| Owner | Filings | Most Recent |
|---|---|---|
| Consolidated Edison Company of New York | 466 | 09/13/2026 |
| Chpe | 21 | 07/08/2026 |
| New York Power Authority | 15 | 04/09/2026 |
| Transmission Developers | 5 | 03/22/2026 |
| Tdi-USA Holdings | 4 | 09/13/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Cha Consulting | 8 | 07/14/2026 |
| Tectonic Engineering Consultants, G | 2 | 06/17/2026 |
| Walter T. Gorman, P.E | 25 | 05/26/2026 |
| Bga | 3 | 04/15/2026 |
| Theodore Yen | 1 | 03/27/2026 |
| Richard Puswald PE | 1 | 12/11/2025 |
| Westbrook Associated Engineers | 1 | 12/04/2025 |
| S.M. Berger Architecture | 11 | 12/02/2025 |
| Waypoint Consulting Group | 2 | 11/21/2025 |
| Black Sheep Engineering Group | 2 | 11/07/2025 |
| Mott Macdonald | 1 | 07/24/2025 |
| HDR | 1 | 07/23/2025 |
| William R. Heiden, III | 1 | 06/25/2025 |
| Sargent and Lundy | 5 | 06/19/2025 |
| Parsons | 5 | 11/13/2024 |
| D.P. Consulting | 13 | 07/17/2024 |
| Atane | 4 | 07/17/2024 |
| Evan Clough | 1 | 05/28/2024 |
| Ancora Engineering | 4 | 04/04/2024 |
| Kevin M. Finn, P.E | 1 | 06/26/2023 |
| Fire & Risk Alliance | 1 | 06/15/2023 |
| Walter E. Wood Consulting | 1 | 06/13/2023 |
| CHA | 2 | 03/03/2023 |
| Cha Architecture | 2 | 03/02/2023 |
| MR Associates | 1 | 12/22/2021 |
| Consolidated Edison Company of New York | 2 | 10/29/2021 |
| Ryan Soames Engineering | 3 | 08/30/2021 |
| Langan Engineering | 1 | 09/10/2020 |
| Npe Consultants | 2 | 02/12/2020 |
| Scalar Architecture | 1 | 10/30/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Walter T Gorman PE | 50 | 03/21/2026 |
| J.A.M. Associates | 22 | 03/21/2026 |
| Municipal Building Consultants | 12 | 03/21/2026 |
| Walter T. Gorman, PE | 11 | 03/21/2026 |
| Construction Permit Services | 6 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Friedman Associates II | 2 | 03/21/2026 |
| Expedite Dem | 8 | 03/21/2026 |
| Metropolis Group | 2 | 03/21/2026 |
| Crown Design Consulting | 10 | 03/21/2026 |
| Commercial Capital USA | 6 | 03/21/2026 |
| Atane | 3 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| Consolidated Edison Company of New York | 4 | 03/21/2026 |
| D.P. Consulting | 16 | 03/21/2026 |
| C6 | 3 | 03/21/2026 |
| Eurocelt Expediting | 4 | 03/21/2026 |
| Taccetta Consulting | 1 | 03/21/2026 |
| Lewsan Consulting | 4 | 03/21/2026 |
| KM Associates of New York | 1 | 03/21/2026 |
| Walter T Gorman Pepc | 5 | 03/21/2026 |
| K & M Associates | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| V.H.I. Construction | General Contractor | 42 | 07/08/2026 |
| Acme Industrial | General Contractor | 21 | 07/08/2026 |
| D'Onofrio General Contractors | General Contractor | 17 | 09/07/2026 |
| Con Edison Company | General Contractor | 15 | 07/08/2026 |
| Gianfia | General Contractor | 15 | 07/08/2026 |
| Holt Construction | General Contractor | 14 | 07/08/2026 |
| Kiewit Infrastructure Co | General Contractor | 13 | 07/08/2026 |
| Eagle Scaffolding Services | Scaffold | 8 | 07/08/2026 |
| International Asb. Remov | General Contractor | 6 | 07/15/2026 |
| E-J Electric Installation | specialty_contractor | 5 | 07/08/2026 |
| ACS System Associates | General Contractor | 5 | 07/08/2026 |
| International Asb. Remov | Scaffold | 4 | 03/21/2026 |
| Williams Specialty Services | General Contractor | 4 | 07/08/2026 |
| M & S Building Services I | Plumbing | 4 | 07/08/2026 |
| NYC Fire Sprinkler | Fire Protection | 3 | 07/08/2026 |
| Grinnell | Fire Protection | 3 | 07/08/2026 |
| Deborah Bradley Cons & MG | General Contractor | 3 | 07/08/2026 |
| SKH Mechanical | Fire Protection | 2 | 07/08/2026 |
| Attri Enterprises | General Contractor | 2 | 03/21/2026 |
| Design Procure Builders | General Contractor | 2 | 03/21/2026 |
| O'Leary Construction | General Contractor | 2 | 07/08/2026 |
| Posillico Civil | General Contractor | 2 | 03/21/2026 |
| Attri Enterprises | Scaffold | 2 | 03/21/2026 |
| Starr Industries | Scaffold | 2 | 04/09/2026 |
| Par Plumbing Co | Plumbing | 2 | 07/08/2026 |
| Satellite Plumbing | Plumbing | 2 | 07/08/2026 |
| L J & A Construction | General Contractor | 1 | 07/08/2026 |
| Fresh Meadow Power-NE | General Contractor | 1 | 04/09/2026 |
| M&T Plumbing and Heating Co | Plumbing | 1 | 07/08/2026 |
| New York Plumbing-Heating-Cool | Fire Protection | 1 | 07/08/2026 |
| Fresh Meadow Mechanical | specialty_contractor | 1 | 04/09/2026 |
| Fresh Meadow Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Rimani Group | General Contractor | 1 | 08/30/2026 |
| Satellite East Plumbing | Plumbing | 1 | 07/08/2026 |
| Crescent Contracting | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Tectonic Engineering Cons | 106 | 48 | 07/14/2026 |
| Walter T. Gorman, P.E., P | 268 | 13 | 06/17/2026 |
| Catalpa Special Inspectio | 2004 | 11 | 12/02/2025 |
| Project Tactical Solution | 5859 | 1 | 05/28/2024 |
| Ancora Engineering | 6818 | 2 | 04/04/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Perfetto Contracting Co, I | 10/20/2026 |
| DOB NOW | Structural | Permit Issued | D'Onofrio General Contractors | 08/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | D'Onofrio General Contractors | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | Rimani Group | 08/28/2026 |
| DOB NOW | Foundation | Permit Issued | D'Onofrio General Contractors | 07/17/2026 |
| DOB NOW | Foundation | Signed-off | International Asb. Remov | 07/14/2026 |
| DOB NOW | Structural | Signed-off | International Asb. Remov | 06/25/2026 |
| DOB NOW | General Construction | Signed-off | Gianfia | 06/18/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 04/30/2026 |
| DOB NOW | General Construction | Signed-off | Kiewit Infrastructure Co | 03/31/2026 |
| DOB NOW | Plumbing | Signed-off | M & S Building Services I | 03/17/2026 |
| DOB NOW | General Construction | Signed-off | Kiewit Infrastructure Co | 02/09/2026 |
| DOB NOW | Structural | Permit Issued | D'Onofrio General Contracting | 12/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Acme Industrial | 12/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Acme Industrial | 12/30/2025 |
| DOB NOW | General Construction | Signed-off | E-J Electric Installation | 12/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Acme Industrial | 12/11/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Eagle Scaffolding Services | 12/11/2025 |
| DOB NOW | General Construction | Permit Issued | Kiewit Infrastructure Co | 12/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Acme Industrial | 12/10/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 11/25/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 11/14/2025 |
| DOB NOW | General Construction | Permit Issued | V.H.I. Construction | 11/13/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Starr Industries | 11/07/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Starr Industries | 11/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Acme Industrial | 10/31/2025 |
| DOB NOW | General Construction | Permit Issued | V.H.I. Construction | 10/29/2025 |
| DOB NOW | Structural | Permit Issued | D'Onofrio General Contracting | 10/27/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | Con Edison Company | 10/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Fresh Meadow Mechanical | 09/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/30/2025 | Signed-off | Acme Industrial | Air Conditioning Systems | Cooling Carrier 50FE-M08A2A5-8W0A0 75 tons · Fan Coil Indoor ×1 |
| 06/19/2025 | Signed-off | E-J Electric Installation | Heating and Air Conditioning Systems | Heat / Cool Bard W36HF-B05VWXXXJ 33,000 BTU · Condensing Unit ×2 |
| 07/17/2024 | Permit Issued | ACS System Associates | Air Conditioning Systems | — |
| 07/17/2024 | Signed-off | D'Onofrio General Contracting | Associated Ducts and Piping, Ventilation Systems | |
| 10/28/2021 | Permit Issued | V.H.I. Construction | Others | Other __Junk__ abcd Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2024 | Signed-off | Grinnell | 42 heads |
| 04/12/2024 | Signed-off | NYC Fire Sprinkler | 194 heads |
| 03/02/2023 | Signed-off | NYC Fire Sprinkler | 12 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2024 | Signed-off | Satellite East Plumbing | Water/Sanitary |
| 09/26/2023 | Signed-off | M & S Building Services I | Storm |
| 03/02/2023 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 02/22/2023 | Signed-off | Par Plumbing Co | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/19/2026 | Permit Issued | E-J Electric Installation Co | General Wiring, Lighting |
| 03/04/2026 | Permit Issued | Transel Elev. & Electric | General Wiring |
| 12/04/2025 | Permit Issued | Proven Electrical Contrng | General Wiring |
| 11/25/2025 | Permit Issued | J.A. Lee Electric Services | General Wiring |
| 10/14/2025 | Permit Issued | Robert B Samuels | General Wiring |
| 10/02/2024 | Permit Issued | Consolidated Edison Co | General Wiring |
| 09/24/2024 | Complete | Consolidated Edison Co | — |
| 07/29/2024 | Complete | Consolidated Edison Co | General Wiring |
| 05/24/2024 | Permit Issued | Consolidated Edison Co | — |
| 05/21/2024 | Complete | Consolidated Edison Co | — |
| 02/29/2024 | Complete | Consolidated Edison Co | General Wiring |
| 02/26/2024 | Complete | Consolidated Edison Co | — |
| 12/04/2023 | Complete | Consolidated Edison Co | — |
| 12/04/2023 | Complete | Consolidated Edison Co | — |
| 11/27/2023 | Permit Issued | Powerone Elect'l Contracting | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | Rimani Group | 1 scope_items |
| 06/17/2026 | Signed-off | International Asb. Remov | Steel |
| 03/17/2026 | — | — | 2 scope_items |
| 12/04/2025 | Permit Issued | D'Onofrio General Contracting | Steel |
| 07/24/2025 | — | — | 1 scope_items |
| 07/23/2025 | Permit Issued | D'Onofrio General Contracting | Steel |
| 11/13/2024 | Signed-off | D'Onofrio General Contracting | Concrete |
| 07/17/2024 | Signed-off | D'Onofrio General Contracting | Steel |
| 07/03/2024 | Permit Issued | Attri Enterprises | Steel, Masonry |
| 04/06/2023 | Permit Issued | O'Leary Construction | 1 scope_items |
| 02/21/2023 | Permit Issued | Holt Construction | Steel, Concrete |
| 11/17/2021 | Permit Issued | V.H.I. Construction | 1 scope_items |
| 09/28/2021 | Permit Issued | Gianfia | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/07/2025 | Permit Issued | Starr Industries | Sidewalk Shed |
| 04/04/2024 | Signed-off | International Asb. Remov | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2025 | Permit Issued | D'Onofrio General Contracting | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/15/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/07/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 04/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/26/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/14/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/27/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/26/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/19/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/25/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/05/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/30/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/31/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/16/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/11/2026 | Structural Steel - High Strength Bolting | Abbas Family | special |
| 06/11/2026 | Final | Abbas Family | progress |
| 06/11/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 06/11/2026 | Open-web Steel Joists and Joist Girders | Abbas Family | special |
| 06/11/2026 | Structural Cold-Formed Steel | Abbas Family | special |
| 06/11/2026 | Structural Steel - Details | Abbas Family | special |
| 05/22/2026 | Deep Foundation Elements | Abbas Family | special |
| 05/20/2026 | Subsurface Investigations (Borings/Test Pits) | MARK STIER | special |
| 05/12/2026 | Footing and Foundation | Abbas Family | progress |
| 05/12/2026 | Concrete - Precast | Abbas Family | special |
| 05/12/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 05/12/2026 | Subgrade Inspections | Abbas Family | special |
| 05/12/2026 | Subsurface Conditions – Fill Placement & In-Place Density | Abbas Family | special |
| 05/12/2026 | Final | Abbas Family | progress |
| 04/03/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | GEORGE GHEBRYAL | special |
| 12/03/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 12/03/2025 | Final | Abbas Family | progress |
| 12/01/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 11/26/2025 | Maintenance information | Sanford Berger | energy_progress |
| 11/26/2025 | HVAC-R and service water heating equipment | Sanford Berger | energy_progress |
| 11/20/2025 | Final | Abbas Family | progress |
| 11/18/2025 | Fire-Resistant Penetrations and Joints | Sanford Berger | special |
| 11/18/2025 | Final | Sanford Berger | progress |
| 11/18/2025 | Mechanical Systems | Sanford Berger | special |
| 11/17/2025 | Final | Alejandro Molina | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Consolidated Edison | Industrial / Warehouse | Entire building | Project Q01315503 Project Q01320331 Project Q01317013 Project Q01276409 Project Q01229289 Project Q01107982 Project Q01032829 Project Q01032869 Project Q00948655 Project Q00892565 Project Q00603951 Project Q00884305 |
| Con Edison-astoria Annex Substation | Industrial / Warehouse | — | Project Q01211013 Project Q01203214 |
| Consoi Idatfd Fdison Company of NFW York | Office | Floor 1 | Project Q00968879 |