← Back
QUEENS
Siena Condominium
31-29 CRESCENT STREET · BIN 4623971
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof5p · 2 filings · 20 docs
Bulkhead5p · 3 filings · 20 docs
Floor 75p · 3 filings · 20 docs
Floor 67p · 4 filings · 20 docs
Floor 52p · 2 filings · 20 docs
Floor 41p · 1 filing · 10 docs
Floor 3
Floor 23p · 1 filing · 10 docs
Floor 13p · 2 filings · 20 docs
Cellar9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONSTRUCTION6407/08/2026
OWNERS REP707/08/2026
PLATINUM SERVICES NY1007/08/2026
PARKSITE CONSTRUCTION803/21/2026
CRESCENT STREET REALTY ASSOC403/21/2026
1836 GILFORD AVE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2019$3.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN1003/21/2026
COSTA ARCHITECTURE & ENGINEERING LL2203/21/2026
AE DESIGN SOLUTION803/21/2026
COSTA ARCH ENG803/21/2026
GREEN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK CONSTRUCTION CORPGeneral Contractor1807/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
FIVE BOROUGH NYC LLCFire Protection407/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
PAL-MAR PLBG & HTG INCPlumbing307/08/2026
G. G. ELECTRIC CORP.Electrical203/22/2026
LIQUID PLBG & HTNG SCS INPlumbing207/08/2026
SCHILLCO MECAHNICAL INCGeneral Contractor107/08/2026
MTK CONTRACTING INCGeneral Contractor104/09/2026
PARKSITE CONSTRUCTION CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404208/01/2025
PROFESSIONAL SOLUTIONS GR1756708/22/2024
Building Lifecycle
All (203)Filed (27)Permit Issued (29)Signed Off (15)Violation (10)Inspection (13)Objection (76)Special Inspection (30)Tax Incentive (3)
04/23/2026
Signed off — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-I1
04/20/2026
Signed off — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-S1
03/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Permit issued — Plumbing
Q01198172-S1-PL
10/06/2025
Filed — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-P3
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
08/15/2025
Special inspection requirement — Lighting in dwelling units
Kenny Mak
08/15/2025
Special inspection requirement — Final
Kayan Tse
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
08/01/2025
Filed — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-P1
07/31/2025
Filed — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-P2
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
07/29/2025
Special inspection requirement — Lighting in dwelling units
Kenny Mak
07/29/2025
Special inspection requirement — Final
Kayan Tse
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
05/12/2025
Permit issued — Plumbing
Q01198172-S1-PL
04/29/2025
Permit issued — General Construction
Q01198172-I1-GC
04/22/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Cost
04/09/2025
Objection raised — Admin
03/31/2025
Filed — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-I1
03/31/2025
Filed — Alteration
CAP AND REMOVE PLUMBING FIXTURES (1 SINK, 1 DW, 1 LAV, 1 WC, 2 TUB); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 LAV, 1 WC, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT PHC ON THE 7TH FLOOR
Q01198172-S1
02/06/2025
Signed off — Alteration
Q00686022-I1
11/25/2024
485-x registration filed
10/15/2024
485-x construction completed
09/20/2024
Signed off — Alteration
FOUNDATION WORK AND RETAINING WALL ASSOCIATED WITH NB
Q00682204-I1
09/19/2024
Signed off — Alteration
INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A 7 STORY NEW BUILDING.
Q00363603-I1
09/19/2024
Signed off — Alteration
INSTALLATION OF NEW PLUMBING WORK IN CONJUNCTION TO THE NEW 7 STORY BUILDING AT 31-27 CRESCENT STREET NB APPLICATION #420667736
Q00363594-I1
09/19/2024
Signed off — Alteration
UNDERPINNING ASSOCIATED WITH NB APPLICATION
Q00612330-I1
09/11/2024
Special inspection requirement — Shutoff dampers
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Heating Systems
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Final
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — HVAC and service water heating equipment
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Duct leakage testing
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — HVAC insulation and sealing
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — HVAC and service water heating system controls
SAMER ABOU-GHAIDA
09/11/2024
Special inspection requirement — Permanent certificate
SAMER ABOU-GHAIDA
09/03/2024
Signed off — Alteration
FILING FOR NEW CURB CUT IN CONJUNCTION TO NEW BUILDING APPLICATION #420667736
Q00358322-I1
09/03/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Other
08/29/2024
Filed — Alteration
INSTALLATION OF NEW PLUMBING WORK IN CONJUNCTION TO THE NEW 7 STORY BUILDING AT 31-27 CRESCENT STREET NB APPLICATION #420667736
Q00363594-P4
08/29/2024
Objection raised — Admin
08/29/2024
Objection resolved — Addressed
08/22/2024
Filed — Alteration
INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A 7 STORY NEW BUILDING.
Q00363603-P1
08/20/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/19/2024
Objection resolved — Addressed
08/14/2024
Special inspection requirement — HVAC and service water heating equipment
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — HVAC insulation and sealing
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Permanent certificate
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Shutoff dampers
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Duct leakage testing
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — HVAC and service water heating system controls
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Heating Systems
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
08/14/2024
Special inspection requirement — Final
SAMER ABOU-GHAIDA
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN03/19/2026
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN05/12/2025
DOB NOWGeneral ConstructionSigned-offMTK CONTRACTING INC04/29/2025
DOB NOWCurb CutSigned-offPARKSITE CONSTRUCTION COR08/13/2024
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC06/24/2024
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC02/15/2024
DOB NOWStandpipeSigned-offFIVE BOROUGH NYC LLC02/14/2024
DOB NOWMechanical SystemsSigned-offSCHILLCO MECAHNICAL INC08/01/2023
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP07/14/2023
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP07/14/2023
DOB NOWStandpipeSigned-offFIVE BOROUGH NYC LLC03/28/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC03/28/2023
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC03/10/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/07/2022
DOB NOWStructuralSigned-offPARK CONSTRUCTION CORP11/28/2022
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP11/28/2022
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP11/28/2022
DOB NOWStructuralSigned-offPARK CONSTRUCTION CORP11/04/2022
DOB NOWFoundationSigned-offPARK CONSTRUCTION CORP10/31/2022
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC08/22/2022
DOB NOWFoundationSigned-offPARK CONSTRUCTION CORP06/07/2022
DOB NOWSupport of ExcavationSigned-offPARK CONSTRUCTION CORP03/25/2022
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP12/22/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/16/2021
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/07/2021
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP12/18/2020
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP11/12/2020
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP09/02/2020
BIS—ISSUEDPARK CONSTRUCTION CORP12/19/2023
BIS—ISSUEDPARK CONSTRUCTION CORP09/12/2023
BIS—ISSUEDPARK CONSTRUCTION CORP11/29/2022
BIS—ISSUEDPARK CONSTRUCTION CORP09/15/2022
BIS—ISSUEDPARK CONSTRUCTION CORP07/25/2022
BIS—ISSUEDPARK CONSTRUCTION CORP06/17/2022
7 projects · most recent 05/28/2025
General Wiring
FiledStatusContractorScope
05/28/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/12/2024CompleteG. G. ELECTRIC CORP.General Wiring
12/06/2022CompleteSOLAS ELECTRICAL CORP—
11/20/2022CompleteG. G. ELECTRIC CORP.General Wiring
09/27/2022CompleteTUXEDO ELEC'L CONTR'G INC—
02/13/2021CompleteG. G. ELECTRIC CORP.1 meters, 1 new_meters
10/14/2020CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 01/06/2021
Sidewalk Shed
FiledStatusContractorScope
01/06/2021Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/31/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/31/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/31/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/28/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/15/2025Fire-Resistant Penetrations and JointsKenny Makspecial
08/15/2025Lighting in dwelling unitsKenny Makenergy_progress
08/15/2025FinalKayan Tseprogress
08/15/2025Energy Code Compliance InspectionsKenny Makprogress
07/29/2025Fire-Resistant Penetrations and JointsKenny Makspecial
07/29/2025Lighting in dwelling unitsKenny Makenergy_progress
07/29/2025FinalKayan Tseprogress
07/29/2025Energy Code Compliance InspectionsKenny Makprogress
09/11/2024Shutoff dampersSAMER ABOU-GHAIDAenergy_progress
09/11/2024Mechanical SystemsSAMER ABOU-GHAIDAspecial
09/11/2024Heating SystemsSAMER ABOU-GHAIDAspecial
09/11/2024FinalSAMER ABOU-GHAIDAprogress
09/11/2024Maintenance informationSAMER ABOU-GHAIDAenergy_progress
09/11/2024HVAC and service water heating equipment SAMER ABOU-GHAIDAenergy_progress
09/11/2024Duct leakage testing SAMER ABOU-GHAIDAenergy_progress
09/11/2024HVAC insulation and sealing SAMER ABOU-GHAIDAenergy_progress
09/11/2024HVAC and service water heating system controls SAMER ABOU-GHAIDAenergy_progress
09/11/2024Permanent certificateSAMER ABOU-GHAIDAenergy_progress
08/14/2024HVAC and service water heating equipment SAMER ABOU-GHAIDAenergy_progress
08/14/2024HVAC insulation and sealing SAMER ABOU-GHAIDAenergy_progress
08/14/2024Permanent certificateSAMER ABOU-GHAIDAenergy_progress
08/14/2024Maintenance informationSAMER ABOU-GHAIDAenergy_progress
08/14/2024Shutoff dampersSAMER ABOU-GHAIDAenergy_progress
08/14/2024Duct leakage testing SAMER ABOU-GHAIDAenergy_progress
08/14/2024HVAC and service water heating system controls SAMER ABOU-GHAIDAenergy_progress
Latest 25 of 39.
▾Documents — 212 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch14
08/27/2026Q00612409-I1Request digital key ↗
08/26/2026Q00686022-I1Request digital key ↗
08/25/2026Q08049436-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/21/2026Q00363594-I1Request digital key ↗
08/21/2026Q00363594-P2Request digital key ↗
08/15/2026Q00363594-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
08/28/2026Q00384706-I1Request digital key ↗
08/28/2026Q00386274-I1Request digital key ↗
08/27/2026Q00413719-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/27/2026Q00413719-I1Request digital key ↗
08/27/2026Q00445704-I1Request digital key ↗
08/15/2026Q00413719-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/21/2026Q00363603-I1Request digital key ↗
08/15/2026Q00363603-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/27/2026Q00413719-I1Request digital key ↗
08/15/2026Q00413719-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00358322-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION14
04/23/2025421839407Open ↗
02/26/2025420667736Open ↗
04/25/2024420667736Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION2
10/24/2022420667736Open ↗
10/24/2022420667736Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/27/2023440592379Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/25/2024420667736Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
02/05/2024421839407Open ↗
05/02/2022420667736Open ↗
04/29/2022440592379Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/02/2022420667736Open ↗
▸BISVERIFY TAX LOT1
08/14/2024420667736Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/15/2024420667736Open ↗
▸BISZONING DIAGRAM1
05/02/2022420667736Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/02/2022420667736Open ↗
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/28/2026Q00358322-I1Open ↗
08/27/2026Q00413719-I1Open ↗
08/27/2026Q00413719-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/20/2026Q00413719-I1Open ↗
08/28/2026Q01198172-P1Open ↗
08/28/2026Q01198172-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/28/2026Q01198172-P1Open ↗
08/27/2026Q00612330-I1Open ↗
08/26/2026Q00363603-P1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/24/2020440592379Open ↗
▸Trade Schedules & Equipment3
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/11/2025420667736Open ↗
05/02/2022420667736Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/02/2022420667736Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
08/25/2023440592379Open ↗
05/06/2022420667736Open ↗
▸BISSTREET TREES SITE PLAN2
09/29/2023420667736Open ↗
04/29/2022440592379Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/02/2022420667736Open ↗
▸BISSTREET TREE SIGNOFF1
03/11/2025420667736Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/14/2024420667736Open ↗
08/14/2024420667736Open ↗
05/02/2022420667736Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
08/14/2024420667736Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/14/2024420667736Open ↗
▸BISFENESTRATION AREAS1
08/14/2024420667736Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/14/2024420667736Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/14/2024420667736Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/14/2024420667736Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/14/2024420667736Open ↗
▸BISELECTRIC MOTORS1
08/14/2024420667736Open ↗
▸BISLIGHTING CONTROLS1
08/14/2024420667736Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2024420667736Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
08/14/2024420667736Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/14/2024420667736Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/14/2024420667736Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00363603-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/14/2024420667736Open ↗
08/14/2024420667736Open ↗
06/17/2022420667736Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
07/15/2024420667736Open ↗
05/27/2022420667736Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/08/2022420667736Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/14/2024420667736Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/14/2024420667736Open ↗
▸BISMASONRY1
08/14/2024420667736Open ↗
▸BISVERTICAL MASONRY FOUNDATION ELEMENTS/PIERS1
08/14/2024420667736Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
08/14/2024420667736Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
08/14/2024420667736Open ↗
▸BISSOIL REPORT1
05/02/2022420667736Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/02/2022420667736Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/08/2022420667736Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00686022-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE7
09/19/2023420667736Open ↗
08/31/2023420667736Open ↗
08/23/2023420667736Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/02/2021420667736Open ↗
12/02/2021420667736Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/24/2025440592379Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/24/2022420667736Open ↗
06/17/2022420667736Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION12
08/13/2024420667736Open ↗
09/28/2023420667736Open ↗
09/28/2023420667736Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET2
04/23/2025421839407Open ↗
06/25/2020420667736Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/24/2020440592379Open ↗
▸Other Documents12
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00682204-I1Open ↗
08/13/2026Q00612409-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/02/2022420667736Open ↗
▸BISVESTIBULES1
08/14/2024420667736Open ↗
▸BISMAINTENANCE INFORMATION1
08/14/2024420667736Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/05/2024421839407Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/14/2024420667736Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/29/2022440592379Open ↗
▸BISPLOT DIAGRAM1
04/23/2025421839407Open ↗
▸BISSITE SURVEY: FINAL1
—420667736Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
02/05/2024421839407Open ↗
▸BISSITE SURVEY: INITIAL1
—420667736Open ↗