← Back
Zoned residential, not Manhattan
3080 DECATUR AVENUE
BRONX · BIN 2017885
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6BZoning
0 sfGross Floor Area
0Units
Rent Stabilized25 Open Violations ▸
Zoned residential, not Manhattan · 3,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21p · 1 filing · 2 docs
Floor 1
Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD907/08/2026
NEW AMERICAN CONSTRUCTION INC807/08/2026
HOUSING PRESERVATION DEVELOPME403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES603/21/2026
GRAND EXPEDITERS NYC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAKHI GENERAL CONTRACTORGeneral Contractor507/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACTIVE DESIGN GROUP ENGIN6666109/15/2021
Building Lifecycle
All (71)Filed (7)Permit Issued (6)Signed Off (6)Violation (52)
04/29/2026
Violation issued (ECB, open)
Construction
08/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049457-I1
08/30/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTY DURING BLDG DEMOLITION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049645-I1
08/30/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER HPD EMERGENCY DECLARATION. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049427-I1
03/22/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00360724-I1
02/13/2023
Signed off — Alteration
X00753471-I1
01/06/2023
Permit issued — Sidewalk Shed
X08049427-I1-SH
01/06/2023
Permit issued — Supported Scaffold
X08049457-I1-SF
12/29/2022
Permit issued — Protection and Mechanical Methods
X08049645-I1-PMM
12/15/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049457-I1
12/15/2022
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTY DURING BLDG DEMOLITION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049645-I1
12/15/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER HPD EMERGENCY DECLARATION. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08049427-I1
11/19/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00360725-I1
09/07/2022
Permit issued — Construction Fence
X00753471-I1-FN
09/06/2022
Filed — Alteration
X00753471-I1
05/26/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2022
Violation issued (ECB, open)
Construction
01/05/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/16/2021
Violation issued (ECB, open)
Construction
11/17/2021
Violation issued (ECB, closed)
Construction
11/10/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (ECB, open)
Construction
10/04/2021
Violation issued (ECB, open)
Construction
10/01/2021
Violation issued (ECB, open)
Construction
09/15/2021
Filed — Alteration
APPLICATION FILING FOR THE INSTALLATION OF SHORING WITH TOP AND BOTTOM PLATES AND INSTALL X BRACING FROM THE CELLAR TO THE 3RD FLOOR AND COMPLY WITH EMERGENCY WORK ORDER AS PER ENGINEER'S PLANS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUPANCY.
X00593407-I1
08/25/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/09/2021
Violation issued (ECB, open)
Construction
07/21/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2021
Violation issued (ECB, open)
Construction
05/26/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2021
Violation issued (ECB, open)
Construction
03/31/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/04/2021
Violation issued (ECB, open)
Construction
01/07/2021
Violation issued (ECB, open)
Construction
10/05/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/08/2020
Permit issued — Supported Scaffold
X00360725-I1-SF
06/25/2020
Permit issued — Sidewalk Shed
X00360724-I1-SH
06/23/2020
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00360725-I1
06/22/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00360724-I1
02/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/29/2020
Violation issued (ECB, open)
Construction
12/24/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2019
Violation issued (ECB, open)
Construction
12/04/2018
Violation issued (ECB, closed)
Construction
10/11/2018
Violation issued (ECB, closed)
Construction
08/08/2018
Violation issued (ECB, closed)
Construction
06/28/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (ECB, closed)
Construction
05/19/2018
Violation issued (ECB, closed)
Construction
04/18/2018
Violation issued (ECB, closed)
Construction
04/18/2018
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (ECB, closed)
Construction
02/16/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR01/06/2023
DOB NOWSupported ScaffoldSigned-offLAKHI GENERAL CONTRACTOR01/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offLAKHI GENERAL CONTRACTOR12/29/2022
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC09/07/2022
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION07/08/2020
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION06/25/2020
BIS—ISSUEDGRANITE ENVIRONMENT, LLC12/09/2022
BIS—ISSUEDGRANITE ENVIRONMENT, LLC11/17/2022
BISOTISSUEDGRANITE ENVIRONMENT, LLC11/07/2022
4 projects · most recent 12/03/2025
FiledStatusContractorScope
12/03/2025CompleteGREEN POWER ELECTRIC CORP—
12/08/2022Permit IssuedK.N.C ELECTRIC INC—
09/27/2022Permit IssuedGREEN POWER ELECTRIC CORP—
06/25/2020CompleteRICHARD NEU—
1 project · most recent 09/15/2021
FiledStatusContractorScope
09/15/2021——1 scope_items
Nothing on file for this building.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/25/2026X00593407-I1Request digital key ↗
08/24/2026X00753471-I1Request digital key ↗
08/23/2026X08049427-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00360724-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00360725-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION6
09/19/2022240336463Open ↗
07/18/2022220735373Open ↗
07/07/2021220717543Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
12/12/2022220735373Open ↗
11/22/2022220735373Open ↗
11/07/2022240336463Open ↗
Showing 3 of 5 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
09/21/2022240336463Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00593407-I1Open ↗
08/24/2026X00753471-I1Open ↗
08/23/2026X08049427-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/19/2022240336463Open ↗
01/06/2020220723297Open ↗
10/17/2019220717543Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/10/2020220723297Open ↗
10/17/2019220717543Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/06/2020220723297Open ↗
10/17/2019220717543Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/19/2022240336463Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2022240336463Open ↗
▸Trade Schedules & Equipment1
▸BISELECTRIC CUT-OFF1
11/22/2022220735373Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
01/10/2020220723297Open ↗
10/17/2019220717543Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026X00360725-I1Open ↗
08/13/2026X00360724-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/22/2022220735373Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/22/2022220735373Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/10/2020220723297Open ↗
10/17/2019220717543Open ↗
▸BISRODENT CONTROL2
12/12/2022220735373Open ↗
11/22/2022220735373Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/22/2022220735373Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/10/2020220723297Open ↗
10/17/2019220717543Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/14/2023240336463Open ↗
09/21/2022240336463Open ↗
09/19/2022240336463Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/12/2022220735373Open ↗
12/12/2022220735373Open ↗
12/12/2022220735373Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/15/2023240336463Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/22/2022220735373Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
02/14/2023240336463Open ↗
09/19/2022240336463Open ↗
01/06/2020220723297Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/22/2022220735373Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET3
07/18/2022220735373Open ↗
01/06/2020220723297Open ↗
10/17/2019220717543Open ↗
▸BISBOROUGH INTAKE FORM3
12/12/2022220735373Open ↗
11/22/2022220735373Open ↗
07/18/2022220735373Open ↗
▸BISADDITIONAL INFORMATION2
12/12/2022220735373Open ↗
12/12/2022220735373Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2022240336463Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/22/2022220735373Open ↗
11/22/2022220735373Open ↗