open ↗
05/15/2019240242750Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/14/2018240242750Open ↗
10/01/2018240230852Open ↗
12/22/2016240167724Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
04/28/2020240167724Open ↗
04/21/2020240167724Open ↗
04/08/2020240167724Open ↗
▸BISEFILING COVER SHEET2
05/29/2014220364585Open ↗
04/16/2014220363979Open ↗
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/26/2018240167724Open ↗
10/28/2015220363979Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X00985652-I1Open ↗
08/13/2026X00994230-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X00985652-I1Open ↗
08/13/2026X00994230-I1Open ↗