Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB09/06/2019Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tstThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2026). This one is not shown as answered
DOB12/01/2016Violation issued to elevator-failure to file category 1 2015 inspection/testThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2026). This one is not shown as answered
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB07/23/2019Insp *2018 -ftm-1 stry new bldg@the s.e. Corner lot,constructed w/out prmt&occup as sound stage 29.cmu wall ties do not prevent movement in both directions.steel framed lateral system not stiff.fireproof missng at roof framing.pe immed evalu entire bldg.provide reprs under prmt to achieve code compliance per pe evalu.cmplt reprs&signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/23/2019Insp *2018 -ftm- 6 stry new bldg constructed w/out permit on east side crnr lot.steel fram'g installed w/out permit.all slab cantilever beams missing moment connections.columns not bear@all splices.nuts not fully engaged.pe immed evalu entire bldg.prov reprs undr permit per pe evalu to achieve code compliance.cmplt reprs undr permit&signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/23/2019Insp *2018- ftm-6 stry new bldg constructed w/out prmt on e.s. Corner lot btwn bldg "sound stage 28" & 29".large opengs in pipe in deck not framed.cmu wall ties do not prevent movt in both directions.no connect laterl systm.pe immed evalu entre bldg.provide reprs under prmt per pe evalu to achieve code compliance.complt reprs and signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/13/2019Insp *2018 -ftm-comcrcl bldg@nw corner lot adding 4FLS w/out prmt.cmu instl @ vert additon not code compl.cmu wall ties no movement in both directions.strctl steel w/out prmt not code compl.beams improp connect to concr struct.nyspe immd evalu entre bldg.prov reprs code compliance under permit per evalu.complt reprs under permit signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/13/2019Insp *2018 -ftm-new bldg at n.e.corner of lot constructd w/out permit and occup as"sound stage 26".cmu wall ties do not prevent movementt in both directions.steel frame laterl systm not stiff.large cracks in cmu @n.w. Crnr.nyspe immd eval entre bldg.prov reprs achieve code complian under permit per eval.complt reprs under permit signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/13/2019Insp *2018 -ftm-new bldg @ n.e. Crnr of lot constructed w/out prmt and occupied as "sound stage 27".cmu wall ties do not prevent movement in both directions.steel frame laterl systm not stiff.fireproof miss'g at steel roof framing.nyspe immd eval entire bldg.prov reprs achieve code complince undr prmt per eval.compl reprs undr prmt&signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB07/13/2019Insp *2018 -ftm-new bldg on e.s. Of corner lot,part constructed w/out permit to be "sound stage 28".wall ties do not prevent movement of cmu in both dirctions.portns of frnt&rear cmu walls dmg by part roof framg collap.pe immed eval entre bldg.prov reprs undr permit to achieve code compliance&repr dmg.cmplete reprs undr permit and signoff by 12/21/20Issued 2019; DOB's record still lists it as active
DOB01/25/2019Construction: other (DOB violation)Issued 2019; DOB's record still lists it as active
DOB06/19/2018Construction: other (DOB violation)Issued 2018; DOB's record still lists it as active