| Owner | Filings | Most Recent |
|---|---|---|
| 40 West 53rd Associates LP Paramoun | 433 | 03/21/2026 |
| Deutsche Bank | 201 | 03/21/2026 |
| 40 West 53rd Associates | 200 | 07/08/2026 |
| 40 West 53rd Street Associates | 66 | 03/21/2026 |
| Paramount Group | 46 | 07/08/2026 |
| 40 West 53 Street Partnership | 23 | 03/21/2026 |
| 40 West 53 St | 18 | 03/21/2026 |
| 40 W 53 St Associates | 17 | 03/21/2026 |
| 53rd St Partners | 9 | 03/21/2026 |
| 450 Lexington Venture | 9 | 03/21/2026 |
| Hines Interest | 5 | 03/21/2026 |
| 40 W 52 WT | 3 | 03/21/2026 |
| Hines | 2 | 03/21/2026 |
| Wharton Properties | 1 | 03/22/2026 |
| Museum of Arts Design | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Loffredo Brooks Architects | 11 | 06/29/2026 |
| Perkins and Will | 2 | 06/29/2026 |
| Severud Associates | 1 | 02/24/2026 |
| Robert Derector Associates | 4 | 02/23/2026 |
| HYL Architecture | 6 | 02/06/2026 |
| CFS Engineering | 20 | 01/29/2026 |
| SSM Design LLP D/B/A Spector Group | 1 | 01/22/2026 |
| AMA Consulting Engineers | 33 | 11/24/2025 |
| Fogarty Finger Architecture | 2 | 10/10/2025 |
| The Eipel Engineering Group | 1 | 05/06/2025 |
| Avcon Engineering | 3 | 05/02/2025 |
| HBC Architects | 1 | 05/02/2025 |
| Office of James Ruderman | 7 | 03/19/2025 |
| Abs Engineering | 2 | 07/03/2024 |
| Design Republic | 1 | 06/26/2024 |
| Tohfaz Uddin PE | 7 | 05/24/2024 |
| Bacon Lane Architect | 1 | 10/30/2023 |
| MG Engineering | 8 | 03/07/2023 |
| TPG Architecture | 4 | 12/13/2022 |
| Urban Integrations | 1 | 09/19/2022 |
| Ware Malcomb | 4 | 04/25/2022 |
| Safway Atlantic | 5 | 12/22/2021 |
| Gensler | 3 | 11/18/2021 |
| Thornton Tomasetti | 1 | 08/05/2021 |
| Plan B Engineering | 3 | 07/28/2021 |
| Fiskaa Engineering | 1 | 10/30/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 86 | 03/21/2026 |
| A1 Expediting Service | 14 | 03/21/2026 |
| Eurocelt Expediting | 6 | 03/21/2026 |
| Milrose Consultants | 33 | 03/21/2026 |
| Spring Scaffolding | 10 | 03/21/2026 |
| Synergy Building Consultants | 2 | 03/21/2026 |
| Municipal Building Consultants | 1 | 03/21/2026 |
| PDG Building Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Americon Construction | General Contractor | 17 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 15 | 07/08/2026 |
| Safway Atlantic | Scaffold | 15 | 07/08/2026 |
| Icon Interiors | General Contractor | 14 | 10/04/2026 |
| Structure Tone | General Contractor | 10 | 07/08/2026 |
| Phase 3 Interiors | General Contractor | 10 | 07/08/2026 |
| Benchmark Builders | General Contractor | 10 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 9 | 07/08/2026 |
| Gannon Contracting | General Contractor | 9 | 07/08/2026 |
| L&K Partners | General Contractor | 7 | 04/09/2026 |
| Cross Management | General Contractor | 5 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 5 | 07/08/2026 |
| Harbor Restoration Services | specialty_contractor | 4 | 04/09/2026 |
| Par Plumbing Co | Plumbing | 4 | 07/08/2026 |
| Platform Solutions | Scaffold | 4 | 07/08/2026 |
| 4IR Ideal | General Contractor | 4 | 07/08/2026 |
| Empire Ecs | General Contractor | 4 | 07/08/2026 |
| Aggressive Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Adco Electrical | Electrical | 3 | 03/22/2026 |
| Tristate Plumbing Services | Plumbing | 3 | 07/08/2026 |
| A&A Plumbing | Plumbing | 3 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 2 | 06/28/2026 |
| Difazio Electric NY | Electrical | 2 | 03/22/2026 |
| Winick Productions | General Contractor | 2 | 03/21/2026 |
| A & E Plumbing | Plumbing | 2 | 07/08/2026 |
| A&H Express Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 2 | 07/08/2026 |
| Preferred Mechanical | Plumbing | 2 | 07/08/2026 |
| PSI Partners | Fire Protection | 2 | 07/08/2026 |
| Statewide Electrical | Electrical | 2 | 03/21/2026 |
| JRD Electric | Electrical | 1 | 03/21/2026 |
| Tuxedo Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Blake Electric Contracting Co., I | Electrical | 1 | 03/21/2026 |
| Ecny Electrical Contractors | Electrical | 1 | 03/22/2026 |
| Preferred Piping | Plumbing | 1 | 07/08/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 06/28/2026 |
| Ethos Plumbing | Plumbing | 1 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| New Era Mechanical Service | Fire Protection | 1 | 07/08/2026 |
| Orbit Sprinkler | Fire Protection | 1 | 10/04/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Campbell & Dawes Ltd Electric | Electrical | 1 | 03/22/2026 |
| Transform Electl Contractors I | Electrical | 1 | 03/22/2026 |
| Spieler & Ricca Electrical Co | Electrical | 1 | 03/21/2026 |
| PFL Mechanical | Plumbing | 1 | 07/08/2026 |
| Scala, Jr., Anthony | Electrical | 1 | 03/21/2026 |
| Robert B. Samuels | Electrical | 1 | 03/22/2026 |
| Mazzancello Mark | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Codegreen | 510 | 16 | 06/29/2026 |
| Alan Margolin & Associates | 423 | 20 | 01/29/2026 |
| AK Engineering | 678 | 16 | 09/19/2025 |
| Domani Inspection Service | 843 | 4 | 05/06/2025 |
| Milrose Consultants | 2003 | 18 | 08/28/2024 |
| KZ Engineering | 4665 | 2 | 06/04/2024 |
| Special Inspection Services | 1200 | 19 | 12/11/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | Preferred Mechanical | 03/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 03/11/2026 |
| DOB NOW | Structural | Permit Issued | Structure Tone | 03/05/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 03/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 02/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mora Fire Protection | 02/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Icon Interiors | 02/06/2026 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 02/06/2026 |
| DOB NOW | General Construction | Permit Issued | Icon Interiors | 01/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | New Era Mechanical Service | 12/17/2025 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 12/03/2025 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 12/01/2025 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 12/01/2025 |
| DOB NOW | Standpipe | Permit Issued | Bedrock Mechanical | 12/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 11/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Harbor Restoration Services | 11/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Icon Interiors | 11/07/2025 |
| DOB NOW | Plumbing | Signed-off | Preferred Piping | 11/07/2025 |
| DOB NOW | General Construction | Permit Issued | Icon Interiors | 11/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | Aggressive Fire Protection | 10/20/2025 |
| DOB NOW | Plumbing | Signed-off | A & E Plumbing | 10/14/2025 |
| DOB NOW | Structural | Signed-off | Empire Ecs | 10/08/2025 |
| DOB NOW | General Construction | Signed-off | Empire Ecs | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | Empire Ecs | 09/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Empire Ecs | 08/06/2025 |
| DOB NOW | Plumbing | Signed-off | Ethos Plumbing | 07/10/2025 |
| DOB NOW | Standpipe | Permit Issued | Full Capacity Fire | 06/05/2025 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 06/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K Partners | 06/05/2025 |
| DOB NOW | General Construction | Permit Issued | L&K Partners | 06/05/2025 |
| DOB NOW | Plumbing | Permit Issued | William C. Gerakaris P&H | 06/05/2025 |
| DOB NOW | Plumbing | Signed-off | PFL Mechanical | 06/04/2025 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 05/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 05/28/2025 |
| DOB NOW | General Construction | Permit Issued | Americon Construction | 05/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 05/08/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 05/07/2025 |
| DOB NOW | General Construction | Permit Issued | Phase 3 Interiors | 05/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | Mora Fire Protection | 04/08/2025 |
| DOB NOW | Structural | Signed-off | L&K Partners | 03/25/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/23/2026 | Permit Issued | Structure Tone | Air Conditioning Systems | Cooling Climatemaster Climate Master - SC-036 3 tons · Wshp ×4 Climate Master - SC-012 1 tons · Wshp ×1 Climate Master - SC-018 600 CFM · Wshp ×1 Climate Master - SC-024 2 tons · Wshp ×1 Above Air Above Air - SCW-007 2 tons · Wshp ×6 |
| 01/29/2026 | Permit Issued | Icon Interiors | Air Conditioning Systems | Cooling Water Furnace V5AH009 10,470 BTU · Packaged Unit ×4 V5AH024 24,770 BTU · Packaged Unit ×1 V5AH036 36,700 BTU · Wshp ×1 Liebert RTMT060Evapx1/MTC69W 65,500 BTU ×1 |
| 11/24/2025 | Signed-off | Structure Tone | Heating and Air Conditioning Systems | Heat / Cool Florida Heat Pump CA012 460 CFM · Wshp ×2 CL012 460 CFM · Wshp ×2 CL024 880 CFM · Wshp ×2 CL030 950 CFM · Wshp ×2 |
| 07/29/2025 | Signed-off | Americon Construction | Air Conditioning Systems | Cooling Trane Trane - GEHG0247 2 tons · Wshp ×4 Trace - GEHG0247 2 tons · Wshp ×2 Trane - GEHG0307 2 tons · Wshp ×2 |
| 06/02/2025 | Permit Issued | L&K Partners | Air Conditioning Systems | Cooling Water Furnace V5AH018BR2AG4DERBENB212SSS 640 CFM · Wshp ×1 V5AH060BSAG4DERBENE212SSS 5 tons · Wshp ×1 V5AH072BS4AG4DERBENE212SSS 6 tons · Wshp ×1 Liebert DME037E 3 tons · Wshp ×1 Trane V5AH02BS4AG4DERBENB212SSS 2 tons · Wshp ×1 |
| 05/02/2025 | Signed-off | Empire Ecs | Heating and Air Conditioning Systems | Heat / Cool |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/23/2026 | Permit Issued | Abco-Peerless Sprinkler | — |
| 01/29/2026 | Permit Issued | PSI Partners | 170 heads |
| 10/02/2025 | Permit Issued | Aggressive Fire Protection | 51 heads |
| 06/02/2025 | Permit Issued | Full Capacity Fire | 291 heads, 1 outlets |
| 05/02/2025 | Permit Issued | New Era Mechanical Service | 44 heads |
| 04/29/2025 | — | — | 231 heads |
| 03/24/2025 | Permit Issued | PSI Partners | 212 heads |
| 10/30/2019 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/23/2026 | Permit Issued | Preferred Mechanical | Water/Sanitary |
| 01/29/2026 | Signed-off | A&A Plumbing | Water/Sanitary |
| 10/10/2025 | Signed-off | A&A Plumbing | Water/Sanitary |
| 10/02/2025 | — | — | — |
| 06/02/2025 | Permit Issued | William C. Gerakaris P&H | Water/Sanitary |
| 05/21/2025 | Signed-off | PFL Mechanical | Water/Sanitary |
| 04/29/2025 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/24/2025 | — | — | Water/Sanitary |
| 07/03/2024 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 10/30/2019 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | Permit Issued | Polo Electric Corp D/B/A | General Wiring |
| 07/21/2026 | Complete | Forest Electric | General Wiring |
| 04/21/2026 | Permit Issued | Ecny Electrical Contractors | General Wiring |
| 04/16/2026 | Permit Issued | Allran Electric of NY | General Wiring |
| 02/19/2026 | Permit Issued | Polo Electric Corp D/B/A | General Wiring |
| 01/21/2026 | Permit Issued | Campbell & Dawes Ltd Electric | General Wiring |
| 11/17/2025 | Complete | Ecny Electrical Contractors | General Wiring |
| 11/17/2025 | Complete | Ecny Electrical Contractors | General Wiring |
| 11/17/2025 | Complete | Ecny Electrical Contractors | General Wiring |
| 11/14/2025 | Cancelled | Ecny Electrical Contractors | General Wiring |
| 11/14/2025 | Permit Issued | Ecny Electrical Contractors | General Wiring |
| 11/14/2025 | Permit Issued | Ecny Electrical Contractors | General Wiring |
| 11/10/2025 | Cancelled | Nead Electric | General Wiring |
| 11/10/2025 | Complete | Nead Electric | General Wiring |
| 11/10/2025 | Complete | Nead Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/24/2026 | Permit Issued | Structure Tone | Steel |
| 05/06/2025 | Signed-off | Empire Ecs | Steel |
| 03/19/2025 | Signed-off | L&K Partners | Steel, Concrete |
| 05/20/2024 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/10/2021 | Permit Issued | Platform Solutions | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2024 | Permit Issued | Harbor Restoration Services | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/12/2026 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 05/12/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 05/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/22/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/22/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/15/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/23/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/10/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 10/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/08/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/06/2026 | Sprayed fire-resistant materials | HATIM ELSAID | special |
| 07/06/2026 | Final | Frank Loffredo | progress |
| 06/10/2026 | Sprayed fire-resistant materials | James Sullivan Jr | special |
| 06/10/2026 | Fire-Resistance Rated Construction | James Sullivan Jr | progress |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 02/26/2026 | Public Assembly Emergency Lighting | Ari Kamo | progress |
| 02/23/2026 | Maintenance information | HATIM ELSAID | energy_progress |
| 02/23/2026 | Interior lighting power | HATIM ELSAID | energy_progress |
| 02/23/2026 | HVAC-R and service water heating system controls | HATIM ELSAID | energy_progress |
| 02/23/2026 | Shutoff dampers | HATIM ELSAID | energy_progress |
| 02/23/2026 | Metering | HATIM ELSAID | energy_progress |
| 02/23/2026 | Lighting controls | HATIM ELSAID | energy_progress |
| 02/23/2026 | HVAC-R and service water heating equipment | HATIM ELSAID | energy_progress |
| 02/23/2026 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 02/23/2026 | HVAC-R and service water piping design and insulation | HATIM ELSAID | energy_progress |
| 02/17/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 02/17/2026 | Structural Steel - Welding | HATIM ELSAID | special |
| 02/17/2026 | Structural Steel - High Strength Bolting | HATIM ELSAID | special |
| 02/17/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 02/17/2026 | Structural Steel - Details | HATIM ELSAID | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 02/05/2026 | Final | HATIM ELSAID | progress |
| 02/05/2026 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| 02/05/2026 | Final | Frank Loffredo | progress |
| 02/05/2026 | Mechanical Systems | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Cushman & Wakefield | Office | Floors 1, 11–15 | Project M01392175 Project M01355945 Project M01356239 Project M01355960 Project M01355964 |
| Midocean Partners | Office | Floor 10 | Project M01319566 Project M01319577 Project M01319563 |
| Mudrick Capital | Office | Floors 16, 22 | Project M01295681 Project M01292023 Project M01292042 Project M01292058 |
| Centerview Partners | Office | Floors 20–22 | Project M01281479 Project M01281493 Project M01281503 Project M01281526 Project M00627755 Project M00627812 Project M00627834 Project M00627586 Project M00627722 |
| Altaris Capital Partners | Office | Floors 16, 17 | Project M01220695 Project M01220801 Project M01220874 Project M01220939 Project M01193548 Project M01193565 Project M01193528 Project M01193499 Project M01193570 |
| Wilson Sonsini | Office | Floors 5–9 | Project M01182354 Project M01168695 Project M01167607 Project M01168217 Project M01167588 Project M01167643 Project M01167660 Project M01168208 Project M01168234 Project M01168259 Project M01170538 Project M01170607 |
| Farmer J | Restaurant / Food Service | Cellar, Floor 1, Mezzanine | Project M01206632 Project M01203163 Project M01203176 Project M01203183 Project M01203204 |
| WSGR | Office | Floors 5–8 | Project M01040959 Project M01020480 |
| Enel | Office | Floor 24 | Project M00738487 Project M00738489 Project M00738486 |
| Pillsbury | Office | Floors 25, 27, 28 | Project M00565168 Project M00565185 Project M00565146 Project M00361888 Project M00361868 Project M00125106 |
| Bracewell | Office | Floors 18, 19 | Project M00545707 Project M00545742 Project M00546478 Project M00546551 |
| K&LGroup | Office | Floors 2, 9, 18–20 | Project M00512890 Project M00512993 |
| Taco Dumbo | Restaurant / Food Service | Floor 1 | Project M00247663 |