← Back
Two family converted from one family
306 14 STREET
BROOKLYN · BIN 3023716
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,160 sfGross Floor Area
2Units
Two family converted from one family · 1,600 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 2 filings · 16 docs
Floor 22p · 1 filing · 18 docs
Floor 1
Cellar4p · 2 filings · 16 docs
Basement1p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2020$2.0M—Private party → Private party$924/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDLINE CONSTRUCTION & MAGeneral Contractor407/08/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HARPER ARCHITECTURE, PC6851305/02/2022
D'ANTONIO CONSULTING ENGI931203/01/2022
BARRY STRUCTURAL ENGINEER749103/25/2021
Building Lifecycle
All (58)Filed (6)Permit Issued (5)Signed Off (3)Inspection (5)Objection (20)Special Inspection (19)
06/01/2022
Signed off — Alteration
This application is filed for the structural scope associated with the proposed removal of the existing fireplace at the cellar level and the existing interior bearing wall at the 1st floor level. No change to use, egress, or occupancy
B00481559-I1
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
05/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Christine Harper
05/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christine Harper
05/06/2022
Objection resolved — Addressed
05/03/2022
Objection raised — Scope
05/02/2022
Filed — Alteration
Plumbing work being filed in conjunction with general construction applications to replace and relocate fixtures. No change to use, egress or occupancy
B00481501-P1
04/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christine Harper
04/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Christine Harper
04/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christine Harper
03/11/2022
Signed off — Alteration
Filing mechanical work to Install AC units; no change to use, egress or occupancy.
B00481542-I1
03/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2022
Objection resolved — Addressed
03/04/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2022
Objection resolved — Addressed
03/03/2022
Signed off — Alteration
B00479225-I1
03/03/2022
Objection raised — Scope
03/03/2022
Objection raised — Scope
03/01/2022
Filed — Alteration
Filing mechanical work to Install AC units; no change to use, egress or occupancy.
B00481542-P1
02/28/2022
Special inspection requirement — Ventilation and air distribution system
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Metering
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Heating Systems
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Energy Code Compliance Inspections
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Final
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Duct leakage testing, insulation and design
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
GAETANO D'ANTONIO
02/28/2022
Special inspection requirement — Maintenance information
GAETANO D'ANTONIO
11/23/2021
Permit issued — General Construction
B00479225-I1-GC
08/05/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2021
Permit issued — Plumbing
B00481501-I1-PL
05/07/2021
Permit issued — Structural
B00481559-I1-ST
05/07/2021
Permit issued — Mechanical Systems
B00481542-I1-MS
05/06/2021
Permit issued — General Construction
B00479225-I1-GC
03/30/2021
Objection raised — Other
03/30/2021
Objection resolved — Addressed
03/30/2021
Objection raised — Inspections
03/30/2021
Objection resolved — Addressed
03/30/2021
Objection raised — Mechanical
03/30/2021
Objection resolved — Addressed
03/26/2021
Filed — Alteration
Filing mechanical work to Install AC units; no change to use, egress or occupancy.
B00481542-I1
03/25/2021
Filed — Alteration
This application is filed for the structural scope associated with the proposed removal of the existing fireplace at the cellar level and the existing interior bearing wall at the 1st floor level. No change to use, egress, or occupancy
B00481559-I1
03/16/2021
Objection raised — Inspections
03/16/2021
Objection resolved — Addressed
03/16/2021
Objection raised — Other
03/16/2021
Objection resolved — Addressed
03/16/2021
Objection raised — Fire_Protection
03/16/2021
Objection resolved — Addressed
03/16/2021
Objection raised — Scope
03/16/2021
Objection resolved — Addressed
03/16/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
03/15/2021
Filed — Alteration
Plumbing work being filed in conjunction with general construction applications to replace and relocate fixtures. No change to use, egress or occupancy
B00481501-I1
03/05/2021
Filed — Alteration
B00479225-I1
03/05/2021
Special inspection requirement — Final
MICHAEL BARRY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offREDLINE CONSTRUCTION & MA11/23/2021
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN07/09/2021
DOB NOWStructuralSigned-offREDLINE CONSTRUCTION & MA05/07/2021
DOB NOWMechanical SystemsSigned-offREDLINE CONSTRUCTION & MA05/07/2021
DOB NOWGeneral ConstructionSigned-offREDLINE CONSTRUCTION & MA05/06/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC09/29/2021
1 project · most recent 05/02/2022
Gas Water/Sanitary
FiledStatusContractorScope
05/02/2022Signed-offMPC PLUMBING & HEATING INGas, Water/Sanitary
2 projects · most recent 10/07/2021
General Wiring
FiledStatusContractorScope
10/07/2021CompleteBROOKYLN SOLARWORKS, LLC—
05/22/2021CompleteHIGH BEAM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/09/2022Fire-Resistant Penetrations and JointsChristine Harperspecial
05/09/2022Energy Code Compliance InspectionsChristine Harperprogress
05/09/2022HVAC-R and service water piping design and insulationChristine Harperenergy_progress
04/25/2022Fire-Resistant Penetrations and JointsChristine Harperspecial
04/25/2022Energy Code Compliance InspectionsChristine Harperprogress
04/25/2022HVAC-R and service water piping design and insulationChristine Harperenergy_progress
02/28/2022Ventilation and air distribution systemGAETANO D'ANTONIOenergy_progress
02/28/2022HVAC-R and service water heating equipmentGAETANO D'ANTONIOenergy_progress
02/28/2022MeteringGAETANO D'ANTONIOenergy_progress
02/28/2022Heating SystemsGAETANO D'ANTONIOspecial
02/28/2022Mechanical SystemsGAETANO D'ANTONIOspecial
02/28/2022Energy Code Compliance InspectionsGAETANO D'ANTONIOprogress
02/28/2022FinalGAETANO D'ANTONIOprogress
02/28/2022HVAC-R and service water heating system controlsGAETANO D'ANTONIOenergy_progress
02/28/2022Duct leakage testing, insulation and designGAETANO D'ANTONIOenergy_progress
02/28/2022HVAC-R and service water piping design and insulationGAETANO D'ANTONIOenergy_progress
02/28/2022Maintenance informationGAETANO D'ANTONIOenergy_progress
03/16/2021Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
03/05/2021FinalMICHAEL BARRYprogress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00479225-I1Request digital key ↗
08/15/2026B00481542-I1Request digital key ↗
08/14/2026B00481542-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/24/2021340822818Open ↗
▸BISWORK PERMIT APPLICATION1
09/29/2021340822818Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
08/25/2026B00481542-P1Open ↗
08/25/2026B00481542-P1Open ↗
08/25/2026B00481542-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00479225-I1Open ↗
09/01/2026B00481501-P1Open ↗
09/01/2026B00481501-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026B00481542-P1Open ↗
08/25/2026B00481542-P1Open ↗
08/24/2026B00481559-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/24/2021340822818Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/29/2021340822818Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00479225-I1Open ↗
08/15/2026B00481542-I1Open ↗
08/14/2026B00481542-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/24/2021340822818Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/10/2021340822818Open ↗
09/24/2021340822818Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00481542-I1Open ↗
08/13/2026B00479225-I1Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/13/2021340822818Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/24/2021340822818Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/10/2021340822818Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/10/2021340822818Open ↗
09/24/2021340822818Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/13/2021340822818Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/21/2021340822818Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/10/2021340822818Open ↗
09/24/2021340822818Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/24/2021340822818Open ↗