← Back
BuildNYC
Elevator apt, semi-fireproof with stores
310 GRAND CONCOURSE
BRONX · Mott Haven-Port Morris · BIN 2130531
💬 Discuss this project
2021Year Built
14Stories
D7Building Class
C6-2AZoning
128,115 sfGross Floor Area
151Units
LL97 CoveredRent Stabilized18 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 310 Grand Concourse · 15,693 sf lot · 8.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsHkooi Development3 filings
RoofRoof protection2p · 1 filing · 2 docs
Floor 1Advanced Bronx Dental8p · 1 filing · 13 docs
CellarAdvanced Bronx Dental1p · 1 filing · 13 docs
Site & exteriorTemporary construction fence installation7 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YS Builders NY8307/08/2026
310 Grand Concourse2003/22/2026
110 Dental Properties807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2018$9.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting1403/21/2026
Patuxent Engineering1203/21/2026
Synergy Building Consultants203/21/2026
Avalon Design203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Manhattan D EnterprisesScaffold1807/08/2026
Safety Fire SprinklerFire Protection810/04/2026
NY Developers & ManagementScaffold807/08/2026
PM Mechanical Groupspecialty_contractor407/08/2026
NY Developers & ManagementGeneral Contractor303/21/2026
GWT EnterprisesScaffold303/21/2026
Shteierman AviGeneral Contractor103/21/2026
Silvercup Scaffolding IScaffold107/08/2026
Jem Fire PreventionFire Protection107/08/2026
Safety Fire SprinklerGeneral Contractor103/21/2026
Tri City Mechanical GroupPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Askon Architect3596302/14/2024
20/20 Inspections1471311/14/2022
Building Lifecycle
All (136)Filed (25)Permit Issued (27)Signed Off (13)Violation (36)Inspection (15)Objection (4)Special Inspection (16)
09/08/2026
Violation issued (HPD, open)
B
09/08/2026
Violation issued (HPD, open)
B
09/08/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (ECB, closed)
Elevators
05/27/2026
Violation issued (HPD, open)
C
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
A
05/27/2026
Violation issued (HPD, open)
B
05/14/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
08/09/2025
Violation issued (HPD, closed)
C
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
C
08/09/2025
Violation issued (HPD, closed)
B
07/29/2025
Signed off — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S1
07/29/2025
Signed off — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S2
07/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Violation issued (ECB, closed)
Elevators
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/11/2025
Violation issued (HPD, closed)
B
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2024
Permit issued — Sprinklers
X00964453-S1-EW-SP
10/22/2024
Violation issued (ECB, closed)
Elevators
07/16/2024
Permit issued — Mechanical Systems
X00964453-S2-MS
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Permit issued — Plumbing
X00964453-S1-PL
04/16/2024
Permit issued — General Construction
X00964453-I1-GC
03/15/2024
Objection resolved — Addressed
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
03/04/2024
Special inspection requirement — Maintenance information
Akeeb Shekoni
02/14/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S1
02/07/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-S2
02/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Akeeb Shekoni
02/05/2024
Special inspection requirement — Sprinkler Systems
Akeeb Shekoni
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/09/2024
Objection raised — Other
01/05/2024
Filed — Alteration CO
PROPOSED CHANGE OF USE GROUP AND OCCUPANCY GROUP OF PARTIAL FIRST FLOOR
X00964453-I1
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Akeeb Shekoni
10/04/2023
Violation issued (ECB, closed)
Construction
06/28/2023
Signed off — Alteration
X00593766-I1
06/28/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00527996-I1
06/20/2023
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00539738-I1
04/25/2023
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
X00355747-I1
04/25/2023
Signed off — Alteration
INSTALLATION OF NEW CURB CUT IN CONJUNCTION WITH NB # 220696860.
X00185756-I1
04/24/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/16/2023
Signed off — Alteration
SPRINKLER/STANDPIPE SPECIFICATIONS FILED IN CONJUNCITON WITH NB # 220696860.
X00188594-I1
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offJem Fire Prevention11/26/2024
DOB NOWMechanical SystemsSigned-offPM Mechanical Group07/16/2024
DOB NOWPlumbingSigned-offFlavio Mechanical05/10/2024
DOB NOWGeneral ConstructionPermit IssuedPM Mechanical Group04/16/2024
DOB NOWConstruction FenceSigned-offNY Developers & Management03/10/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises12/20/2022
DOB NOWCurb CutSigned-offNY Developers & Management11/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises09/16/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises07/20/2022
DOB NOWStandpipeSigned-offSafety Fire Sprinkler07/15/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler07/12/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler07/12/2022
DOB NOWProtection and Mechanical MethodsSigned-offGWT Enterprises06/15/2022
DOB NOWStandpipeSigned-offSafety Fire Sprinkler04/11/2022
DOB NOWConstruction FenceSigned-offNY Developers & Management03/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises03/03/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises03/01/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises12/23/2021
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises09/20/2021
DOB NOWStandpipeSigned-offSafety Fire Sprinkler08/03/2021
DOB NOWSprinklersSigned-offSafety Fire Sprinkler08/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offSilvercup Scaffolding I07/20/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises07/19/2021
DOB NOWStandpipeSigned-offSafety Fire Sprinkler04/23/2021
DOB NOWConstruction FenceSigned-offNY Developers & Management04/05/2021
DOB NOWConstruction FenceSigned-offNY Developers & Management01/21/2021
DOB NOWStandpipeSigned-offCore Scaffold Systems11/17/2020
BIS—ISSUEDNY Developers & Management11/23/2022
BISPLISSUEDMpi Plumbing05/02/2022
BIS—RE-ISSUEDNY Developers & Management11/24/2021
BIS—RE-ISSUEDNY Developers & Management11/24/2021
BIS—RE-ISSUEDNY Developers & Management08/30/2021
BIS—ISSUEDNY Developers & Management08/27/2021
BISEQISSUEDManhattan D Enterprises08/03/2021
BIS—RE-ISSUEDNY Developers & Management03/18/2021
BIS—RE-ISSUEDNY Developers & Management12/14/2020
1 project · most recent 02/14/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/14/2024Signed-offPM Mechanical GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LMU361HHV 36,000 BTU · Vrf Outdoor ×8
Lmu601hv 60,000 BTU · Heat Pump Outdoor ×4
Ventilation
Greenheck SP-B150 1,050 CFM · Exhaust Fan ×4
1 project · most recent 02/14/2024
Sprinkler System
FiledStatusContractorScope
02/14/2024Signed-offJem Fire PreventionSprinkler System
1 project · most recent 02/14/2024
Water/Sanitary
FiledStatusContractorScope
02/14/2024Signed-offTri City Mechanical GroupWater/Sanitary
8 projects · most recent 04/16/2024
General Wiring
FiledStatusContractorScope
04/16/2024CompleteAscuatech ElectricalGeneral Wiring
08/15/2023CompleteNet Power ElectricGeneral Wiring
06/05/2023CompleteHivolts ElectricalGeneral Wiring
03/16/2023CompleteHivolts ElectricalGeneral Wiring
04/14/2022CompleteStar Electrical Contractors—
07/19/2021CompleteV. Vass Electric—
05/07/2021CompleteV. Vass Electric—
12/23/2020CompleteHivolts Electrical1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/24/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2023Pass-Final SD - Fire PumpPassView ↗
01/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/04/2024HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
03/04/2024HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
03/04/2024HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
03/04/2024Maintenance informationAkeeb Shekonienergy_progress
02/07/2024Tenant Protection Plan ComplianceAkeeb Shekonispecial
02/05/2024Sprinkler SystemsAkeeb Shekonispecial
02/05/2024Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
12/15/2023Tenant Protection Plan ComplianceAkeeb Shekonispecial
11/16/2022Standpipe SystemsJACOB HAASspecial
11/16/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/16/2022Sprinkler SystemsJACOB HAASspecial
11/07/2022Standpipe SystemsJACOB HAASspecial
11/07/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/07/2022Sprinkler SystemsJACOB HAASspecial
03/25/2022FinalFADY HABEELprogress
08/14/2019Standpipe SystemsJACOB HAASspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Advanced Bronx DentalMedical / HealthcareFloor 1
Project X00964453 Alteration CO · LOC Issued · 01/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 342 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch18
08/25/2026X00561063-I1Request digital key ↗
08/25/2026X00561063-P1Request digital key ↗
08/25/2026X00561063-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
08/26/2026X00156240-I1Request digital key ↗
08/26/2026X00355747-I1Request digital key ↗
08/26/2026X00355747-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
08/26/2026X00188594-I1Request digital key ↗
08/26/2026X00188594-P1Request digital key ↗
08/26/2026X00210934-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026X00188594-I1Request digital key ↗
08/26/2026X00188594-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026X00185756-I1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION37
09/15/2023220696860Open ↗
09/13/2023220696860Open ↗
09/13/2023220696860Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION13
11/23/2022220696860Open ↗
12/01/2021220696860Open ↗
12/01/2021220696860Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/28/2022220696860Open ↗
11/17/2022220696860Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/06/2020220710336Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/06/2020220710336Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/16/2022220696860Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00964453-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/26/2026X00188594-I1Open ↗
08/26/2026X00188594-P1Open ↗
08/26/2026X00210934-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/04/2026X00210934-I1Open ↗
09/01/2026X00964453-S1Open ↗
08/29/2026X00188594-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
12/15/2020220696860Open ↗
12/11/2020220696860Open ↗
12/11/2020220696860Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00964453-S1Open ↗
08/23/2026X00683537-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/29/2021240307495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2021240307495Open ↗
▸Trade Schedules & Equipment41
▸BISEQUIPMENT USE APPLICATION/PERMIT18
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS10
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
10/23/2023220696860Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/01/2023220696860Open ↗
04/26/2023220696860Open ↗
12/19/2022220696860Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
05/10/2023220696860Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/09/2023220696860Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/09/2023220696860Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
03/09/2023220696860Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/01/2022220696860Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
11/06/2020220710336Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/11/2020220696860Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
10/28/2020220696860Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026X00964453-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed7
08/26/2026X00355747-I1Open ↗
08/13/2026X00188594-I1Open ↗
08/13/2026X00185756-I1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
08/07/2023220710336Open ↗
08/02/2023220696860Open ↗
02/14/2023240307495Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
07/29/2021240307495Open ↗
04/16/2021220696860Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00210934-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/11/2020220696860Open ↗
12/11/2020220696860Open ↗
Showing 2 of 3 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
02/03/2023220696860Open ↗
▸BISINTERIOR LIGHTING POWER1
03/09/2023220696860Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/03/2023220696860Open ↗
▸BISFENESTRATION AREAS1
02/03/2023220696860Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/03/2023220696860Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/14/2023220696860Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/03/2023220696860Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/30/2021220696860Open ↗
12/30/2021220696860Open ↗
07/29/2021240307495Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
12/27/2021220696860Open ↗
12/27/2021220696860Open ↗
02/10/2021220696860Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/28/2022220696860Open ↗
11/28/2022220696860Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/12/2022220696860Open ↗
12/11/2020220696860Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/24/2023220696860Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/24/2023220696860Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/03/2022220696860Open ↗
▸BISMASONRY1
03/09/2023220696860Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/25/2023220696860Open ↗
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
10/16/2023220696860Open ↗
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE11
09/15/2023220696860Open ↗
09/13/2023220696860Open ↗
04/18/2023220696860Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/30/2023220710336Open ↗
11/23/2022220696860Open ↗
10/28/2020220696860Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/23/2023220696860Open ↗
10/17/2023220696860Open ↗
02/15/2023240307495Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
12/01/2021220696860Open ↗
03/19/2021220696860Open ↗
01/04/2021220696860Open ↗
▸BISNOTICE OF NO OBJECTION FOR SOE & FOUNDAT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
12/14/2022240307495Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/23/2022220696860Open ↗
12/11/2020220696860Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION11
09/15/2023220696860Open ↗
05/30/2023220696860Open ↗
05/15/2023220696860Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS1
03/09/2023220696860Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/06/2023220696860Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD MAP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVESTIBULES1
02/03/2023220696860Open ↗
▸BISMAINTENANCE INFORMATION1
03/09/2023220696860Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026X00964453-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00964453-I1Open ↗