| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01303848 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 10/28/2026 | Design ELECSYS Engineering Group Contractor ECOSYSTEM ENERGY SERVICES Filer AHT ENGINEERING | STRUCTURAL WORK INCLUDING MODIFICATION OF EXISTING DUNNAGE FRAMING FOR HEAT PUMPS AND NEW CONCRETE PAD FOR TRANSFORMER. |
| M00877883 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 05/30/2023 | 06/27/2023 | Design MICHAEL L. PINSKE Contractor A CELL COMMUNICATIONS INC | Installation of DISH telecommunications site on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98. Install (3) … |
| M00437289 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 12/16/2020 | 12/17/2020 | Design SHAABAN ENGINEERING, LLC Contractor NORTH SHORE NEON SIGN CO | Erect non-illuminated banner for museum copy reading museum of arts and design |
| M00437292 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 12/16/2020 | 12/17/2020 | Design SHAABAN ENGINEERING, LLC Contractor NORTH SHORE NEON SIGN CO | Erect non-illuminated wall banner for museum copy reading museum of arts and design |
| M00310213 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 02/05/2020 | 02/06/2020 | Design PATUXENT ENGINEERING LLC Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00074956 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 02/20/2019 | 07/25/2019 | Design MICHAEL L. PINSKE Contractor WATCH HILL WIRELESS SOLU Filer BROOKBRIDGE CONSULTING | INSTALLATION OF ANTENNAS, RRH UNITS, CABLE TRAYS AND EQUIPMENT CABINETS ON ROOF (TMO - NY02554A). ALL WORK IS IN ACCORDANCE WITH TPPN 5/98. … |
| Name | Projects together | Most recent |
|---|---|---|
| Michael L. Pinske | 2 | 11/10/2023 |
| Shaaban Engineering | 2 | 12/16/2020 |
| ELECSYS Engineering Group | 1 | 10/21/2026 |
| Gradient Architecture Studio | 1 | 11/19/2019 |
| Leon Skvirsky PE | 1 | 03/20/2019 |
| Patuxent Engineering | 1 | 02/05/2020 |
| Structure Studio | 1 | 10/21/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| North Shore Neon Sign | 2 | 12/16/2020 |
| A Cell Communications | 1 | 11/10/2023 |
| Ecosystem Energy Services | 1 | 10/21/2026 |
| L.L.G. Plumbing & Heating | 1 | 10/21/2026 |
| Manhattan D Enterprises | 1 | 02/05/2020 |
| N.Y. Sign Art | 1 | 11/19/2019 |
| National Maintenance | 1 | 03/20/2019 |
| Watch Hill Wireless Soluc | 1 | 11/19/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Aht Engineering | 1 | 10/21/2026 |
| Brookbridge Consulting | 1 | 11/19/2020 |
| Building Brothers | 1 | 03/20/2019 |
| Construction Permit Services | 1 | 11/10/2023 |
| Nyccode | 1 | 11/19/2019 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01303848 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 10/28/2026 | Design ELECSYS Engineering Group Contractor ECOSYSTEM ENERGY SERVICES Filer AHT ENGINEERING | STRUCTURAL WORK INCLUDING MODIFICATION OF EXISTING DUNNAGE FRAMING FOR HEAT PUMPS AND NEW CONCRETE PAD FOR TRANSFORMER. |
| M00877883 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 05/30/2023 | 06/27/2023 | Design MICHAEL L. PINSKE Contractor A CELL COMMUNICATIONS INC | Installation of DISH telecommunications site on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98. Install (3) … |
| M00437289 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 12/16/2020 | 12/17/2020 | Design SHAABAN ENGINEERING, LLC Contractor NORTH SHORE NEON SIGN CO | Erect non-illuminated banner for museum copy reading museum of arts and design |
| M00437292 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 12/16/2020 | 12/17/2020 | Design SHAABAN ENGINEERING, LLC Contractor NORTH SHORE NEON SIGN CO | Erect non-illuminated wall banner for museum copy reading museum of arts and design |
| M00310213 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 02/05/2020 | 02/06/2020 | Design PATUXENT ENGINEERING LLC Contractor MANHATTAN D ENTERPRISES | INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. |
| M00074956 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 02/20/2019 | 07/25/2019 | Design MICHAEL L. PINSKE Contractor WATCH HILL WIRELESS SOLU Filer BROOKBRIDGE CONSULTING | INSTALLATION OF ANTENNAS, RRH UNITS, CABLE TRAYS AND EQUIPMENT CABINETS ON ROOF (TMO - NY02554A). ALL WORK IS IN ACCORDANCE WITH TPPN 5/98. … |
| M00127858 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 03/20/2019 | 04/17/2019 | Design LEON SKVIRSKY PE Contractor NATIONAL MAINTENANCE, INC Filer BUILDING BROTHERS INC. | NON-ILLUMINATED BANNER SIGN ON WALL (MUSEUM OF ARTS & DESIGN) |
| M00007906 | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Permit Issued | 04/05/2018 | 04/17/2018 | Design GRADIENT ARCHITECTURE STUDIO Contractor VALLESIGNS & AWNINGS INC Filer NYCCODE LLC | Installation of 2 banners on West and East Facade Elevations of the Building. No change to use, egress or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 2 COLUMBUS CIRCLE ↗ | 14 | 10/20/2026 |