← Back
Elevator cooperative
31 WEST 31 STREET
MANHATTAN · BIN 1015808
💬 Discuss this project
1905Year Built
11Stories
D4Building Class
C6-4Zoning
32,032 sfGross Floor Area
11Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: HERALD SQUARE LOFT CORP · 3,240 sf lot · 9.89 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP LLC1103/22/2026
EMPIRE SCAFFOLDING SYSTEM103/22/2026
HAROLD SQUARE LOFT CORP103/22/2026
BIG CITY MANAGEMENT INC103/22/2026
JOVIL CONTRACTING203/22/2026
VILES CONTRACTING403/21/2026
C O BIG CITY MANAGEMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RESTRUCTURE ENGINEERING, PLLC102/12/2026
LAWLESS AND MANGIONE208/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTHONY LUCIANOElectrical303/21/2026
ENER-CON TECHNICAL SERVICGeneral Contractor303/21/2026
XINOS CONSTRUCTION CORPGeneral Contractor203/21/2026
MICHAEL MINIEROElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
SABRINO GIORLANDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688302/12/2026
Building Lifecycle
All (75)Filed (3)Permit Issued (2)Signed Off (2)Facade (FISP) (12)Violation (48)Special Inspection (8)
02/12/2026
Filed — Alteration
M01350775-I1
04/23/2025
Signed off — Alteration
Installation of a split-system to cool the elevator machine room.
M01092815-I1
02/25/2025
Signed off — Alteration
Filing for new Machine room platform at Passenger elevator as per plans filed herewith. No change in use occupancy or egress.
M01067815-I1
09/06/2024
Permit issued — General Construction
M01092815-I1-GC-CX
08/15/2024
Filed — Alteration
Installation of a split-system to cool the elevator machine room.
M01092815-I1
07/26/2024
Permit issued — Structural
M01067815-I1-ST
07/10/2024
Filed — Alteration
Filing for new Machine room platform at Passenger elevator as per plans filed herewith. No change in use occupancy or egress.
M01067815-I1
07/08/2024
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
06/17/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
02/07/2024
Cycle 9 facade report submitted
02/07/2024
Cycle 9 facade report signed — SAFE
02/06/2024
Cycle 9 facade inspection completed
12/17/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/18/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/21/2018
Cycle 8 facade report submitted
12/15/2018
Cycle 8 facade report signed — SAFE
12/04/2018
Cycle 8 facade inspection completed
08/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/24/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2014
Cycle 7 facade report submitted
03/31/2014
Cycle 7 facade report signed — SAFE
03/28/2014
Cycle 7 facade inspection completed
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/14/2011
Violation issued (ECB, closed)
Boilers
05/21/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/03/2009
Violation issued (ECB, closed)
Construction
10/03/2009
Violation issued (ECB, closed)
Construction
11/14/2008
Violation issued (ECB, closed)
Construction
11/14/2008
Violation issued (ECB, closed)
Construction
11/14/2008
Violation issued (ECB, closed)
Construction
06/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/08/2007
Cycle 6 facade report submitted
01/23/2007
Cycle 6 facade report signed — SWARMP
06/19/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2006
Violation issued (ECB, closed)
Construction
04/21/2006
Cycle 6 facade inspection completed
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENER-CON TECHNICAL SERVIC09/06/2024
DOB NOWStructuralSigned-offXINOS CONSTRUCTION CORP07/26/2024
BISSPISSUEDORBIT SPRINKLER CORP01/16/2018
BISPLISSUEDORBIT PLBG & HTG INC12/26/2017
BISMHISSUEDNU-WAY HEATING & COOLING12/21/2017
BISOTISSUEDJOZEF ZYGMUNT12/20/2017
BISOTISSUEDBRAS AL CONSTRUCTION CORP09/19/2011
BISBLISSUEDDEMAR PLUMBING CORP09/19/2011
BISEQISSUEDJOVIL CONTRACTING CORP08/31/2009
BISEQISSUEDJOVIL CONTRACTING CORP11/14/2008
BISEQISSUEDJOVIL CONTRACTING CORP06/20/2008
BISOTISSUEDVILES CONTRACTING CORP06/16/2008
BISEQISSUEDJOVIL CONTRACTING CORP06/09/2008
BISOTISSUEDNOVA RESTORATIONS INC10/03/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM02/21/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/09/2004
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM10/10/2003
BISEQRE-ISSUEDEMPIRE SCAFFOLDING SYSTEM01/24/2003
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEMS INC09/18/2002
BISOTISSUEDJADE SCAFFOLDING CORP.07/18/2002
BISPLRE-ISSUEDENA PLUMBING CORP08/16/2001
BISMHISSUEDWON DAK INC07/02/1998
BISOTISSUEDWON DAK INC06/23/1998
BISPLISSUEDMAINLAND PLUMBING & HEATING,INC.05/19/1998
BISMHISSUEDWON DAK INC05/05/1998
BISOTISSUEDFPC CONSTRUCTION CORPORATION10/31/1996
BISOTISSUEDRUSSELL AND CONNIE PEACOCK12/04/1995
BISPLISSUEDREEM PLBG & HTG CORP01/19/1995
BISMHISSUEDRUSSELL AND CONNIE PEACOCK10/07/1994
BISOTISSUEDDESIGN 31 CORP09/07/1994
5 projects · most recent 03/28/2026
General Wiring
FiledStatusContractorScope
03/28/2026CompleteJ.A. LEE ELEC SVCS LLC—
01/08/2025CompleteJAM ELECTRICAL CORP—
11/28/2023Permit IssuedELECTL CONTG SOLUTIONS COGeneral Wiring
08/29/2021Permit IssuedROBERT CHIMENTI11 meters, 1 new_meters
12/07/2017CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/08/2024Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026M01067815-I1Request digital key ↗
08/26/2026M01092815-I1Request digital key ↗
08/19/2026M01350775-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION12
01/16/2018123114851Open ↗
12/27/2017123114842Open ↗
12/22/2017123114842Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
04/19/2018123114842Open ↗
11/15/2017123114851Open ↗
11/14/2017123114842Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
08/03/2018123114842Open ↗
08/03/2018123114842Open ↗
08/01/2018123114851Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M01350775-I1Open ↗
08/13/2026M01092815-I1Open ↗
08/13/2026M01067815-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M01067815-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M01067815-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/15/2017123114851Open ↗
11/14/2017123114842Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/02/2011120707235Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
11/15/2017123114851Open ↗
11/14/2017123114842Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/14/2017123114842Open ↗
▸Environmental & Asbestos12
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
06/02/2011120707235Open ↗
06/02/2011120707235Open ↗
06/02/2011120707235Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/30/2008110174506Open ↗
05/02/2008110193157Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/15/2017123114851Open ↗
11/14/2017123114842Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01092815-I1Open ↗
08/13/2026M01067815-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/03/2018123114842Open ↗
08/03/2018123114842Open ↗
11/14/2017123114842Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/03/2018123114842Open ↗
08/03/2018123114842Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/13/2011120707235Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
06/02/2011120707235Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/20/2018123114842Open ↗
08/03/2018123114842Open ↗
08/01/2018123114851Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/04/2018123114851Open ↗
08/11/2017103202124Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/20/2008110174506Open ↗
01/08/2008110042338Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/03/2018123114842Open ↗
08/01/2018123114851Open ↗
11/15/2017123114851Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET6
11/15/2017123114851Open ↗
11/14/2017123114842Open ↗
11/14/2017123114842Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
08/20/2018123114842Open ↗
08/03/2018123114842Open ↗
08/01/2018123114851Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
04/26/2018123114842Open ↗
12/11/2017123114842Open ↗
12/05/2017123114851Open ↗