| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00688234 ↗ | 5601 16 AVENUE BROOKLYN | Alteration | Permit Issued | 03/09/2022 | 09/30/2026 | Design THORNTON TOMASETTI Filer ALBERT ARONOV ARCHITECT | New mechanical work for the renovation of existing toilet rooms as well as the addition of new toilets in the new elevator wing. |
| B00519708 ↗ | 265 FORBELL STREET BROOKLYN | Alteration | Permit Issued | 06/14/2021 | 09/14/2026 | Design SBLM ARCHITECTS, PC Filer SBLM | FILING HEREWITH IS FOR THE PLUMBING WORK RELATED TO THE PAVEMENT AND BACKFILLING RESTORATION. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY … |
| B00448149 ↗ | 75 MESEROLE AVENUE BROOKLYN | Alteration | Permit Issued | 02/10/2021 | 08/21/2026 | REMOVAL OF MASONRY AND TOILET PARTITIONS; DOORS AND HARDWARE; TOILET FINISHES AND ACCESSORIES. INSTALLATION OF ELEVATOR, MASONRY, GYPSUM BOA… | |
| X08022673 ↗ | 383 EAST 139 STREET BRONX | Alteration | Permit Issued | 11/03/2022 | 08/21/2026 | Filer HDR | PROVIDE NEW WXHAUST FANS AND TO ACCOMMODATE NEW AND UPGRADED TOILETS. PROVIDE HOIST VENT FOR NEW ELEVATOR. |
| S00821742 ↗ | 140 PALMA DRIVE STATEN ISLAND | Alteration | Permit Issued | 02/09/2023 | 08/19/2026 | Design SUPERSTRUCTURES ENG. + ARCH. | Work includes per the filed plans removal of existing plumbing fixtures, provide new ada toilets, lavatories, sinks & drinking fountains wit… |
| B01011532 ↗ | 12524 FLATLANDS AVENUE BROOKLYN | New Building | Permit Issued | 03/01/2024 | 08/12/2026 | Design STANTEC Filer STANTEC ARCHITECTURE | STRUCTURAL FRAMING ELEMENTS FOR NEW FIELD HOUSE |
| Name | Projects together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 15 | 08/19/2026 |
| SHENOY ENGINEERING, P.C. | 7 | 08/19/2026 |
| STEVEN PAUL HAMMER | 7 | 04/22/2026 |
| SUPERSTRUCTURES ENG. + ARCH. | 5 | 08/20/2025 |
| YSRAEL A. SEINUK, P.C. | 3 | 08/19/2026 |
| DI DOMENICO + PARTNERS LLP | 2 | 04/22/2026 |
| LAKHANI & JORDAN | 2 | 06/02/2026 |
| RKTB ARCHITECTS | 2 | 04/21/2026 |
| SEVERUD ASSOCIATES | 2 | 11/03/2025 |
| STANTEC | 2 | 08/19/2026 |
| STEPHEN B JACOBS GROUP | 2 | 06/02/2026 |
| THORNTON TOMASETTI | 2 | 07/26/2024 |
| Withdrawn | 2 | 10/07/2025 |
| A&J CONSULTING ENGINEERING SERVICES | 1 | 04/25/2025 |
| AECOM | 1 | 09/29/2022 |
| ALBERT ARONOV ARCHITECT | 1 | 04/21/2026 |
| BLADYKAS ENGINEERING, P.C. | 1 | 12/08/2025 |
| GERI GOLDMAN ENGINEERING | 1 | 02/29/2024 |
| GIUSEPPE TULUMELLO, AIA | 1 | 04/05/2023 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 08/18/2021 |
| GREENMAN-PEDERSEN, INC. | 1 | 09/29/2022 |
| HARTLAND ENGINEERING, DPC | 1 | 11/03/2025 |
| HDR ARCHITECTURE & ENGINEERING | 1 | 10/07/2025 |
| KERI ENGINEERING, P.C. | 1 | 04/03/2026 |
| KLIMENT HALSBAND ARCHITECTS LLP | 1 | 04/25/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| FORSYTHE PLBG & HTG CORP | 11 | 12/29/2025 |
| VARSITY PLBG AND HTG INC | 8 | 08/19/2026 |
| KEL-TECH CONSTRUCTION INC | 6 | 08/19/2026 |
| ARMY CONSTRUCTION LLC | 5 | 06/29/2026 |
| MAR-SAL PLBG & HTG, INC | 5 | 05/12/2026 |
| AKM CONSTRUCTION SERVICE* | 3 | 02/19/2025 |
| ANSU CONSTRUCTION INC | 3 | 08/19/2026 |
| FORSYTHE P&H CORP | 3 | 11/03/2025 |
| J & N CONSTRUCTION GROUP | 3 | 11/03/2025 |
| NIKHI CONTRACTING CORP | 3 | 04/22/2026 |
| EAGLE 1 MECHANICAL, INC | 2 | 10/07/2025 |
| EAGLE MECHANICAL INC | 2 | 08/20/2025 |
| FRANCO BELLI PLMG&HTG SON | 2 | 06/17/2026 |
| ROBERT PARCHMENT P&H.INC | 2 | 04/22/2026 |
| VENUS GROUP INC | 2 | 12/29/2025 |
| VITAL PLUMBING, INC | 2 | 06/02/2026 |
| ADAM'S EUROPEAN CONTRACTI | 1 | 10/04/2024 |
| AMP TECH INC | 1 | 06/17/2026 |
| CARNAK CONSTRUCTION INC | 1 | 06/06/2025 |
| CVM CONSTRUCTION CORP | 1 | 07/23/2024 |
| EURO CASTLE CONSTRUCTION | 1 | 02/29/2024 |
| INSPARISK. LLC | 1 | 09/29/2022 |
| KVP CONSTRUCTION CORP | 1 | 12/08/2025 |
| L.L.G. PLBG & HTG INC | 1 | 08/19/2026 |
| M&T PLBG AND HTG CO., INC | 1 | 06/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 19 | 08/19/2026 |
| NYC SCHOOL CONSTRUCTION | 8 | 04/03/2026 |
| NYCSCA | 4 | 12/09/2024 |
| DASNY | 1 | 08/18/2021 |
| DDC | 1 | 11/14/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 13 | 08/19/2026 |
| SUPERSTRUCTURES ENG + ARCH | 5 | 08/20/2025 |
| STANTEC ARCHITECTURE | 3 | 08/19/2026 |
| ALBERT ARONOV ARCHITECT | 2 | 04/21/2026 |
| THE STEPHEN B. JACOBS GROUP PC | 2 | 06/02/2026 |
| AECOM USA, INC. | 1 | 09/29/2022 |
| BLADYKAS ENGINEERING, P.C. | 1 | 12/08/2025 |
| GIUSEPPE TULUMELLO, AIA | 1 | 04/05/2023 |
| HDR | 1 | 10/07/2025 |
| J. CALLAHAN CONSULTING, INC. | 1 | 11/14/2024 |
| JAM CONSULTANTS, INC. | 1 | 04/22/2026 |
| JMV ASSOCIATES LLC | 1 | 04/25/2025 |
| PRECISION 3SIXTY NYC, INC | 1 | 07/23/2024 |
| SBLM | 1 | 11/03/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00688234 ↗ | 5601 16 AVENUE BROOKLYN | Alteration | Permit Issued | 03/09/2022 | 09/30/2026 | Design THORNTON TOMASETTI Filer ALBERT ARONOV ARCHITECT | New mechanical work for the renovation of existing toilet rooms as well as the addition of new toilets in the new elevator wing. |
| B00519708 ↗ | 265 FORBELL STREET BROOKLYN | Alteration | Permit Issued | 06/14/2021 | 09/14/2026 | Design SBLM ARCHITECTS, PC Filer SBLM | FILING HEREWITH IS FOR THE PLUMBING WORK RELATED TO THE PAVEMENT AND BACKFILLING RESTORATION. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY … |
| B00448149 ↗ | 75 MESEROLE AVENUE BROOKLYN | Alteration | Permit Issued | 02/10/2021 | 08/21/2026 | REMOVAL OF MASONRY AND TOILET PARTITIONS; DOORS AND HARDWARE; TOILET FINISHES AND ACCESSORIES. INSTALLATION OF ELEVATOR, MASONRY, GYPSUM BOA… | |
| X08022673 ↗ | 383 EAST 139 STREET BRONX | Alteration | Permit Issued | 11/03/2022 | 08/21/2026 | Filer HDR | PROVIDE NEW WXHAUST FANS AND TO ACCOMMODATE NEW AND UPGRADED TOILETS. PROVIDE HOIST VENT FOR NEW ELEVATOR. |
| S00821742 ↗ | 140 PALMA DRIVE STATEN ISLAND | Alteration | Permit Issued | 02/09/2023 | 08/19/2026 | Design SUPERSTRUCTURES ENG. + ARCH. | Work includes per the filed plans removal of existing plumbing fixtures, provide new ada toilets, lavatories, sinks & drinking fountains wit… |
| B01011532 ↗ | 12524 FLATLANDS AVENUE BROOKLYN | New Building | Permit Issued | 03/01/2024 | 08/12/2026 | Design STANTEC Filer STANTEC ARCHITECTURE | STRUCTURAL FRAMING ELEMENTS FOR NEW FIELD HOUSE |
| M01151000 ↗ | 413 WEST 123 STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 08/05/2026 | Design LAKHANI & JORDAN Owner NYCSCA | Structural work for a pool renovation. No change to use, egress or occupancy. |
| B00854243 ↗ | 334 46 STREET BROOKLYN | Alteration | Permit Issued | 04/05/2023 | 08/04/2026 | Design URBAHN ARCHITECTS | PROVIDE NEW EXHAUST FANS TO ACCOMMODATE NEW & UPGRADED TOILETS, INSTALL NEW OR MODIFY EXISTING DUCTWORK, MODIFY & REPLACE SUPPLY DUCTWORK DI… |
| M00851959 ↗ | 285 DELANCEY STREET MANHATTAN | Alteration | Permit Issued | 03/31/2023 | 07/16/2026 | Design GIUSEPPE TULUMELLO, AIA Owner NYCSCA Filer GIUSEPPE TULUMELLO, AIA | Remove and replace 8 roof drains. Re-flashing for existing vents at roof level. |
| B00346655 ↗ | 35 GLENMORE AVENUE BROOKLYN | Alteration | Permit Issued | 05/11/2020 | 07/14/2026 | Design ME ENGINEERS Owner DDC | FILING HEREWITH INSTALLATION OF HVAC SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00692119 ↗ | 116 COLUMBIA STREET MANHATTAN | Alteration | Permit Issued | 03/10/2022 | 07/14/2026 | Design STEVEN PAUL HAMMER Owner NYCSCA | Work includes per the filed plans remove / install sprinkler heads in cellar, sprinkler tamper switches, sprinkler water flow switches, clas… |
| B00781239 ↗ | 133 CLARKSON AVENUE BROOKLYN | Alteration | Permit Issued | 10/04/2022 | 07/13/2026 | plumbing work to replace roof drains in kind. and clean area drains | |
| X00955952 ↗ | 470 JACKSON AVENUE BRONX | Alteration | Permit Issued | 02/08/2024 | 07/01/2026 | Remove and replace 2 bulkhead doors and saddles and frames | |
| B00699197 ↗ | 3095 AVENUE V BROOKLYN | Alteration | Permit Issued | 03/16/2022 | 06/24/2026 | Design STEPHEN B JACOBS GROUP | Structural and foundation work for new 3 story elevator and stair addition , new ADA ramp, 1st floor elevator vestibule, relocation of stair… |
| B00916346 ↗ | 2840 WEST 12 STREET BROOKLYN | Alteration | Permit Issued | 08/11/2023 | 06/24/2026 | Design STEVEN PAUL HAMMER | work includes remove/replace face brick, spall/patch repairs, concrete crack repairs, replace existing sealant at all masonry openings, remo… |
| Q00956012 ↗ | 93-11 34 AVENUE QUEENS | Alteration | Permit Issued | 02/28/2024 | 06/23/2026 | Q149- REPLACE ROOF DRAINS WITH NEW, REPLACE AREA DRAINS & CATCH BASINS IN KIND. | |
| B00841542 ↗ | 2423 NEPTUNE AVENUE BROOKLYN | Alteration | Permit Issued | 03/13/2023 | 06/22/2026 | Work to include Parapet replacement, roof replacement, window replacement, exterior masonry work including face brick replacement, lintel re… | |
| B00771824 ↗ | 120 MARTIN L KING PLACE BROOKLYN | Alteration | Permit Issued | 07/15/2022 | 06/16/2026 | replace roof drain in kind and replace vent stacks in kind masonry project | |
| M00770539 ↗ | 2230 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/12/2022 | 06/15/2026 | Design AECOM Owner NYCSCA Filer AECOM USA, INC. | ST: Remove Portion of Building Facade and Portion of Existing Roof/ Floor Slabs. Provide New Concrete, Steel, and Masonry Construction. No c… |
| Q00317057 ↗ | 222-05 56 AVENUE QUEENS | Alteration | Permit Issued | 08/18/2021 | 06/11/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner DASNY Filer JMV ASSOCIATES LLC | FURNISH INSTALL AND MAKE OPERABLE HVAC UNITS. |
| B00956027 ↗ | 210 CHESTER STREET BROOKLYN | Alteration | Permit Issued | 02/16/2024 | 06/02/2026 | K263-REPLACE ROOF DRAINS & AREAWAY DRAINS WITH NEW. NEW TRENCH DRAINS. | |
| B00916716 ↗ | 2840 WEST 12 STREET BROOKLYN | Alteration | Permit Issued | 08/11/2023 | 05/20/2026 | Design STEVEN PAUL HAMMER | Work includes providing structural framing/slabs for elevator extension, opening in roof slab and landing for stair extension, structural fr… |
| M00951974 ↗ | 2345 1 AVENUE MANHATTAN | Alteration | Permit Issued | 03/05/2024 | 04/24/2026 | WORK SHALL INCLUDE: EXTERIOR MASONRY, PARAPET REPLACEMENT, ROOFING REPAIRS/REPLACEMENT, FLOOD ELIMINATION, PLASTER AND PAINTING. | |
| B00967855 ↗ | 2045 LINDEN BOULEVARD BROOKLYN | Alteration | Permit Issued | 12/12/2023 | 04/23/2026 | Design STEVEN PAUL HAMMER Filer JAM CONSULTANTS, INC. | Removal/Installation of ceiling. flooring, doors, interior partitions, and removal skylight related to Elevator modernization, and conversio… |
| Q01232837 ↗ | 70-02 54 AVENUE QUEENS | Alteration | Permit Issued | 05/30/2025 | 04/22/2026 | Design KERI ENGINEERING, P.C. Owner NYC SCHOOL CONSTRUCTION | Providing a new split AC unit and exhaust fan as part of the fire alarm upgrade, including replacement of existing fire/smoke dampers. |
| Q00788227 ↗ | 191-02 90 AVENUE QUEENS | Alteration | Permit Issued | 09/23/2022 | 04/20/2026 | Owner NYC SCHOOL CONSTRUCTION | Replacement of Roofs, Parapets, windows including window shades and guards, exterior masonry repairs, caulking, Plaster and painting and Mis… |
| Q01114949 ↗ | 75-02 21 AVENUE QUEENS | Alteration | Permit Issued | 02/12/2025 | 04/08/2026 | Owner NYC SCHOOL CONSTRUCTION | Q002- REPLACE ROOFTOP GRAVITY VENTILATORS & EXHAUST FANS. |
| X08034117 ↗ | 750 BAYCHESTER AVENUE BRONX | Alteration | Permit Issued | 11/04/2022 | 03/26/2026 | Design RKTB ARCHITECTS Filer ALBERT ARONOV ARCHITECT | X178 - PLUMBING WORK/ALTERATIONS RELATED TO FULL PROGRAM ACCESSIBILITY |
| 201202554BIS | 1855 ANTHONY AVENUE BRONX | — | ISSUED | 06/20/2023 | 03/25/2026 | — | MH, OT, PL, SP |
| B00955426 ↗ | 2510 AVENUE P BROOKLYN | Alteration | Permit Issued | 02/27/2024 | 03/24/2026 | Remove & replace existing roofing systems, parapets replacement , Brick & Masonry repairs and replacement of all school Windows And bulkhead… | |
| X00678506 ↗ | 1020 ANDERSON AVENUE BRONX | Alteration | Permit Issued | 02/16/2022 | 03/23/2026 | Design SUPERSTRUCTURES ENG. + ARCH. | Work includes per the filed plans provide new fixtures and risers on each floor for new toilet rooms, replace water closets, lavatories and … |
| 201204277BIS | 1855 ANTHONY AVENUE BRONX | — | ISSUED | 03/02/2023 | 03/16/2026 | — | MH, OT, PL |
| Q01011967 ↗ | 108-10 97 AVENUE QUEENS | Alteration | Permit Issued | 02/29/2024 | 03/05/2026 | Design STANTEC Owner NYC SCHOOL CONSTRUCTION Filer STANTEC ARCHITECTURE | Replace existing roof drains and relocate two existing plumbing vents and relocate 1 roof drain. |
| B08048120 ↗ | 543 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 02/08/2023 | 02/27/2026 | Roof replacement work related to PS 23. | |
| Q00577567 ↗ | 64-45 218 STREET QUEENS | Alteration | Permit Issued | 08/17/2021 | 02/26/2026 | Owner NYC SCHOOL CONSTRUCTION Filer JMV ASSOCIATES LLC | SUBSEQUENT FILING OF INTERIOR PLUMBING WORK TYPE FOR AN EXISTING SCHOOL BUILDING, INCLUDING REMOVAL, REPLACEMENT AND INSTALLATION OF NEW PLU… |
| 104214093BIS | 106 WEST 11 STREET MANHATTAN | — | ISSUED | 06/07/2024 | 02/24/2026 | — | MH, OT, PL |
| 201208022BIS | 701 ST ANNS AVENUE BRONX | — | ISSUED | 02/02/2024 | 01/26/2026 | — | MH, OT, PL |
| Q00955565 ↗ | 74-20 COMMONWEALTH BLVD QUEENS | Alteration | Permit Issued | 01/24/2024 | 01/07/2026 | Owner NYC SCHOOL CONSTRUCTION | Remove and replace 66 existing roof drains at the existing locations and remove and relocate 2 vent stacks. Relocate 6 gas vents on the roof… |
| B00787035 ↗ | 401 COLUMBIA STREET BROOKLYN | Alteration | Permit Issued | 10/04/2022 | 12/10/2025 | K027 : Installation of ACCU Condensing Units, Ductworks, Gravity Exhaust fans | |
| Q00960862 ↗ | 100-00 BEACH CHANNEL DRIVE QUEENS | Alteration | Permit Issued | 11/30/2023 | 11/24/2025 | Design BLADYKAS ENGINEERING, P.C. Owner NYC SCHOOL CONSTRUCTION | Q410 Beach Channel High School - Construct new partition and general construction associated with a new weight lifting room on the First Flo… |
| B00781248 ↗ | 970 WORTMAN AVENUE BROOKLYN | Alteration | Permit Issued | 09/22/2022 | 11/20/2025 | Structural work to accommodate Masonry Project | |
| B01017209 ↗ | 12524 FLATLANDS AVENUE BROOKLYN | Alteration | Permit Issued | 03/20/2024 | 11/07/2025 | Design SHENOY ENGINEERING, P.C. Filer STANTEC ARCHITECTURE | Proposed generator for new 1 story field house |
| 322053843BIS | 2929 WEST 2 STREET BROOKLYN | — | ISSUED | 09/01/2022 | 10/02/2025 | — | MH, OT, PL |
| Q00789314 ↗ | 85-05 144 STREET QUEENS | Alteration | Signed-off | 09/21/2022 | 09/30/2025 | Owner NYC SCHOOL CONSTRUCTION | Replacement of existing Masonry, Parapets , Roofs, in existing School. |
| 421899468BIS | 253-50 149 AVENUE QUEENS | — | ISSUED | 06/08/2023 | 07/17/2025 | — | MH, OT, PL |
| 322053326BIS | 29 NEW YORK AVENUE BROOKLYN | — | ISSUED | 05/23/2022 | 06/20/2025 | — | MH, OT, PL |