← Back
BuildNYC
Elevator apt, semi-fireproof without stores
La Casa De Felicidad
3097 3RD AVENUE · BIN 2001451
💬 Discuss this project
2005Year Built
7Stories
D1Building Class
R8Zoning
76,000 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized0 Active Violations 4 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · 26,511 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMasonry facade restoration1p · 1 filing · 10 docs
Floor 1Installation of heavy duty sidewalk shed7p · 2 filings · 6 docs
Site & exteriorSidewalk Shed Installation10p · 3 filings · 17 docs
Filed — no permit issuedExterior facade restoration and repairs8p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Department of Housing Pres. and Development1403/21/2026
NYC Department of Housing Preservation and Development1103/21/2026
Phipps Houses Services610/04/2026
KB25 Housing Development Fund603/21/2026
La Casa de Felicidad Housing Development203/21/2026
Nydhpd203/21/2026
Lacasa de Felicidad HDFC103/22/2026
HDFC103/21/2026
La Casa de Felicidad Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus110/01/2026
Enthink Engineers111/10/2022
Engineered Building Inspections, P111/04/2022
Mohammad Ahead, PE111/03/2021
Green Design111/06/2020
Syed Engineering104/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold903/21/2026
Spire Scaffolding & HoistScaffold603/21/2026
Sahara ContractingGeneral Contractor403/21/2026
Phoenix Sutton STRScaffold307/08/2026
Reliable EnterprisesScaffold303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544111/04/2022
Engineered Building Inspe1037111/04/2022
Building Lifecycle
All (110)Filed (6)Permit Issued (10)Signed Off (5)Facade (FISP) (15)Violation (60)Objection (2)Special Inspection (12)
10/01/2026
Filed — Alteration
Exterior facade restoration and repairs as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
X01461947-I1
10/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/01/2026
Special inspection requirement — Masonry
10/01/2026
Special inspection requirement — Post-installed Anchors
09/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2026
Special inspection requirement — Final
Caryn Koster
08/16/2024
Signed off — Alteration
X00622806-I1
06/24/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X08035609-I1
04/29/2024
Signed off — Alteration
FILING FOR FACADE RESTORATION AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANG IN USE, EGRESS OR OCCUPANCY.
X00743933-I1
09/21/2023
Cycle 9 facade report submitted
08/21/2023
Cycle 9 facade report signed — SAFE
08/14/2023
Cycle 9 facade inspection completed
08/10/2023
Permit issued — Sidewalk Shed
X00622806-I1-SH
06/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
X00424877-I1
03/23/2023
Permit issued — General Construction
X00743933-I1-ST
03/23/2023
Permit issued — Structural
X00743933-I1-GC
12/06/2022
Cycle 9 facade report submitted
12/05/2022
Cycle 9 facade inspection completed
12/05/2022
Cycle 9 facade report signed — UNSAFE
11/21/2022
Objection raised — Scope
11/21/2022
Objection resolved — Addressed
11/14/2022
Permit issued — Sidewalk Shed
X08035609-I1-SH
11/10/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X08035609-I1
11/05/2022
Signed off — Alteration
X00143566-I1
11/04/2022
Filed — Alteration
FILING FOR FACADE RESTORATION AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANG IN USE, EGRESS OR OCCUPANCY.
X00743933-I1
08/10/2022
Permit issued — Sidewalk Shed
X00622806-I1-SH
07/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Boccia
07/13/2022
Special inspection requirement — Air barrier - visual inspection
Frank Boccia
05/23/2022
Special inspection requirement — Masonry
Frank Boccia
05/23/2022
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
05/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Frank Boccia
05/23/2022
Special inspection requirement — Final
Frank Boccia
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2021
Permit issued — Sidewalk Shed
X00622806-I1-SH
11/03/2021
Filed — Alteration
X00622806-I1
11/01/2021
Permit issued — Sidewalk Shed
X00424877-I1-SH
11/01/2021
Cycle 9 facade report submitted
11/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2021
Cycle 9 facade inspection completed
07/12/2021
Cycle 9 facade report signed — UNSAFE
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2021
Violation issued (ECB, closed)
Elevators
11/06/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
X00424877-I1
11/06/2020
Permit issued — Sidewalk Shed
X00424877-I1-SH
10/30/2020
Permit issued — Sidewalk Shed
X00143566-I1-SH
02/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2019
Violation issued (ECB, closed)
Elevators
05/10/2019
Violation issued (HPD, closed)
C
05/10/2019
Violation issued (HPD, closed)
C
05/10/2019
Violation issued (HPD, closed)
B
04/24/2019
Permit issued — Sidewalk Shed
X00143566-I1-SH
04/23/2019
Filed — Alteration
X00143566-I1
03/19/2019
Special inspection requirement — Final
RAFI HAMID
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/04/2018
Violation issued (ECB, closed)
Elevators
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offKings Group NY08/10/2023
DOB NOWGeneral ConstructionSigned-offSahara Contracting03/23/2023
DOB NOWStructuralSigned-offSahara Contracting03/23/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises11/14/2022
DOB NOWSidewalk ShedSigned-offKings Group NY08/10/2022
DOB NOWSidewalk ShedSigned-offKings Group NY11/04/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR11/01/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR11/06/2020
DOB NOWSidewalk ShedPermit IssuedSpire Scaffolding & Hoist10/30/2020
DOB NOWSidewalk ShedPermit IssuedSpire Scaffolding & Hoist04/24/2019
BISOTISSUEDCanido Basonas Construction Service12/15/2020
BISOTISSUEDCanido Basonas Construction Service11/17/2020
BISOTISSUEDMonadnock Construction12/28/2017
BISOTISSUEDMonadnock Construction12/27/2017
BISEQISSUEDEverest Scaffolding11/08/2017
BISEQISSUEDEverest Scaffolding10/26/2017
BISEQISSUEDS&E Bridge & Scaffold06/06/2017
BISOTISSUEDMonadnock Construction03/17/2017
BISOTISSUEDMonadnock Construction03/17/2017
BISEQISSUEDEverest Scaffolding11/21/2016
BISEQISSUEDEverest Scaffolding11/04/2016
BISEQISSUEDS&E Bridge & Scaffold06/17/2016
BISEQISSUEDS&E Bridge & Scaffold06/15/2015
BISEQISSUEDS&E Bridge & Scaffold07/03/2014
BISEQISSUEDS&E Bridge & Scaffold07/02/2013
BISEQISSUEDS&E Bridge & Scaffold02/28/2013
BISEQISSUEDS&E Bridge & Scaffold03/14/2012
BISEQISSUEDS&E Bridge & Scaffold02/02/2012
BISEQISSUEDPerimeter Bridge & Scaffo08/11/2011
BISEQISSUEDMonadnock Construction11/16/2005
BIS—ISSUEDMonadnock Construction11/16/2005
BIS—ISSUEDMonadnock Construction06/07/2005
BISEQISSUEDColgate Scaffolding04/08/2005
BISEQISSUEDMonadnock Construction01/25/2005
BISEQISSUEDMonadnock Construction09/21/2004
BIS—ISSUEDMonadnock Construction09/17/2004
BISEQISSUEDMonadnock Construction06/29/2004
BIS—ISSUEDA. Russo Wrecking01/24/2002
BISEQISSUEDA. Russo Wrecking01/24/2002
BISEQISSUEDA. Russo Wrecking01/24/2002
+ 1 more permits on file
2 projects · most recent 11/11/2022
FiledStatusContractorScope
11/11/2022Permit IssuedRichard Neu—
10/28/2020CompleteElpo Electrical Contg—
1 project · most recent 11/10/2022
Sidewalk Shed
FiledStatusContractorScope
11/10/2022Signed-offReliable EnterprisesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/01/2026Structural Stability – Alterations of existing buildings—special
10/01/2026Masonry—special
10/01/2026Post-installed Anchors—special
09/17/2026Tenant Protection Plan Compliance—special
09/17/2026FinalCaryn Kosterprogress
07/13/2022Energy Code Compliance InspectionsFrank Bocciaprogress
07/13/2022Air barrier - visual inspectionFrank Bocciaenergy_progress
05/23/2022MasonryFrank Bocciaspecial
05/23/2022Post-installed AnchorsEUGENE BIFULCOspecial
05/23/2022Structural Stability – Alterations of existing buildingsFrank Bocciaspecial
05/23/2022FinalFrank Bocciaprogress
03/19/2019FinalRAFI HAMIDprogress
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
10/04/2026X01461947-I1Request digital key ↗
08/25/2026X00622806-I1Request digital key ↗
08/23/2026X08035609-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00143566-I1Request digital key ↗
08/25/2026X00424877-I1Request digital key ↗
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION19
12/15/2020220400242Open ↗
11/17/2020220400242Open ↗
01/02/2018220470755Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
03/19/2019220400242Open ↗
07/09/2018220242770Open ↗
07/09/2018220242770Open ↗
Showing 3 of 12 on file for this type
▸BISPROVIDE SIDEWALK SHED APPLICATION INFORMATION PRIOR TO PERMIT.1
11/17/2020220400242Open ↗
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
04/15/2019220400242Open ↗
03/19/2019220400242Open ↗
03/19/2019220400242Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026X01461947-I1Open ↗
08/26/2026X00143566-I1Open ↗
08/25/2026X00622806-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
10/04/2026X01461947-I1Open ↗
08/27/2026X00143566-I1Open ↗
08/25/2026X00743933-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/09/2018220242770Open ↗
06/16/2016220533297Open ↗
07/02/2013220242770Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/09/2018220242770Open ↗
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026X00743933-I1Open ↗
08/25/2026X00743933-I1Open ↗
08/25/2026X00743933-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/02/2013220242770Open ↗
08/16/2011220135002Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES4
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
03/19/2019220400242Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026X00424877-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed3
08/13/2026X00424877-I1Open ↗
08/13/2026X00143566-I1Open ↗
08/13/2026X00743933-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/31/2021220400242Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00743933-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/15/2019220400242Open ↗
08/13/2015220470755Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/31/2021220400242Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/14/2018220470755Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/17/2020220400242Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/18/2016240164148Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/31/2021220400242Open ↗
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/31/2021220400242Open ↗
10/09/2018240164148Open ↗
08/15/2018220470755Open ↗
Showing 3 of 8 on file for this type
▸BISSHED LETTER6
11/09/2017240164148Open ↗
06/13/2017220533297Open ↗
06/30/2015220242770Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/19/2019220400242Open ↗
07/16/2014220242770Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
10/04/2026X01461947-I1Open ↗
08/13/2026X00424877-I1Open ↗
▸BISFINAL1
11/17/2020220400242Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/16/2011220135002Open ↗
▸BISSUPERSEDING LETTER1
02/06/2012220135002Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
03/19/2019220400242Open ↗
08/14/2018220470755Open ↗
08/13/2015220470755Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/31/2021220400242Open ↗
▸Filing & Intake Forms20
▸BISBOROUGH INTAKE FORM7
12/15/2020220400242Open ↗
10/10/2018240164148Open ↗
10/09/2018240164148Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
03/19/2019220400242Open ↗
06/16/2016220533297Open ↗
08/13/2015220470755Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
10/10/2018240164148Open ↗
02/27/2018240162373Open ↗
06/27/2017220470755Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸Other Documents3
▸BISFEE EXEMPTION DOCUMENTATION2
11/18/2016240164148Open ↗
11/03/2016240162373Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
08/14/2018220470755Open ↗