BuildNYC
Elevator apt, miscellaneous
Catherine Sheridan Apts
31-41 23RD STREET · BIN 4006620
💬 Discuss this project
1979Year Built
11Stories
D9Building Class
R6BZoning
202,800 sfGross Floor Area
241Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator apt, miscellaneous · Owner of record: Catherin Sheridan Housing Development Fund Co · 47,600 sf lot · 4.26 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsLivonia C3 HDFC2 filings
RoofLivonia C3 HDFC1p · 2 filings · 11 docs
Floor 11Unit 11B, Unit 11N
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Temporary pipe scaffold installation1p · 2 filings · 18 docs
CellarLivonia C3 HDFC1p · 1 filing · 5 docs
Site & exteriorFacade repairs5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Catherine Sheridan HDFC2503/22/2026
Livonia C3 HDFC807/04/2026
CC Pop Development503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James Stout Architect & Associates106/17/2025
Mje Professional Services106/11/2025
Rosenthal510/30/2024
C2B Architects111/29/2023
Paul Perdek, Prof. Engineering408/22/2023
Eskw/A206/21/2023
Gregory V. Perotto, P.E206/10/2021
Dattner Architects109/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service1203/21/2026
Betro Design Group703/21/2026
Perotto Group403/21/2026
SNR Expediting Design203/21/2026
Bay Ridge Buildings Consulting103/21/2026
Sunkeeper Solar Electric203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold1207/08/2026
MDG Design & ConstructionGeneral Contractor207/08/2026
Sunkeeper Solar Electricspecialty_contractor207/04/2026
ZDGScaffold203/21/2026
Ips PlumbingPlumbing207/08/2026
Central Air Conditioningspecialty_contractor207/08/2026
View 360 ConstructionGeneral Contractor107/08/2026
Romcon ElectricElectrical103/22/2026
Amr Electrical ContractingElectrical103/22/2026
A & H InstallationScaffold104/09/2026
Reliable EnterprisesScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James J Stout Architects5913106/17/2025
DNA Controlled Inspection554410/30/2024
Leo Y Lee Associates2481204/12/2024
Socotec Engineering4983412/27/2023
Gregory V. Perotto, P.E947206/10/2021
Building Lifecycle
All (162)Filed (19)Permit Issued (21)Signed Off (12)Facade (FISP) (13)Violation (60)Inspection (3)Objection (4)Special Inspection (30)
07/17/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
Q01240038-I1
06/01/2026
Permit issued — Solar
Q01240038-I1-SL
02/20/2026
Violation issued (HPD, closed)
B
01/14/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01239351-I1
09/24/2025
Permit issued — Supported Scaffold
Q01239351-I1-SF
06/27/2025
Permit issued — Solar
Q01240038-I1-SL
06/17/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
Q01240038-I1
06/12/2025
Permit issued — Supported Scaffold
Q01239351-I1-SF
06/12/2025
Special inspection requirement — Maintenance information
JAMES J STOUT
06/12/2025
Special inspection requirement — Post-installed Anchors
JAMES J STOUT
06/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01239351-I1
06/11/2025
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
06/11/2025
Special inspection requirement — Final
JAMES J STOUT
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
11/26/2024
Signed off — Alteration
REMOVE & INSTALL NEW WINDOWS, EXTERIOR DOOR & STOREFRONT, DOORS FOR ADA BATHRROMS & CLOSETS. REPAIR & REBUILD AREAS OF CRACKED BRICK MASONRY PARAPETS, INSTALL HANDRAILS AT PERIMETER OF STAIRWELL BULKHEADS & PARAPETS AND SITEWORK AS PER PLANS FILED
Q00545781-I1
11/26/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM AND ASSOCIATED DUCT & PIPING SYSTEM FOR PARTIAL FIRST FLOOR COMMUNITY ROOMS, REPLACEMENT OF A/C SLEEVES ON ALL FLOORS AS PER PLANS FILED
Q00743950-I1
11/25/2024
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00892110-I1
11/25/2024
Signed off — Alteration
Q00892112-I1
11/22/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00886013-I1
11/21/2024
Signed off — Alteration
REMOVE AND INSTALL NEW PLUMBING FIXTRUES TO ALL BATHROOMS FROM FLOORS 1 THRU 11 AS PER PLANS FILED.
Q00498927-I1
11/19/2024
Special inspection requirement — Shutoff dampers
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — Final
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — Mechanical Systems
WILLIAM FITZJOHN
11/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
10/30/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM AND ASSOCIATED DUCT & PIPING SYSTEM FOR PARTIAL FIRST FLOOR COMMUNITY ROOMS, REPLACEMENT OF A/C SLEEVES ON ALL FLOORS AS PER PLANS FILED
Q00743950-P1
10/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — Mechanical Systems
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — Maintenance information
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — Final
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — Shutoff dampers
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — Energy Code Compliance Inspections
10/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM FITZJOHN
10/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM FITZJOHN
10/16/2024
Signed off — Alteration
CD-5: SUSPENDED SCAFFOLDING FOR FACADE REPAIRS, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030131-I1
09/23/2024
Signed off — Alteration
APPLICATION FOR FACADE REPAIRS AS PER PLANS HERE WITH IN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00938646-I1
09/22/2024
Cycle 9 facade report submitted
09/19/2024
Cycle 9 facade report signed — SAFE
08/27/2024
Cycle 9 facade inspection completed
06/06/2024
Violation issued (HPD, closed)
C
05/31/2024
Permit issued — General Construction
Q00545781-I1-GC
05/03/2024
Permit issued — Suspended Scaffold
Q01030131-P1-SC
05/03/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
05/03/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
05/02/2024
Objection resolved — Addressed
04/29/2024
Objection raised — Other
04/12/2024
Filed — Alteration
CD-5: SUSPENDED SCAFFOLDING FOR FACADE REPAIRS, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030131-P1
04/12/2024
Permit issued — General Construction
Q00938646-I1-GC
04/09/2024
Permit issued — Suspended Scaffold
Q01030131-I1-SC
04/09/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
04/09/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/05/2024
Filed — Alteration
CD-5: SUSPENDED SCAFFOLDING FOR FACADE REPAIRS, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030131-I1
03/22/2024
Permit issued — Mechanical Systems
Q00743950-I1-MS
03/13/2024
Permit issued — Plumbing
Q00498927-I1-PL
03/04/2024
Permit issued — Sidewalk Shed
Q00886013-I1-SH
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunkeeper Solar Electric06/01/2026
DOB NOWSupported ScaffoldSigned-offA H Installation09/24/2025
DOB NOWSolarSigned-offSunkeeper Solar Electric06/27/2025
DOB NOWSupported ScaffoldSigned-offReliable Enterprises06/12/2025
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction05/31/2024
DOB NOWSuspended ScaffoldPermit IssuedMC Superstructure05/03/2024
DOB NOWGeneral ConstructionSigned-offView 360 Construction04/12/2024
DOB NOWSuspended ScaffoldSigned-offMC Superstructure04/09/2024
DOB NOWMechanical SystemsSigned-offCentral Air Conditioning03/22/2024
DOB NOWPlumbingSigned-offIps Plumbing03/13/2024
DOB NOWSidewalk ShedSigned-offYarks NYC03/04/2024
DOB NOWConstruction FenceSigned-offYarks NYC03/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offYarks NYC03/04/2024
DOB NOWMechanical SystemsSigned-offCentral Air Conditioning08/30/2023
DOB NOWSidewalk ShedSigned-offYarks NYC06/29/2023
DOB NOWConstruction FenceSigned-offYarks NYC06/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offYarks NYC06/28/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction06/08/2023
DOB NOWPlumbingSigned-offIps Plumbing03/21/2023
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum11/02/2020
DOB NOWConstruction FenceSigned-offZDG09/04/2020
BISOTISSUEDEast Coast Petroleum11/17/2020
BISOTISSUEDZDG08/04/2020
BIS—ISSUEDCatherine Sheridan HDFC06/25/2020
BISSPISSUEDPace Plumbing01/11/2019
BISMHISSUEDAllied Construction and D10/16/2018
BISPLISSUEDPace Plumbing10/03/2018
BISOTISSUEDAllied Construction and D09/14/2018
BISMHISSUEDAllied Construction and D09/14/2018
BISPLISSUEDMaxwell Plumbing Mechanical08/06/2013
BISFSISSUEDRB Heating Consulting Group08/06/2013
BISOTISSUEDAdvanced Chimney08/02/2013
BISOTISSUEDQuattro Construction Management04/12/2011
BISOTISSUEDQuattro Construction Management09/03/2010
BISEQISSUEDQuattro Construction Management09/03/2010
BISOTISSUEDQuattro Construction Management08/17/2010
BISEQISSUEDQuattro Construction Management08/17/2010
BISOTISSUEDAdelphi Restoration03/11/2009
BISFBISSUEDA&C Heating Services09/23/2008
BISEQISSUEDEverest Scaffolding04/30/2008
+ 3 more permits on file
7 projects · most recent 12/22/2025
General Wiring Lighting
FiledStatusContractorScope
12/22/2025CompleteSunkeeper Solar—
01/15/2025Permit IssuedTuxedo Electrical Contracting—
09/02/2023CompleteRichard Neu—
07/11/2023CompleteKTB ElectricGeneral Wiring
02/26/2021CompleteRomcon Electric—
01/07/2021CompleteRomcon ElectricGeneral Wiring
02/04/2019Permit IssuedAmr Electrical ContractingGeneral Wiring, Lighting
1 project · most recent 06/17/2025
FiledStatusContractorScope
06/17/2025Signed-offSunkeeper Solar Electric194 panels, 102.8 kw, 16,800 roof_area_sqft
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
06/12/2025Maintenance informationJAMES J STOUTenergy_progress
06/12/2025Post-installed AnchorsJAMES J STOUTspecial
06/11/2025Air barrier - visual inspectionJAMES J STOUTenergy_progress
06/11/2025Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
06/11/2025Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
06/11/2025Energy Code Compliance InspectionsJAMES J STOUTprogress
06/11/2025FinalJAMES J STOUTprogress
11/19/2024Mechanical SystemsWILLIAM FITZJOHNspecial
11/19/2024Energy Code Compliance InspectionsWILLIAM FITZJOHNprogress
11/19/2024HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
11/19/2024HVAC-R and service water heating equipmentWILLIAM FITZJOHNenergy_progress
11/19/2024Shutoff dampersWILLIAM FITZJOHNenergy_progress
11/19/2024HVAC-R and service water heating system controlsWILLIAM FITZJOHNenergy_progress
11/19/2024Maintenance informationWILLIAM FITZJOHNenergy_progress
11/19/2024FinalWILLIAM FITZJOHNprogress
10/28/2024Maintenance informationWILLIAM FITZJOHNenergy_progress
10/28/2024Mechanical SystemsWILLIAM FITZJOHNspecial
10/28/2024FinalWILLIAM FITZJOHNprogress
10/28/2024Energy Code Compliance Inspections—progress
10/28/2024HVAC-R and service water heating system controlsWILLIAM FITZJOHNenergy_progress
10/28/2024HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
10/28/2024Shutoff dampersWILLIAM FITZJOHNenergy_progress
10/28/2024HVAC-R and service water heating equipmentWILLIAM FITZJOHNenergy_progress
05/03/2024Post-installed AnchorsLeo Leespecial
05/03/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
Latest 25 of 61.
▾Documents — 344 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/27/2026Q00545781-P1Request digital key ↗
08/25/2026Q00743950-I1Request digital key ↗
08/25/2026Q00743950-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/27/2026Q00408360-I1Request digital key ↗
08/15/2026Q00408360-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00391505-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION26
04/21/2023420665391Open ↗
04/18/2023420665391Open ↗
03/23/2023420665391Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION21
11/17/2020440634690Open ↗
08/04/2020440591637Open ↗
06/25/2020420665391Open ↗
Showing 3 of 21 on file for this type
▸BISPLACE OF ASSEMBLY5
07/23/2013410137908Open ↗
07/23/2013420180681Open ↗
04/29/2010420180681Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
06/05/2020440591637Open ↗
06/07/2019420665391Open ↗
06/07/2019420665391Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
06/17/2013420243258Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
08/20/2012420180681Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/11/2021420665391Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
07/05/2019420665391Open ↗
▸Seals & Professional Certifications97
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
08/20/2019421638918Open ↗
08/20/2019421638918Open ↗
05/28/2019421638918Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026Q00408360-I1Open ↗
09/23/2026Q00408360-I1Open ↗
09/23/2026Q00408360-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026Q00408360-I1Open ↗
09/01/2026Q00545781-P1Open ↗
09/01/2026Q00545781-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00391505-I1Open ↗
08/27/2026Q00408360-P1Open ↗
08/27/2026Q00408360-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/05/2018421638918Open ↗
08/17/2013420876626Open ↗
08/08/2013420869527Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/17/2013420876626Open ↗
08/08/2013420869527Open ↗
08/16/2010420243258Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/30/2020440634690Open ↗
06/05/2018421638918Open ↗
06/05/2018421638918Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/24/2020440591637Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/30/2020440634690Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/05/2018421638918Open ↗
06/04/2018421638909Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/12/2011420232643Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/17/2013420876626Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/19/2014420876626Open ↗
▸BISSCHEDULE B - PLUMBING1
08/17/2013420876626Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/20/2019421638918Open ↗
▸BISEQUIPMENT USE PERMITS1
08/20/2019421638918Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES4
10/30/2020440634690Open ↗
04/24/2020440591637Open ↗
11/28/2018421638909Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
06/05/2020440591637Open ↗
07/02/2019420665391Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026Q00408360-I1Open ↗
08/13/2026Q00408360-P1Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026Q00408360-P1Open ↗
08/27/2026Q00408360-I1Open ↗
08/27/2026Q00545781-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT6
09/07/2010420232643Open ↗
09/07/2010420232643Open ↗
09/07/2010420232643Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/30/2020440634690Open ↗
11/28/2018421638909Open ↗
08/17/2013420876626Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/29/2010420180681Open ↗
Showing 1 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/08/2013420869527Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/28/2019421638918Open ↗
10/16/2018421638918Open ↗
06/05/2018421638918Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/07/2021440634690Open ↗
05/28/2019421638918Open ↗
05/19/2016420876626Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/30/2020440634690Open ↗
04/24/2020440591637Open ↗
06/07/2019420665391Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/08/2013420869527Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/31/2021440591637Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00545781-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/07/2021440634690Open ↗
11/17/2020440634690Open ↗
10/30/2020440634690Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs52
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/25/2026Q00743950-I1Open ↗
08/24/2026Q00892112-I1Open ↗
08/13/2026Q00886013-I1Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
07/07/2021440634690Open ↗
03/31/2021440591637Open ↗
08/20/2019421638918Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/19/2016420876626Open ↗
09/09/2013420869527Open ↗
08/08/2013420869527Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
08/17/2013420876626Open ↗
08/08/2013420869527Open ↗
09/03/2010420232643Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/23/2021420665391Open ↗
06/09/2021420665391Open ↗
06/05/2019420665391Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
03/31/2021440591637Open ↗
▸BISBSA/CPC APPROVAL1
06/07/2019420665391Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026Q01240038-I1Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT22
07/07/2021440634690Open ↗
10/30/2020440634690Open ↗
04/24/2020440591637Open ↗
Showing 3 of 22 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/03/2021420665391Open ↗
03/31/2021440591637Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
08/26/2010420243258Open ↗
08/26/2010420243258Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION11
07/06/2021440634690Open ↗
07/01/2021420665391Open ↗
06/05/2020440591637Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
06/05/2018421638918Open ↗
06/05/2018421638918Open ↗
06/04/2018421638909Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/30/2020440634690Open ↗
04/24/2020440591637Open ↗
▸BISBOROUGH INTAKE FORM2
05/11/2020420665391Open ↗
06/10/2019421638918Open ↗
▸Other Documents7
▸DOB NOWCalculations2
08/13/2026Q01030131-P1Open ↗
08/13/2026Q01030131-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01030131-P1Open ↗
08/13/2026Q01030131-I1Open ↗
▸BISPLOT DIAGRAM1
06/07/2019420665391Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/05/2020440591637Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026Q00892110-P1Open ↗