← Back
Elevator apt, semi-fireproof with stores
GRAND CONCOURSE
BRONX · BIN 2130531
💬 Discuss this project
2021Year Built
14Stories
D7Building Class
C6-2AZoning
128,115 sfGross Floor Area
151Units
LL97 CoveredRent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 310 GRAND CONCOURSE LLC · 15,693 sf lot · 8.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof7p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 17 docs
Floor 143p · 2 filings · 20 docs
Floor 133p · 2 filings · 20 docs
Floor 122p · 1 filing · 17 docs
Floor 111p · 1 filing · 17 docs
Floor 101p · 1 filing · 17 docs
Floor 91p · 1 filing · 17 docs
Floor 82p · 2 filings · 20 docs
Floor 72p · 1 filing · 17 docs
Floor 61p · 1 filing · 17 docs
Floor 52p · 1 filing · 17 docs
Floor 43p · 1 filing · 17 docs
Floor 31p · 1 filing · 17 docs
Floor 22p · 2 filings · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar2p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YS BUILDERS NY7107/08/2026
YS BUILDERS1207/08/2026
110 DENTAL PROPERTIES807/08/2026
310 GRAND CONCOURSE2203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2018$9.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING1403/21/2026
PATUXENT ENGINEERING1203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
AVALON DESIGN203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor1807/08/2026
NY DEVELOPERS & MANAGEMENTGeneral Contractor1107/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection707/08/2026
PM MECHANICAL GROUP CORPGeneral Contractor407/08/2026
GWT ENTERPRISES INCGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
SAFETY FIRE SPRINKLER CORGeneral Contractor103/21/2026
SHTEIERMAN AVIGeneral Contractor103/21/2026
SILVERCUP SCFFLDNG I LLCGeneral Contractor107/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596302/14/2024
20/20 INSPECTIONS INC1471311/14/2022
Building Lifecycle
All (137)Filed (25)Permit Issued (26)Signed Off (13)Violation (37)Inspection (17)Objection (4)Special Inspection (15)
09/08/2026
Violation issued (HPD, open)
B
09/08/2026
Violation issued (HPD, open)
B
09/08/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (ECB, open)
Elevators
06/17/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, open)
C
05/27/2026
Violation issued (HPD, closed)
A
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
05/14/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
08/09/2025
Violation issued (HPD, closed)
C
08/09/2025
Violation issued (HPD, closed)
C
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
07/29/2025
Signed off — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S2
07/29/2025
Signed off — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S1
07/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Violation issued (ECB, closed)
Elevators
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2024
Permit issued — Plumbing
X00964453-S1-EW-SP
10/22/2024
Violation issued (ECB, closed)
Elevators
07/16/2024
Permit issued — Mechanical Systems
X00964453-S2-MS
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Permit issued — Plumbing
X00964453-S1-PL
04/16/2024
Permit issued — General Construction
X00964453-I1-GC
03/15/2024
Objection resolved — Addressed
03/04/2024
Special inspection requirement — Maintenance information
Akeeb Shekoni
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
02/14/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S1
02/07/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S2
02/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Akeeb Shekoni
02/05/2024
Special inspection requirement — Sprinkler Systems
Akeeb Shekoni
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/09/2024
Objection raised — Other
01/05/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-I1
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Akeeb Shekoni
10/04/2023
Violation issued (ECB, closed)
Construction
06/28/2023
Signed off — Alteration
X00593766-I1
06/28/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00527996-I1
06/20/2023
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00539738-I1
04/25/2023
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
X00355747-I1
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJEM FIRE PREVENTION INC11/26/2024
DOB NOWMechanical SystemsSigned-offPM MECHANICAL GROUP CORP07/16/2024
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP05/10/2024
DOB NOWGeneral ConstructionPermit IssuedPM MECHANICAL GROUP CORP04/16/2024
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN03/10/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/20/2022
DOB NOWCurb CutSigned-offNY DEVELOPERS & MANAGEMEN11/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES09/16/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/20/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/15/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/12/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP07/12/2022
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC06/15/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP04/11/2022
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN03/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES03/03/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES03/01/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/23/2021
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES09/20/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP08/03/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP08/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offSILVERCUP SCFFLDNG I LLC07/20/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/19/2021
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP04/23/2021
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN04/05/2021
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN01/21/2021
BIS—ISSUEDNY DEVELOPERS & MANAGEMENT11/23/2022
BISPLISSUEDMPI PLUMBING CORP05/02/2022
BIS—RE-ISSUEDNY DEVELOPERS & MANAGEMENT11/24/2021
BIS—RE-ISSUEDNY DEVELOPERS & MANAGEMENT11/24/2021
BIS—RE-ISSUEDNY DEVELOPERS & MANAGEMENT08/30/2021
BIS—ISSUEDNY DEVELOPERS & MANAGEMENT08/27/2021
BISEQISSUEDMANHATTAN D ENTERPRISES08/03/2021
BIS—RE-ISSUEDNY DEVELOPERS & MANAGEMENT03/18/2021
BIS—RE-ISSUEDNY DEVELOPERS & MANAGEMENT12/14/2020
1 project · most recent 02/14/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/14/2024Signed-offPM MECHANICAL GROUP CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LMU361HHV 36,000 BTU · Vrf Outdoor ×8
Lmu601hv 60,000 BTU · Heat Pump Outdoor ×4
Ventilation
Greenheck SP-B150 1,050 CFM · Exhaust Fan ×4
1 project · most recent 02/14/2024
Sprinkler System
FiledStatusContractorScope
02/14/2024Signed-offJEM FIRE PREVENTION INCSprinkler System
1 project · most recent 02/14/2024
Water/Sanitary
FiledStatusContractorScope
02/14/2024Signed-offTRI CITY MECHANICAL GROUPWater/Sanitary
8 projects · most recent 04/16/2024
General Wiring
FiledStatusContractorScope
04/16/2024CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
08/15/2023CompleteNET POWER ELECTRIC CORPGeneral Wiring
06/05/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
03/16/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
04/14/2022CompleteSTAR ELEC'L CONTRACTORS C—
07/19/2021CompleteV. VASS ELECTRIC CORP—
05/07/2021CompleteV. VASS ELECTRIC CORP—
12/23/2020CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/24/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2023Pass-Final SD - Fire PumpPassView ↗
01/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/04/2024Maintenance informationAkeeb Shekonienergy_progress
03/04/2024HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
03/04/2024HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
03/04/2024HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
02/07/2024Tenant Protection Plan ComplianceAkeeb Shekonispecial
02/05/2024Sprinkler SystemsAkeeb Shekonispecial
02/05/2024Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
12/15/2023Tenant Protection Plan ComplianceAkeeb Shekonispecial
11/16/2022Standpipe SystemsJACOB HAASspecial
11/16/2022Sprinkler SystemsJACOB HAASspecial
11/16/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/07/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/07/2022Sprinkler SystemsJACOB HAASspecial
11/07/2022Standpipe SystemsJACOB HAASspecial
03/25/2022FinalFADY HABEELprogress
▾Documents — 341 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch18
08/25/2026X00561063-P2Request digital key ↗
08/25/2026X00561063-I1Request digital key ↗
08/25/2026X00561063-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
08/26/2026X00156240-I1Request digital key ↗
08/26/2026X00355747-I1Request digital key ↗
08/26/2026X00355747-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
08/26/2026X00188594-I1Request digital key ↗
08/26/2026X00188594-P1Request digital key ↗
08/26/2026X00210934-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026X00188594-I1Request digital key ↗
08/26/2026X00188594-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026X00185756-I1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION37
09/15/2023220696860Open ↗
09/13/2023220696860Open ↗
09/13/2023220696860Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION13
11/23/2022220696860Open ↗
12/01/2021220696860Open ↗
12/01/2021220696860Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/28/2022220696860Open ↗
11/17/2022220696860Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/06/2020220710336Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/06/2020220710336Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/16/2022220696860Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00964453-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/26/2026X00188594-I1Open ↗
08/26/2026X00188594-P1Open ↗
08/26/2026X00210934-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
12/15/2020220696860Open ↗
12/11/2020220696860Open ↗
12/11/2020220696860Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026X00964453-S1Open ↗
08/29/2026X00188594-P1Open ↗
08/29/2026X00188594-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00964453-S1Open ↗
08/23/2026X00683537-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/29/2021240307495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2021240307495Open ↗
▸Trade Schedules & Equipment41
▸BISEQUIPMENT USE APPLICATION/PERMIT18
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS10
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/01/2023220696860Open ↗
04/26/2023220696860Open ↗
12/19/2022220696860Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
05/10/2023220696860Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/09/2023220696860Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/09/2023220696860Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
03/09/2023220696860Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/01/2022220696860Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
11/06/2020220710336Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/11/2020220696860Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
10/28/2020220696860Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026X00964453-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed7
08/26/2026X00355747-I1Open ↗
08/13/2026X00188594-I1Open ↗
08/13/2026X00210934-I1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
08/07/2023220710336Open ↗
08/02/2023220696860Open ↗
02/14/2023240307495Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
07/29/2021240307495Open ↗
04/16/2021220696860Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00210934-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/11/2020220696860Open ↗
12/11/2020220696860Open ↗
Showing 2 of 3 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
02/03/2023220696860Open ↗
▸BISINTERIOR LIGHTING POWER1
03/09/2023220696860Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/03/2023220696860Open ↗
▸BISFENESTRATION AREAS1
02/03/2023220696860Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/03/2023220696860Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/14/2023220696860Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/03/2023220696860Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/30/2021220696860Open ↗
12/30/2021220696860Open ↗
07/29/2021240307495Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
12/27/2021220696860Open ↗
12/27/2021220696860Open ↗
02/10/2021220696860Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/28/2022220696860Open ↗
11/28/2022220696860Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/12/2022220696860Open ↗
12/11/2020220696860Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/24/2023220696860Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/24/2023220696860Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/03/2022220696860Open ↗
▸BISMASONRY1
03/09/2023220696860Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/25/2023220696860Open ↗
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
10/16/2023220696860Open ↗
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE11
09/15/2023220696860Open ↗
09/13/2023220696860Open ↗
04/18/2023220696860Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/30/2023220710336Open ↗
11/23/2022220696860Open ↗
10/28/2020220696860Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/23/2023220696860Open ↗
10/17/2023220696860Open ↗
02/15/2023240307495Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
12/01/2021220696860Open ↗
03/19/2021220696860Open ↗
01/04/2021220696860Open ↗
▸BISNOTICE OF NO OBJECTION FOR SOE & FOUNDAT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
12/14/2022240307495Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/23/2022220696860Open ↗
12/11/2020220696860Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION11
09/15/2023220696860Open ↗
05/30/2023220696860Open ↗
05/15/2023220696860Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS1
03/09/2023220696860Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/06/2023220696860Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD MAP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVESTIBULES1
02/03/2023220696860Open ↗
▸BISMAINTENANCE INFORMATION1
03/09/2023220696860Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026X00964453-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00964453-I1Open ↗