← Back
Five to six families
309 MENAHAN STREET
BROOKLYN · Bushwick (West) · BIN 3075773
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,125 sfGross Floor Area
6Units
Rent Stabilized10 Open Violations 6 unresolved · 4 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 309 MENAHAN BH LLC · 2,550 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 321p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 119p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SKY GROUP1303/22/2026
309 MENAHAN BH LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2022$450K—309 MENAHAN FEE OWNER LLC → 309 MENAHAN BH LLC$109/sf building
08/31/2021$1.1M—Private party → 309 MENAHAN FEE OWNER LLC$255/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LONGTIN SOLUTIONS LLC707/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUESKY DEVELOPMENTGeneral Contractor903/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
NY PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LONGTIN SOLUTIONS LLC8320707/11/2023
ANDREW GOODRICH, P.E., PL965103/14/2023
Building Lifecycle
All (99)Filed (7)Permit Issued (5)Signed Off (1)Violation (60)Inspection (4)Objection (4)Special Inspection (18)
03/29/2024
Violation issued (HPD, closed)
B
10/30/2023
Violation issued (HPD, closed)
B
10/30/2023
Violation issued (HPD, open)
B
10/30/2023
Violation issued (HPD, open)
B
08/14/2023
Violation issued (HPD, open)
C
08/14/2023
Violation issued (HPD, open)
C
08/09/2023
Signed off — Alteration
REPAIR DAMAGED CEILING JOISTS IN BATHROOM AREA OF APT #1L TO RESOLVE VIOLATION #35579032H,#39059234M AND #39059233K. PROPOSED INTERIOR RENOVATION IN APT #1L AND 3L. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00783316-I1
08/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/27/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/11/2023
Filed — Alteration
REPAIR DAMAGED CEILING JOISTS IN BATHROOM AREA OF APT #1L TO RESOLVE VIOLATION #35579032H,#39059234M AND #39059233K. PROPOSED INTERIOR RENOVATION IN APT #1L AND 3L. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00783316-P1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
TIM TSAI
03/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
03/24/2023
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
03/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
03/17/2023
Filed — Alteration
replace all plumbing risers throughout building with new as per HPD order, TO RESOLVEVIOLATION #35579032H, #39059234M AND #39059233K. PROPOSED INTERIORRENOVATIONON ON ALL FLOORS. PLUMBING WORK AS PER PLAN. NO CHANGE INEGRESS, USE OR OCCUPANCY.
B00783390-P3
03/14/2023
Filed — Alteration
replace all plumbing risers throughout building with new as per HPD order, TO RESOLVEVIOLATION #35579032H, #39059234M AND #39059233K. PROPOSED INTERIORRENOVATIONON ON ALL FLOORS. PLUMBING WORK AS PER PLAN. NO CHANGE INEGRESS, USE OR OCCUPANCY.
B00783390-S1
03/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
03/13/2023
Special inspection requirement — Maintenance information
TIM TSAI
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
03/13/2023
Special inspection requirement — Heating Systems
TIM TSAI
03/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
ANDREW GOODRICH
03/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
TIM TSAI
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
03/13/2023
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
03/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
03/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
TIM TSAI
02/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2023
Permit issued — Plumbing
B00783390-I1-PL
01/04/2023
Permit issued — General Construction
B00783316-I1-GC-CX
11/28/2022
Objection raised — Scope
11/28/2022
Objection resolved — Addressed
11/22/2022
Filed — Alteration
replace all plumbing risers throughout building with new as per HPD order, TO RESOLVEVIOLATION #35579032H, #39059234M AND #39059233K. PROPOSED INTERIORRENOVATIONON ON ALL FLOORS. PLUMBING WORK AS PER PLAN. NO CHANGE INEGRESS, USE OR OCCUPANCY.
B00783390-P2
11/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
11/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
TIM TSAI
11/22/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
11/15/2022
Filed — Alteration
replace all plumbing risers throughout building with new as per HPD order, TO RESOLVEVIOLATION #35579032H, #39059234M AND #39059233K. PROPOSED INTERIORRENOVATIONON ON ALL FLOORS. PLUMBING WORK AS PER PLAN. NO CHANGE INEGRESS, USE OR OCCUPANCY.
B00783390-P1
10/17/2022
Permit issued — Mechanical Systems
B00783316-I1-GC-CX
10/12/2022
Permit issued — Plumbing
B00783390-I1-PL
09/22/2022
Permit issued — Mechanical Systems
B00783316-I1-GC-CX
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, closed)
C
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNY PLUMBING & HEATING COR01/04/2023
DOB NOWGeneral ConstructionSigned-offBLUESKY DEVELOPMENT01/04/2023
DOB NOWMechanical SystemsSigned-offBLUESKY DEVELOPMENT10/17/2022
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC10/12/2022
DOB NOWMechanical SystemsSigned-offBLUESKY DEVELOPMENT09/22/2022
1 project · most recent 03/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
03/17/2023Permit IssuedNY PLUMBING & HEATING CORGas, Water/Sanitary
2 projects · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023Complete5 J'S ELECTL CONTS CORPGeneral Wiring
11/03/2022Complete5 J'S ELECTL CONTS CORP7 meters, 7 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/23/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/24/2023HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
03/24/2023HVAC-R and service water heating system controlsTIM TSAIenergy_progress
03/24/2023Energy Code Compliance InspectionsTIM TSAIprogress
03/24/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
03/13/2023HVAC-R and service water heating system controlsTIM TSAIenergy_progress
03/13/2023Maintenance informationTIM TSAIenergy_progress
03/13/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
03/13/2023Heating SystemsTIM TSAIspecial
03/13/2023Tenant Protection Plan ComplianceANDREW GOODRICHspecial
03/13/2023HVAC-R and service water heating equipmentTIM TSAIenergy_progress
03/13/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
03/13/2023Energy Code Compliance InspectionsTIM TSAIprogress
03/13/2023HVAC-R and service water heating system controlsTIM TSAIenergy_progress
03/13/2023HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
11/22/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
11/22/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
11/22/2022Energy Code Compliance InspectionsTIM TSAIprogress
11/22/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00783316-P1Request digital key ↗
08/28/2026B00783316-I1Request digital key ↗
08/27/2026B00783390-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00783316-P1Open ↗
08/28/2026B00783316-I1Open ↗
08/27/2026B00783390-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/22/2026B00783390-P2Open ↗
09/22/2026B00783390-P2Open ↗
09/01/2026B00783390-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/22/2026B00783390-P2Open ↗
09/01/2026B00783390-S1Open ↗
09/01/2026B00783390-S1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00783390-P3Open ↗
08/27/2026B00783390-S1Open ↗
08/27/2026B00783390-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026B00783316-I1Open ↗
08/15/2026B00783390-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00783316-I1Open ↗