← Back
BuildNYC
Military and naval installation
Our Lady Star of the Sea
309 CLAYTON ROAD · Name © OpenStreetMap contributors · BIN 1086347
💬 Discuss this project
1900Year Built
3.5Stories
Y4Building Class
R3-2Zoning
2,542,066 sfGross Floor Area
1Units
LL97 Covered17 Active Violations 2 unresolved · 15 paperwork only ▸
Military and naval installation · Owner of record: Governors Island · 7,600,835 sf lot · 0.33 FAR built · Flood zone VE
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGovernors IslandUnder Construction14p · 1 filing · 18 docs
Floor 1Governors IslandUnder Construction36p · 6 filings · 18 docs
MezzanineGovernors IslandUnder Construction17p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Trust for Governors Island1210/17/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Smith-MILLER+HAWKINSON Architects510/16/2026
B2B Associates107/23/2026
Silman111/20/2025
ADS Engineers211/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
King Rose of NYGeneral Contractor110/17/2026
Lockwood Cabinetspecialty_contractor108/11/2026
Access PlumbingPlumbing108/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
B2 Engineering5433107/23/2026
Amaracon Testing & Inspec5842411/20/2025
Building Lifecycle
All (51)Filed (9)Permit Issued (3)Signed Off (1)Inspection (2)Objection (34)Special Inspection (2)
10/16/2026
Filed — No Work
M01415587-I1
10/16/2026
Permit issued — General Construction
M01271617-I1-GC
09/11/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE INSTALLATION OF (1) NEW 20 TON OUTDOOR CONDENSING UNIT, REPLACEMENT OF (3) AIR HANDLING UNITS IN KIND WITH ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01429272-I1
08/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/10/2026
Permit issued — Plumbing
M01271617-S2-PL
08/10/2026
Permit issued — Mechanical Systems
M01429272-I1-MS
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Scope
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Scope
07/24/2026
Objection raised — Other
07/23/2026
Filed — Alteration
SCOPE OF WORK INCLUDES THE INSTALLATION OF (1) NEW 20 TON OUTDOOR CONDENSING UNIT, REPLACEMENT OF (3) AIR HANDLING UNITS IN KIND WITH ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01429272-I1
06/30/2026
Objection resolved — Resolved
06/12/2026
Objection raised — Scope
06/11/2026
Special inspection requirement — Public Assembly Emergency Lighting
CONNIE PISANI
05/19/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/11/2026
Objection resolved — Resolved
03/11/2026
Objection resolved — Open
03/05/2026
Objection resolved — Addressed
12/31/2025
Objection raised — Scope
12/31/2025
Objection raised — Scope
12/31/2025
Objection raised — Scope
12/31/2025
Objection raised — Admin
12/31/2025
Objection raised — Scope
12/31/2025
Objection raised — Structural
12/31/2025
Objection raised — Admin
12/31/2025
Objection raised — Fire_Protection
12/31/2025
Objection raised — Zoning
12/31/2025
Objection raised — Zoning
12/31/2025
Objection raised — Structural
12/19/2025
Objection raised — Scope
12/19/2025
Objection raised — Admin
11/20/2025
Filed — Alteration CO
Installation of sprinkler system for community facility. HUB consultation 4/27/26.
M01271617-S1
11/13/2025
Filed — Alteration CO
Installation of sprinkler system for community facility. HUB consultation 4/27/26.
M01271617-S2
11/13/2025
Filed — Alteration CO
Installation of sprinkler system for community facility. HUB consultation 4/27/26.
M01271617-S3
10/24/2025
Objection raised — Scope
10/20/2025
Special inspection requirement — Sprinkler Systems
09/23/2025
Filed — Alteration CO
Installation of sprinkler system for community facility. HUB consultation 4/27/26.
M01271617-I1
07/09/2025
Filed — No Work
M01251775-I1
04/10/2025
Filed — No Work
M01204190-I1
09/10/2024
Filed — No Work
M01106669-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKing Rose of NY10/16/2026
DOB NOWPlumbingPermit IssuedAccess Plumbing08/10/2026
DOB NOWMechanical SystemsSigned-offLockwood Cabinet08/10/2026
1 project · most recent 07/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Signed-offLockwood CabinetHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MAKE: MITSUBISHI/TRANE MODEL#: TUHYE2403BN41AN 240,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/20/2025
Sprinkler System
FiledStatusContractorScope
11/20/2025——Sprinkler System
1 project · most recent 11/20/2025
Water/Sanitary
FiledStatusContractorScope
11/20/2025Permit IssuedAccess PlumbingWater/Sanitary
1 project · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedRamdeen's Electric ContractingGeneral Wiring
1 project · most recent 11/20/2025
Steel Concrete Wood
FiledStatusContractorScope
11/20/2025Permit IssuedKing Rose of NYSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/11/2026Public Assembly Emergency LightingCONNIE PISANIprogress
10/20/2025Sprinkler Systems—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Governors IslandEducationFloor 1, Mezzanine, Roof
Project M01271617 Alteration CO · Plan Examiner Review · 09/23/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/21/2026M01271617-S2Request digital key ↗
08/21/2026M01271617-S1Request digital key ↗
08/21/2026M01271617-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/26/2026M01106669-I1Request digital key ↗
08/24/2026M01204190-I1Request digital key ↗
08/22/2026M01251775-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
10/17/2026M01415587-I1Request digital key ↗
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/21/2026M01271617-S3Open ↗
08/21/2026M01271617-S2Open ↗
08/13/2026M01271617-S1Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01271617-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/17/2026M01415587-I1Open ↗
08/24/2026M01204190-I1Open ↗
08/22/2026M01251775-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
10/20/2026M01415587-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01271617-I1Open ↗
08/13/2026M01271617-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026M01271617-S2Open ↗
08/21/2026M01271617-S1Open ↗
08/21/2026M01271617-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
10/17/2026M01415587-I1Open ↗
08/24/2026M01204190-I1Open ↗
08/22/2026M01251775-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents6
▸DOB NOWAlternate Plan 21
10/17/2026M01415587-I1Open ↗
▸DOB NOWAlternate Plan 31
10/17/2026M01415587-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01271617-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01271617-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026M01271617-I1Open ↗
▸DOB NOWAlternate Plan 11
10/17/2026M01415587-I1Open ↗