← Back
Elevator apt, semi-fireproof without stores
31-35 CRESCENT STREET
QUEENS · BIN 4007109
💬 Discuss this project
1961Year Built
6Stories
D1Building Class
R6AZoning
100,400 sfGross Floor Area
122Units
LL97 CoveredRent Stabilized11 Open Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: PENNSYLVANIA LEASINGLIMITED PARTNERSHIP · 24,400 sf lot · 4.11 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 3 docs
Floor 635p · 1 filing · 20 docs
Floor 535p · 1 filing · 20 docs
Floor 435p · 1 filing · 20 docs
Floor 335p · 1 filing · 20 docs
Floor 235p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar38p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY404/09/2026
PENNSYLVANIA LEASINGLIMITED PARTNERSHIP3603/22/2026
MID STATE MANAGEMENT C403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP105/03/2025
SCOPE ENGINEERING CONSULTANTS PC104/16/2025
BAUER DERMEL ARCHITECT606/06/2024
OMDEX INC106/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
METROPOLIS GROUP INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAY WATERPROOFING CORPGeneral Contractor203/21/2026
TERRANOVA ELECTRIC INCElectrical103/22/2026
ALESSANDRO PLUMBING, INCFire Protection107/08/2026
DINACO CONTRACTING CORPGeneral Contractor107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
MJ GENERAL MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL CODE CONSUL5516104/16/2025
SCOPE ENGINEERING CONSULT7894104/16/2025
CMSC, INC60981006/06/2024
Building Lifecycle
All (137)Filed (10)Permit Issued (6)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (10)Objection (6)Special Inspection (22)
08/03/2026
Cycle 10 facade report submitted
07/29/2026
Cycle 10 facade report signed — SAFE
06/11/2026
Cycle 10 facade inspection completed
05/06/2026
Signed off — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTIONS
Q01219934-I1
04/14/2026
Violation issued (HPD, closed)
A
01/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01220049-I1
01/07/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (HPD, closed)
C
12/04/2025
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01203500-I1
10/31/2025
Violation issued (HPD, closed)
A
10/31/2025
Violation issued (HPD, open)
B
10/31/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
C
08/22/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
C
08/18/2025
Violation issued (HPD, closed)
B
08/18/2025
Violation issued (HPD, open)
C
07/28/2025
Violation issued (ECB, closed)
Elevators
07/14/2025
Violation issued (HPD, closed)
B
07/14/2025
Violation issued (HPD, closed)
B
07/14/2025
Violation issued (HPD, closed)
B
06/19/2025
Violation issued (HPD, closed)
C
06/02/2025
Permit issued — General Construction
Q01203500-I1-GC
05/07/2025
Permit issued — Suspended Scaffold
Q01219934-I1-SC
05/05/2025
Permit issued — Sidewalk Shed
Q01220049-I1-SH
05/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01220049-I1
05/02/2025
Filed — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTIONS
Q01219934-I1
04/16/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01203500-I1
03/31/2025
Special inspection requirement — Final
Raffaele Albanese
03/31/2025
Special inspection requirement — Masonry
Paul Henry
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel Karpen
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/17/2025
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
C
12/14/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
C
11/13/2024
Violation issued (HPD, closed)
C
11/13/2024
Violation issued (HPD, closed)
B
10/29/2024
Violation issued (HPD, closed)
C
10/03/2024
Violation issued (HPD, closed)
C
09/30/2024
Violation issued (HPD, closed)
C
09/30/2024
Violation issued (HPD, closed)
C
09/26/2024
Violation issued (HPD, closed)
C
09/26/2024
Violation issued (HPD, closed)
B
09/26/2024
Violation issued (HPD, closed)
C
09/26/2024
Violation issued (HPD, closed)
C
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/18/2024
Violation issued (HPD, closed)
C
09/12/2024
Violation issued (HPD, closed)
C
09/12/2024
Violation issued (HPD, closed)
C
09/11/2024
Violation issued (HPD, closed)
C
09/07/2024
Violation issued (HPD, closed)
C
09/07/2024
Violation issued (HPD, closed)
A
09/07/2024
Violation issued (HPD, closed)
A
09/04/2024
Violation issued (HPD, closed)
A
09/04/2024
Violation issued (HPD, closed)
C
09/04/2024
Violation issued (HPD, closed)
A
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKAY WATERPROOFING CORP06/02/2025
DOB NOWSuspended ScaffoldSigned-offKAY WATERPROOFING CORP.05/07/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/05/2025
DOB NOWSprinklersSigned-offALESSANDRO PLUMBING, INC07/08/2022
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC06/22/2022
DOB NOWGeneral ConstructionPermit IssuedDINACO CONTRACTING CORP05/18/2022
BISOTISSUEDFOREMOST CONSTRUCTION LLC05/10/2019
BISEQISSUEDSCAFFOLD DISTRIBUTORS OF11/15/2018
BISPLISSUEDVELOCITY PLUMBING & HEAT10/26/2018
BISOTISSUEDTATAMS MANAGEMENT CORP09/18/2018
BISOTISSUEDTATAMS MANAGEMENT CORP08/31/2018
BISOTISSUEDKNS BUILDING REST. INC03/29/2018
BISOTISSUEDKNS BUILDING REST. INC03/29/2018
BISEQISSUEDSCAFFOLD DISTRIBUTORS OF08/11/2017
BISPLISSUEDVARSITY PLBG & HTG INC05/25/2017
BISOTISSUEDKNS BUILDING REST. INC04/14/2017
BISOTISSUEDKNS BUILDING REST. INC03/07/2017
BISOTISSUEDKNS BUILDING REST. INC01/25/2017
BISOTISSUEDKNS BUILDING REST. INC09/13/2016
BISEQISSUEDSCAFFOLD DISTRIBUTORS OF08/04/2016
BISOTISSUEDSKYLINE RESTORATION INC10/22/2015
BISEQISSUEDSCAFFOLD DISTRIBUTORS OF08/19/2015
BISOTISSUEDRICONDA MAINTENANCE INC01/28/2013
BISOTISSUEDRICONDA MAINTENANCE INC01/28/2013
BISEQISSUEDEVEREST SCAFFOLDING INC07/13/2012
BISOTISSUEDRICONDA MAINTENANCE INC05/09/2012
BISOTISSUEDRICONDA MAINTENANCE INC05/09/2012
BISEQISSUEDEVEREST SCAFFOLDING INC08/16/2011
BISPLISSUEDMAXIMUM MECHANICAL CORP03/11/2002
BISFBISSUEDEFFICIENT COMB&COOLING CO11/09/1998
BISPLISSUEDMAXIMUM MECHANICAL CORP10/29/1998
5 projects · most recent 05/03/2025
General Wiring
FiledStatusContractorScope
05/03/2025CompleteRICHARD NEU—
06/18/2024CancelledTERRANOVA ELECTRIC INCGeneral Wiring
08/24/2023CompleteNEW YORK CITY ELECT SVCSGeneral Wiring
11/10/2022CompleteM F ELEC'L SVC CO., INCGeneral Wiring
06/18/2019CompleteTAKOS AND K ELECTRIC INCGeneral Wiring
1 project · most recent 05/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/02/2025Signed-offKAY WATERPROOFING CORP.Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/19/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2022Fail-Final CND-Occupancy InspectionFailView ↗
08/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/31/2025FinalRaffaele Albaneseprogress
03/31/2025MasonryPaul Henryspecial
03/31/2025Tenant Protection Plan ComplianceDaniel Karpenspecial
07/02/2024Energy Code Compliance InspectionsEDUARD GRINFELDprogress
07/02/2024Lighting controlsBAUER DERMELenergy_progress
07/02/2024Lighting in dwelling unitsBAUER DERMELenergy_progress
07/02/2024Concrete - Cast-In-PlaceEDUARD GRINFELDspecial
07/02/2024Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
07/02/2024Fire-Resistance Rated ConstructionEDUARD GRINFELDprogress
06/06/2024Energy Code Compliance InspectionsEDUARD GRINFELDprogress
06/06/2024Fire-Resistance Rated ConstructionEDUARD GRINFELDprogress
06/06/2024Lighting in dwelling unitsBAUER DERMELenergy_progress
06/06/2024Lighting controlsBAUER DERMELenergy_progress
06/06/2024Concrete - Cast-In-PlaceEDUARD GRINFELDspecial
06/06/2024Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
12/08/2023Concrete - Cast-In-PlaceEDUARD GRINFELDspecial
12/08/2023Lighting in dwelling unitsBAUER DERMELenergy_progress
12/08/2023Lighting controlsBAUER DERMELenergy_progress
12/08/2023Fire-Resistance Rated ConstructionEDUARD GRINFELDprogress
12/08/2023Energy Code Compliance InspectionsEDUARD GRINFELDprogress
12/08/2023Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
06/14/2022Sprinkler SystemsEDUARD GRINFELDspecial
▾Documents — 281 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00591171-I1Request digital key ↗
08/26/2026Q00757156-I1Request digital key ↗
08/23/2026Q00557000-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION34
10/11/2023420371476Open ↗
08/07/2023420371476Open ↗
08/07/2023420371476Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION18
07/24/2019421738999Open ↗
05/21/2019421738999Open ↗
01/18/2019421669126Open ↗
Showing 3 of 18 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
08/16/2018421231321Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00557000-I1Open ↗
▸Seals & Professional Certifications66
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
08/01/2019421738999Open ↗
05/17/2019421738999Open ↗
01/26/2019421669126Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/16/2026Q01203500-I1Open ↗
08/28/2026Q00557000-I1Open ↗
08/28/2026Q00557000-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/16/2026Q01203500-I1Open ↗
09/16/2026Q01203500-I1Open ↗
08/28/2026Q00557000-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00591171-I1Open ↗
08/20/2026Q01203500-I1Open ↗
08/20/2026Q01220049-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/02/2019421738999Open ↗
09/17/2018421669126Open ↗
04/20/2017421453135Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/17/2018421669126Open ↗
05/24/2017440408328Open ↗
04/20/2017421453135Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/24/2017440408328Open ↗
08/18/2015440245192Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/24/2017440408328Open ↗
08/18/2015440245192Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
07/17/2019421738999Open ↗
06/27/2019421738999Open ↗
06/08/2019421738999Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING1
05/24/2017440408328Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes5
05/02/2019421738999Open ↗
10/23/2018421669126Open ↗
04/20/2017421453135Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00557000-I1Open ↗
08/13/2026Q00557000-P1Open ↗
08/13/2026Q00557000-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
01/24/2017421344860Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00557000-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00591171-I1Open ↗
08/20/2026Q01203500-I1Open ↗
08/13/2026Q00757156-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
05/02/2019421738999Open ↗
01/18/2019421669126Open ↗
01/18/2019421669126Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/23/2015421231321Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
08/01/2019421738999Open ↗
05/17/2019421738999Open ↗
11/10/2018440408328Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/18/2023421231321Open ↗
08/01/2019421738999Open ↗
01/26/2019421669126Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/24/2017440408328Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/16/2023421231321Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00557000-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/07/2023420371476Open ↗
08/07/2023420371476Open ↗
09/23/2022440245192Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/21/2023421231321Open ↗
08/08/2023420371476Open ↗
09/27/2022440245192Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
05/02/2019421738999Open ↗
11/30/2018440245192Open ↗
08/16/2018421231321Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
04/20/2017421453135Open ↗
10/23/2015421231321Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
02/16/2017421344860Open ↗
01/24/2017421344860Open ↗
▸BISFINAL2
08/07/2023420371476Open ↗
06/16/2023421231321Open ↗
▸BISSHED LETTER2
08/21/2017440245192Open ↗
08/23/2016440245192Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT16
08/01/2019421738999Open ↗
05/02/2019421738999Open ↗
01/26/2019421669126Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/07/2023420371476Open ↗
06/13/2023421231321Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET9
05/02/2019421738999Open ↗
09/17/2018421669126Open ↗
04/20/2017421453135Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
07/17/2019421738999Open ↗
03/16/2018421353430Open ↗
08/24/2017421453135Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
01/22/2019421453135Open ↗
10/27/2018421453135Open ↗
09/25/2018421453135Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/24/2017440408328Open ↗
08/18/2015440245192Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM1
04/27/2017421344860Open ↗
▸BISDHCR DOCUMENT1
09/27/2022440245192Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/03/2015440245192Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01219934-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00557000-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01219934-I1Open ↗