← Back
BuildNYC
Elevator apt, fireproof without stores
Nostrand (NYCHA)
3062 AVENUE V · BIN 3320777
💬 Discuss this project
1949Year Built
6Stories
D3Building Class
R5Zoning
521,976 sfGross Floor Area
572Units
LL97 Covered1 Active Violation ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 592,000 sf lot · 0.88 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoofing Replacement and Rooftop Structure Renovation25p · 1 filing · 10 docs
BulkheadRoofing Replacement and Rooftop Structure Renovation2p · 2 filings · 14 docs
Site & exteriorNOSTRAND HOUSES BL #5 DEBRIS CHUTE13p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2407/08/2026
NY City Housing203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joel Phagoo P.E109/30/2022
AK Consulting Services109/20/2022
Bitopi Consultants209/18/2022
Superstructures Engineering + Architects104/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Superstructures Engineering + Architects103/21/2026
AK Consulting Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N Construction GroupScaffold807/08/2026
J & N Construction GroupGeneral Contractor407/08/2026
Infinity Electrical Contractors IElectrical203/21/2026
LCJ Electrical ContractorsElectrical103/22/2026
Dynamic Electric SystemElectrical103/21/2026
Segreti JosephElectrical103/21/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
Maximum Electrical ContractingElectrical103/21/2026
Millar Elevator IndustriesElectrical103/21/2026
Prospect Electric ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joel Phagoo, PE2416109/30/2022
Bitopi Consultants7036109/18/2022
Tectonic Engineering Cons106104/12/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 6, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 6 filing on record yet
11/04/2026
Elevator Category 1 inspection report filed
11/10/2025
VC12: failed to provide required water-based fire protection system.
FDNY_NOV violation · closed
10/25/2025
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
10/07/2025
Elevator Category 5 inspection report filed
38 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group10/24/2023
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group10/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offJ & N Construction Group10/01/2022
DOB NOWConstruction FenceSigned-offJ & N Construction Group09/21/2022
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group09/19/2022
DOB NOWSidewalk ShedSigned-offJ & N Construction Group09/19/2022
BISPLISSUEDDynamic Contracting03/11/2011
BISOTISSUEDDynamic Energy Group10/30/2009
BISOTISSUED4A General Contracting06/08/2001
BISPLISSUEDDNA Plumbing Contractors03/26/2001
BISOTISSUEDCrane Mechnical01/06/2001
BISPLISSUEDDNA Plumbing Contractors09/28/2000
BISOTISSUEDCrane Mechnical09/26/2000
BISOTISSUEDLithos Construction03/10/2000
BISPLISSUEDDNA Plumbing Contractors06/25/1999
BISOTISSUEDCrane Mechanical06/23/1999
6 projects · most recent 08/01/2025
General Wiring
FiledStatusContractorScope
08/01/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
08/01/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
04/17/2024CompleteAujla Electric—
04/17/2024CompleteAujla Electric—
09/19/2022CompleteLCJ Electrical Contractors—
09/19/2022CompleteLCJ Electrical Contractors—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/30/2022Post-installed AnchorsJOEL PHAGOOspecial
09/18/2022Post-installed AnchorsKAMRUL AHSANspecial
03/31/2021MasonryGEORGE GHEBRYALspecial
03/31/2021Post-installed AnchorsGEORGE GHEBRYALspecial
03/31/2021FinalPaul Millmanprogress
03/31/2021Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
48 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account