Public elementary, junior or senior high
P.S. 194 Raoul Wallenberg
3095 AVENUE V · BIN 3201629
💬 Discuss this project
1928Year Built
3Stories
W1Building Class
R5Zoning
87,000 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 175,754 sf lot · 0.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction21p · 1 filing · 20 docs
Floor 3Under Construction37p · 2 filings · 20 docs
Floor 2Under Construction46p · 3 filings · 20 docs
Floor 1Under Construction35p · 2 filings · 20 docs
Sub-BasementUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY7809/13/2026
AMERESCO404/09/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION P.S.194503/22/2026
D.O.E. P.S.194 0703/22/2026
DEPARTMENT OF EDUCATION403/22/2026
DOE PS 194 040803/22/2026
DOE PS 1941103/22/2026
SKY HEIGHTS CONSTRUCTION103/22/2026
DOE 0 040203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STEPHEN B JACOBS GROUP1603/21/2026
AK CONSULTING SERVICES2803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY HEIGHTS CONSTRUCTIONGeneral Contractor2807/08/2026
NAGAN CONSTRUCTION INCGeneral Contractor1807/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor507/30/2026
EON MECHANICAL INCGeneral Contractor404/09/2026
VITAL PLUMBING, INCFire Protection307/08/2026
M&T PLBG AND HTG CO., INCPlumbing306/28/2026
SKYWORX CONTRACTING INCGeneral Contractor204/09/2026
WILLIAM LAROSAElectrical103/21/2026
BANU CONSTRUCTION CORPElectrical103/21/2026
SKOS CONTRACTING LLCGeneral Contractor109/12/2026
SUNRISE ELECTRICAL SRVGeneral Contractor104/09/2026
ABC CONSTRUCTION CONT INCGeneral Contractor107/08/2026
BRIAN CHEBUSKEElectrical103/21/2026
BZ ELECTRIC, INCElectrical103/22/2026
EDUARDO ALIAGAElectrical103/21/2026
IAN BRUMGNACHElectrical103/21/2026
SPYRIDON ILIADISElectrical103/21/2026
THREETECH ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171706/02/2026
HOMERUN SOLAR8772104/30/2025
FUTURE TECH CONSULTANTS O589309/11/2023
Building Lifecycle
All (214)Filed (30)Permit Issued (42)Signed Off (5)Violation (60)Inspection (4)Objection (43)Special Inspection (30)
09/10/2026
Permit issued — General Construction
B01281245-I1-GC
08/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2026
Permit issued — Supported Scaffold
B00980574-I1-SF
07/29/2026
Permit issued — Sidewalk Shed
B00980533-I1-SH
06/24/2026
Permit issued — Plumbing
B00699197-S3-PL
06/17/2026
Objection resolved — Open
06/04/2026
Objection raised — Other
06/02/2026
Filed — Alteration
New 3 story elevator and stair addition , new ADA ramp, 1st floor elevator vestibule, relocation of stair egress, wheelchair lift access for auditorium and gym, new areas of rescue assistance and ADA renovations for bathrooms and classrooms.
B00699197-P5
06/01/2026
Objection raised — Other
05/28/2026
Filed — Alteration
New 3 story elevator and stair addition , new ADA ramp, 1st floor elevator vestibule, relocation of stair egress, wheelchair lift access for auditorium and gym, new areas of rescue assistance and ADA renovations for bathrooms and classrooms.
B00699197-P4
05/27/2026
Special inspection requirement — Fenestration areas
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Air barrier - visual inspection
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Protection of exposed foundation insulation
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Sprayed fire-resistant materials
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Lowest Floor Elevation
MIKHAIL ZEYGMAN
05/22/2026
Permit issued — Construction Fence
B01384539-I1-FN
04/23/2026
Objection raised — Other
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2026
Filed — Alteration
FN/PS194K FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# 126670 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01384539-I1
04/10/2026
Violation issued (ECB, open)
Construction
04/10/2026
Violation issued (ECB, open)
Construction
04/10/2026
Violation issued (ECB, open)
Construction
04/08/2026
Permit issued — Construction Fence
B00980513-I1-FN
04/06/2026
Permit issued — General Construction
B00699197-I1-GC
04/02/2026
Permit issued — Sidewalk Shed
B00980533-I1-SH
04/02/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
03/30/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 194K AT 3117 AVENUE W, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00980574-P1
03/05/2026
Permit issued — Sprinklers
B00699197-S4-EW-SP
01/09/2026
Permit issued — Sprinklers
B00699197-S4-EW-SP
12/24/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUING ALLRELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01209443-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION FOR PS 194K AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01004645-I1
11/25/2025
Permit issued — Mechanical Systems
B00699197-S2-MS
11/05/2025
Permit issued — General Construction
B00699197-S1-GC-CX
11/05/2025
Permit issued — General Construction
B00699197-I1-GC
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
09/22/2025
Objection raised — Other
09/22/2025
Objection raised — Other
09/22/2025
Objection raised — Other
09/15/2025
Permit issued — Sidewalk Shed
B00980533-I1-SH
09/11/2025
Filed — Alteration
Replace existing sink in the Library.
B01281245-S1
09/08/2025
Filed — Alteration
Replace existing sink in the Library.
B01281245-S2
09/05/2025
Filed — Alteration
Replace existing sink in the Library.
B01281245-I1
09/04/2025
Special inspection requirement — Final
Hakeem Alshawabkeh
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
Latest 60 of 214 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSKOS CONTRACTING LLC09/10/2026
DOB NOWSupported ScaffoldPermit IssuedAKM CONSTRUCTION NY CORP07/29/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP07/29/2026
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC06/24/2026
DOB NOWConstruction FencePermit IssuedABC CONSTRUCTION CONT INC05/22/2026
DOB NOWConstruction FencePermit IssuedNAGAN CONSTRUCTION INC04/08/2026
DOB NOWGeneral ConstructionPermit IssuedNAGAN CONSTRUCTION INC04/06/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY04/02/2026
DOB NOWSprinklersPermit IssuedVITAL PLUMBING, INC03/05/2026
DOB NOWSprinklersPermit IssuedVITAL PLUMBING, INC01/09/2026
DOB NOWMechanical SystemsPermit IssuedEON MECHANICAL INC11/25/2025
DOB NOWGeneral ConstructionPermit IssuedNAGAN CONSTRUCTION INC11/05/2025
DOB NOWGeneral ConstructionPermit IssuedNAGAN CONSTRUCTION INC11/05/2025
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY09/15/2025
DOB NOWSupported ScaffoldPermit IssuedAKM CONSTRUCTION NY07/23/2025
DOB NOWSprinklersPermit IssuedVITAL PLUMBING, INC07/10/2025
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC06/23/2025
DOB NOWSolarSigned-offSUNRISE ELECTRICAL SRV04/30/2025
DOB NOWSupport of ExcavationSigned-offNAGAN CONSTRUCTION INC04/29/2025
DOB NOWConstruction FencePermit IssuedNAGAN CONSTRUCTION INC04/14/2025
DOB NOWMechanical SystemsPermit IssuedEON MECHANICAL INC11/14/2024
DOB NOWGeneral ConstructionPermit IssuedNAGAN CONSTRUCTION INC10/29/2024
DOB NOWFoundationPermit IssuedNAGAN CONSTRUCTION INC10/29/2024
DOB NOWStructuralPermit IssuedNAGAN CONSTRUCTION INC07/16/2024
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC06/25/2024
DOB NOWGeneral ConstructionPermit IssuedNAGAN CONSTRUCTION INC06/07/2024
DOB NOWSupport of ExcavationSigned-offNAGAN CONSTRUCTION INC05/28/2024
DOB NOWSupported ScaffoldPermit IssuedSKYWORX CONTRACTING INC05/13/2024
DOB NOWSidewalk ShedPermit IssuedSKYWORX CONTRACTING INC05/13/2024
DOB NOWConstruction FencePermit IssuedNAGAN CONSTRUCTION INC05/10/2024
DOB NOWSupported ScaffoldSigned-offSKY HEIGHTS CONSTRUCTION07/06/2023
DOB NOWConstruction FenceSigned-offSKY HEIGHTS CONSTRUCTION07/06/2023
DOB NOWSidewalk ShedSigned-offSKY HEIGHTS CONSTRUCTION07/06/2023
DOB NOWSidewalk ShedSigned-offSKY HEIGHTS CONSTRUCTION04/18/2023
DOB NOWConstruction FenceSigned-offSKY HEIGHTS CONSTRUCTION04/18/2023
DOB NOWSupported ScaffoldSigned-offSKY HEIGHTS CONSTRUCTION04/18/2023
DOB NOWSidewalk ShedSigned-offSKY HEIGHTS CONSTRUCTION10/19/2022
DOB NOWConstruction FenceSigned-offSKY HEIGHTS CONSTRUCTION08/24/2022
DOB NOWSupported ScaffoldSigned-offSKY HEIGHTS CONSTRUCTION08/24/2022
DOB NOWSupported ScaffoldSigned-offSKY HEIGHTS CONSTRUCTION11/17/2021
+ 52 more permits on file
1 job · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026Permit IssuedVITAL PLUMBING, INC—
2 jobs · most recent 06/02/2026
Water/Sanitary Storm
FiledStatusContractorScope
06/02/2026Permit IssuedM&T PLBG AND HTG CO., INCStorm, Water/Sanitary
09/11/2025——Water/Sanitary
16 jobs · most recent 12/18/2025
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedEASTERN ELEC'L CONST INC—
10/16/2025Permit IssuedNYCOM ELECTRICAL CORP—
04/04/2025CompleteSUNRISE ELEC'L SERVICES—
01/10/2025Permit IssuedHEXAGON CONST & ELECL GRP—
11/11/2024Permit IssuedTHREETECH ELECTRIC, INCLighting
07/08/2024Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
05/10/2024Permit IssuedLIT MODE ELECL CONTG INC—
01/09/2023CompleteCHARAN ELEC'L ENTERP'S IN—
12/15/2022CompleteTRIBECA ELECTRICAL CORP—
10/26/2022CompleteCHARAN ELEC'L ENTERP'S IN—
11/24/2021CompleteTRIBECA ELECTRICAL CORP—
10/29/2021CompleteSTANCO SYSTEM ELEC'L CONT—
01/12/2021CompleteGEMINI ELECTRIC CO., INC.—
02/19/2020CompleteBZ ELECTRIC, INCHVAC Wiring
12/27/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
1 job · most recent 06/02/2026
Steel Concrete
FiledStatusContractorScope
06/02/2026Permit IssuedM&T PLBG AND HTG CO., INCSteel, Concrete
4 jobs · most recent 04/16/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/16/2026Permit IssuedABC CONSTRUCTION CONT INCFence
03/30/2026Permit IssuedAKM CONSTRUCTION NY CORPScaffold
03/10/2025Permit IssuedNAGAN CONSTRUCTION INCFence
12/28/2023Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
05/27/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
05/27/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
05/27/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MIKHAIL ZEYGMANspecial
05/27/2026MasonryMIKHAIL ZEYGMANspecial
05/27/2026Sprayed fire-resistant materialsMIKHAIL ZEYGMANspecial
05/27/2026Interior lighting powerMIKHAIL ZEYGMANenergy_progress
05/27/2026Lighting controlsMIKHAIL ZEYGMANenergy_progress
05/27/2026Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
05/27/2026Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
05/27/2026Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
05/27/2026Fenestration areasMIKHAIL ZEYGMANenergy_progress
05/27/2026Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
05/27/2026Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
05/27/2026Protection of exposed foundation insulationMIKHAIL ZEYGMANenergy_progress
05/27/2026Lowest Floor ElevationMIKHAIL ZEYGMANprogress
05/27/2026Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
04/02/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
09/23/2025Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
09/04/2025Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
09/04/2025Mechanical SystemsHakeem Alshawabkehspecial
09/04/2025FinalHakeem Alshawabkehprogress
09/04/2025FinalHakeem Alshawabkehprogress
07/31/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
07/31/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
07/29/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
Latest 25 of 86.
▾Documents — 311 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/01/2026B00590533-P2Request digital key ↗
09/01/2026B00590530-P1Request digital key ↗
09/01/2026B00590530-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
06/05/2015302564142Open ↗
09/21/2011320080309Open ↗
10/09/2009320080309Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
10/17/2011320080309Open ↗
11/20/2009320080309Open ↗
10/09/2009320080309Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram6
08/26/2026B00699197-I1Open ↗
08/26/2026B00699197-S1Open ↗
08/14/2026B00699197-P5Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications118
▸DOB NOWProgress Inspector Seal & Signature46
09/02/2026B01281245-S1Open ↗
09/01/2026B01209443-I1Open ↗
09/01/2026B01209443-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/02/2026B01281245-S1Open ↗
09/01/2026B01209443-I1Open ↗
09/01/2026B01209443-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/01/2026B00590533-P2Open ↗
09/01/2026B00590533-P1Open ↗
09/01/2026B00590533-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/07/2011320080309Open ↗
10/09/2009320080309Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/09/2009320080309Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/09/2009320080309Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
10/17/2011320080309Open ↗
10/09/2009320080309Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/25/2011320080309Open ↗
▸Safety & Tenant Protection15
▸DOB NOWNYCSCA - Approved Site Safety Plans15
09/01/2026B00590530-I1Open ↗
09/01/2026B00590530-P1Open ↗
09/01/2026B00590530-P2Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/09/2009320080309Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01209443-I1Open ↗
▸Approvals, Objections & Sign-offs73
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
09/01/2026B00590533-P2Open ↗
09/01/2026B00590530-I1Open ↗
09/01/2026B00590530-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)28
09/01/2026B00590530-P2Open ↗
09/01/2026B00590530-I1Open ↗
09/01/2026B00590530-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
10/09/2009320080309Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/07/2011320080309Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/07/2011320080309Open ↗
10/09/2009320080309Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/09/2009320080309Open ↗
▸Other Documents54
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal32
09/01/2026B00590530-I1Open ↗
09/01/2026B00590530-P1Open ↗
09/01/2026B00590530-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSite Survey: Initial6
08/26/2026B00699197-S1Open ↗
08/26/2026B00699197-I1Open ↗
08/14/2026B00699197-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/26/2026B00699197-I1Open ↗
08/26/2026B00699197-S1Open ↗
08/14/2026B00699197-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/26/2026B00699197-I1Open ↗
08/26/2026B00699197-S1Open ↗
08/14/2026B00699197-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/26/2026B00699197-P1Open ↗
08/26/2026B00699197-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type