← Back
BuildNYC
Library
Bronx Library Center
310 EAST KINGSBRIDGE ROAD · BIN 2116006
💬 Discuss this project
2004Year Built
5Stories
P8Building Class
C4-4Zoning
76,948 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Library · Owner of record: NY Public Library, Astor, Lenox & Tilden Foundation · 17,187 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew York Public Library Bronx Library CenterUnder Construction30p · 4 filings · 18 docs
Floor 5New York Public Library Bronx Library CenterUnder Construction18p · 3 filings · 18 docs
Floor 4New York Public Library Bronx Library Center1 filing · 4 docs
Floor 3New York Public Library Bronx Library Center1 filing · 4 docs
Floor 2New York Public Library Bronx Library Center4p · 2 filings · 9 docs
Floor 1New York Public Library Bronx Library CenterUnder Construction18p · 3 filings · 18 docs
Site & exteriorNew York Public Library Bronx Library Center11p · 4 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY Public Library, Astor, Lenox & Tilden Foundation103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Watts Architects & Engineers206/15/2026
Willdan Energy Solutions209/18/2025
Rigid Structural Design105/08/2025
Popli Design Group104/16/2025
New York & Company107/25/2024
Ashraf107/02/2024
KZ Engineering104/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
Municipal Building Consultants403/21/2026
Rigid Structural Design203/21/2026
Synergy Building Consultants103/21/2026
Danico Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aks InternationalGeneral Contractor609/01/2026
Lakhi General ContractorScaffold203/21/2026
Bec Electrical ContractorsElectrical103/21/2026
Ark Systems ElectricElectrical103/21/2026
Willdan Electrical of NYElectrical103/21/2026
Threetech ElectricElectrical103/21/2026
Arsenal ScaffoldScaffold107/08/2026
Carlitos ContractingScaffold107/08/2026
A. Fontana & SonsGeneral Contractor107/08/2026
Spice Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joadem4350309/18/2025
New York Engineering Associates851107/25/2024
Building Lifecycle
All (125)Filed (9)Permit Issued (8)Signed Off (3)Violation (45)Objection (30)Special Inspection (30)
09/29/2026
Signed off — Alteration
STRUCTURAL WORK INCLUDES REMOVAL OF EXISTING ROOF MOUNTED CONCRETE PIERS SUPPORTING CURRENT MECHANICAL EQUIPMENT, INSTALLATION OF STRUCTURAL STEEL DUNNAGE FRAMING, INCLUDING BUT NOT LIMITED TO STEEL BASEPLATES, POSTS, BEAMS AND DIAGONAL BRACING.
X01201650-I1
08/31/2026
Permit issued — Mechanical Systems
X01179507-I1-MS
07/16/2026
Special inspection requirement — Final
Edward Watts
06/15/2026
Filed — Alteration
general construction work, scope include remove and replace existing roofing membrane, remove GWB 5th fl N. Corridor, rebuild areas of roofing after rtu piers have been removed, fire stopping for all roof , new structural membrane support dunnage frames.
X01201663-P1
06/10/2026
Permit issued — Structural
X01201650-I1-ST
09/23/2025
Special inspection requirement — Interior lighting power
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Exterior lighting power
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Mechanical Systems
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Post-installed Anchors
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Final
Firas Karkar
09/23/2025
Special inspection requirement — Electrical motors and elevators
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Lighting controls
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
OLULADE ADEMOKUN
09/23/2025
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
09/18/2025
Filed — Alteration
Mechanical work for comprehensive energy upgrades as per plans filed herewith. No change to use, egress or occupancy
X01179507-P1
09/11/2025
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Mechanical Systems
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Post-installed Anchors
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Final
Firas Karkar
09/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Lighting controls
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Electrical motors and elevators
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Exterior lighting power
OLULADE ADEMOKUN
09/11/2025
Special inspection requirement — Interior lighting power
OLULADE ADEMOKUN
08/06/2025
Permit issued — General Construction
X01201663-I1-GC
08/06/2025
Permit issued — Mechanical Systems
X01179507-I1-MS
07/28/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Structural
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/04/2025
Objection raised — Fire_Protection
06/04/2025
Objection raised — Other
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/09/2025
Permit issued — Sidewalk Shed
X01219549-I1-SH
05/08/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01219549-I1
05/02/2025
Objection raised — Inspections
04/30/2025
Objection raised — Admin
04/30/2025
Objection raised — Cost
04/30/2025
Objection raised — Admin
04/30/2025
Objection raised — Fire_Protection
04/29/2025
Objection raised — Fire_Protection
04/29/2025
Objection raised — Scope
04/29/2025
Objection raised — Cost
04/29/2025
Objection raised — Scope
04/17/2025
Filed — Alteration
general construction work, scope include remove and replace existing roofing membrane, remove GWB 5th fl N. Corridor, rebuild areas of roofing after rtu piers have been removed, fire stopping for all roof , new structural membrane support dunnage frames.
X01201663-I1
04/16/2025
Filed — Alteration
STRUCTURAL WORK INCLUDES REMOVAL OF EXISTING ROOF MOUNTED CONCRETE PIERS SUPPORTING CURRENT MECHANICAL EQUIPMENT, INSTALLATION OF STRUCTURAL STEEL DUNNAGE FRAMING, INCLUDING BUT NOT LIMITED TO STEEL BASEPLATES, POSTS, BEAMS AND DIAGONAL BRACING.
X01201650-I1
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAks International08/31/2026
DOB NOWStructuralSigned-offAks International06/10/2026
DOB NOWGeneral ConstructionSigned-offAks International08/06/2025
DOB NOWMechanical SystemsPermit IssuedAks International08/06/2025
DOB NOWSidewalk ShedPermit IssuedCarlitos Contracting05/09/2025
DOB NOWGeneral ConstructionSigned-offA. Fontana & Sons08/02/2024
DOB NOWSidewalk ShedPermit IssuedLakhi General Contractor07/03/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold04/20/2021
BISSDISSUEDOlympic Plumbing & Heating Service11/03/2005
BISSPISSUEDPar Fire Protection07/20/2005
BIS—ISSUEDF.J. Sciame Construction Co06/03/2005
BISPLISSUEDOlympic Plumbing & Heating05/20/2005
BISPLISSUEDG.bassolino Plumbing01/20/2005
BISBLISSUEDG.bassolino Plumbing01/20/2005
BISEQISSUEDF.J. Sciame Construction Co12/29/2004
BISEQISSUEDHighrise Hoisting & Scaffolding12/14/2004
BISEQISSUEDF.J. Sciame Construction Co05/19/2004
BISEQISSUEDF.J. Sciame Construction Co04/30/2004
BISOTISSUEDUrban Foundation Engineering04/20/2004
BIS—ISSUEDF.J. Sciame Construction Co04/14/2004
BISEQISSUEDL.j.c.dismantling04/02/2004
BISEQISSUEDLJC Dismantling03/29/2004
BISEQISSUEDLJC Dismantling03/22/2004
BIS—ISSUEDL.j.c.dismantling03/22/2004
BISEQISSUEDLJC Dismantling03/19/2004
BISOTISSUEDLJC Dismantling03/19/2004
BISOTISSUEDLJC Dismantling02/24/2004
BIS—ISSUEDL.j.c.dismantling02/18/2004
BISEQISSUEDLJC Dismantling02/18/2004
BISEQISSUEDL.j.c.dismantling02/18/2004
BISEQISSUEDLJC Dismantling01/30/2004
BISOTISSUEDAirmont05/19/1998
BISEQISSUEDTerra Firm Construction Management/G.C02/14/1997
BISEQRE-ISSUEDBasonas Construction12/30/1996
BISMHISSUEDBasonas Construction12/30/1996
1 project · most recent 09/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2025Permit IssuedAks InternationalHeating and Air Conditioning Systems
Heat / Cool
Trane ACSA 160 tons · Heat Pump Outdoor ×4
5 projects · most recent 11/11/2025
Lighting General Wiring
FiledStatusContractorScope
11/11/2025Permit IssuedArk Systems ElectricGeneral Wiring
09/02/2025Permit IssuedThreetech ElectricLighting
07/18/2025CompleteWilldan Electrical of NYLighting
05/15/2025Permit IssuedSpice Electric Company—
04/21/2021CompleteNash Electric Services—
1 project · most recent 04/16/2025
Steel
FiledStatusContractorScope
04/16/2025Signed-offAks InternationalSteel
2 projects · most recent 05/08/2025
Sidewalk Shed
FiledStatusContractorScope
05/08/2025Permit IssuedCarlitos ContractingSidewalk Shed
07/02/2024Permit IssuedLakhi General ContractorSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
07/16/2026FinalEdward Wattsprogress
09/23/2025Interior lighting powerOLULADE ADEMOKUNenergy_progress
09/23/2025Exterior lighting powerOLULADE ADEMOKUNenergy_progress
09/23/2025HVAC-R and service water piping design and insulationOLULADE ADEMOKUNenergy_progress
09/23/2025HVAC-R and service water heating system controlsOLULADE ADEMOKUNenergy_progress
09/23/2025Mechanical SystemsOLULADE ADEMOKUNspecial
09/23/2025Post-installed AnchorsOLULADE ADEMOKUNspecial
09/23/2025Fire-Resistant Penetrations and JointsOLULADE ADEMOKUNspecial
09/23/2025FinalFiras Karkarprogress
09/23/2025Electrical motors and elevatorsOLULADE ADEMOKUNenergy_progress
09/23/2025Lighting controlsOLULADE ADEMOKUNenergy_progress
09/23/2025HVAC-R and service water heating equipmentOLULADE ADEMOKUNenergy_progress
09/23/2025Maintenance informationOLULADE ADEMOKUNenergy_progress
09/11/2025Maintenance informationOLULADE ADEMOKUNenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsOLULADE ADEMOKUNspecial
09/11/2025Mechanical SystemsOLULADE ADEMOKUNspecial
09/11/2025Post-installed AnchorsOLULADE ADEMOKUNspecial
09/11/2025FinalFiras Karkarprogress
09/11/2025HVAC-R and service water heating equipmentOLULADE ADEMOKUNenergy_progress
09/11/2025Lighting controlsOLULADE ADEMOKUNenergy_progress
09/11/2025Electrical motors and elevatorsOLULADE ADEMOKUNenergy_progress
09/11/2025HVAC-R and service water piping design and insulationOLULADE ADEMOKUNenergy_progress
09/11/2025HVAC-R and service water heating system controlsOLULADE ADEMOKUNenergy_progress
09/11/2025Exterior lighting powerOLULADE ADEMOKUNenergy_progress
09/11/2025Interior lighting powerOLULADE ADEMOKUNenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York Public Library Bronx Library CenterCommunity FacilityEntire building
Project X01219549 Alteration · Permit Entire · 05/08/2025
Project X01201663 Alteration · Permit Entire · 04/17/2025
Project X01201650 Alteration · LOC Issued · 04/16/2025
Project X01179507 Alteration · Permit Entire · 03/26/2025
Project X01078699 Alteration · LOC Issued · 07/25/2024
Project X01074542 Alteration · Permit Entire · 07/02/2024
Project X00500372 Alteration · LOC Issued · 04/19/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026X00500372-I1Request digital key ↗
08/21/2026X01074542-I1Request digital key ↗
08/21/2026X01078699-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature21
09/10/2026X01201663-I1Open ↗
08/28/2026X01179507-I1Open ↗
08/28/2026X01179507-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026X00500372-I1Open ↗
08/21/2026X01078699-I1Open ↗
08/19/2026X01201650-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/28/2026X01179507-I1Open ↗
08/28/2026X01179507-I1Open ↗
08/28/2026X01179507-I1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/19/2026X01201663-P1Open ↗
08/13/2026X01179507-P1Open ↗
08/13/2026X00500372-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents1
▸DOB NOWWaiver Document1
08/19/2026X01201650-I1Open ↗