← Back
Walk-up cooperative
31 WEST 69 STREET
MANHATTAN · BIN 1028534
💬 Discuss this project
1896Year Built
4Stories
C6Building Class
R8BZoning
6,944 sfGross Floor Area
10Units
Rent Stabilized3 Open Violations ▸
Walk-up cooperative · Owner of record: SIDMAR PROPERTY CORP · 2,209 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIDMAR PROPERTY CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDWARD F ZEVALLOS ARCHITECT, PC305/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCM CORPORATIONGeneral Contractor204/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDWARD F ZEVALLOS ARCHITE1025205/08/2025
Building Lifecycle
All (35)Filed (3)Permit Issued (3)Signed Off (2)Violation (15)Inspection (3)Objection (8)Special Inspection (1)
04/29/2026
Violation issued (HPD, open)
A
03/13/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01058599-I1
03/12/2026
Signed off — Alteration
Interior renovation on Apt. B. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01058596-I1
02/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2026
Permit issued — General Construction
M01058596-I1-GC
06/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01058599-P1
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
02/07/2025
Permit issued — Plumbing
M01058599-I1-PL
01/15/2025
Permit issued — General Construction
M01058596-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
07/12/2024
Objection raised — Accessibility
07/12/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Other
07/09/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Other
07/09/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Other
07/09/2024
Objection resolved — Addressed
07/03/2024
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01058599-I1
07/03/2024
Filed — Alteration
Interior renovation on Apt. B. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01058596-I1
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/1986
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTCM CORPORATION01/15/2026
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG02/07/2025
DOB NOWGeneral ConstructionSigned-offTCM CORPORATION01/15/2025
1 project · most recent 02/14/2025
General Wiring
FiledStatusContractorScope
02/14/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/05/2025Fire-Resistant Penetrations and JointsEdward Zevallosspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026M01058596-I1Request digital key ↗
08/23/2026M01058599-I1Request digital key ↗
08/23/2026M01058599-P1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M01058599-I1Open ↗
08/13/2026M01058596-I1Open ↗
08/13/2026M01058599-P1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026M01058599-P1Open ↗
08/23/2026M01058599-I1Open ↗
08/13/2026M01058596-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026M01058599-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026M01058599-P1Open ↗
08/23/2026M01058599-I1Open ↗
08/13/2026M01058596-I1Open ↗