| Owner | Filings | Most Recent |
|---|---|---|
| HUDSON SQUARE REALTY | 582 | 07/08/2026 |
| VIK XS SERVICES INC | 7 | 03/22/2026 |
| LENDLEASEUSCONSTRUCTION | 41 | 03/22/2026 |
| STONEBRIDGE | 4 | 03/22/2026 |
| PATTI AND SONS INC | 2 | 03/22/2026 |
| GRAMERCY GROUP | 3 | 03/22/2026 |
| EPIC MECHANICAL CONTRACT | 1 | 03/22/2026 |
| RECTOR CHURCH WARDENS | 1 | 03/22/2026 |
| CONSTRUCTION LENDLEASE US | 1 | 03/22/2026 |
| CORP OF TRINITY CHURCH TR | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SHALAT ARCHITECTS P.C. | 33 | 06/16/2026 |
| ROBERT DERECTOR ASSOCIATES | 59 | 06/11/2026 |
| THORNTON TOMASETTI | 8 | 05/21/2026 |
| SCHNACKEL ENGINEERS | 4 | 10/14/2025 |
| HRM ENGINEERING SERVICES, PC | 3 | 10/08/2025 |
| JRS ARCHITECT, PC | 1 | 09/30/2025 |
| JULIA MURPHY AIA | 3 | 06/23/2025 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 05/20/2025 |
| LALIRE MARCH ARCHITECTS LLP | 1 | 05/15/2025 |
| JAROS BAUM & BOLLES | 48 | 03/28/2025 |
| CLARK REDER ENGINEERING | 1 | 02/14/2025 |
| TSF ENGINEERING, PC | 1 | 02/01/2025 |
| GENSLER | 27 | 11/25/2024 |
| BRAND ACCESS SOLUTIONS | 26 | 05/23/2024 |
| OSPINO ENGINEERING PLLC | 2 | 03/12/2024 |
| TECNO OBRAS CONSULTING GROUP | 1 | 01/30/2024 |
| JP ENGINEERING | 1 | 05/09/2023 |
| MARCO GIARDINA ARCHITECTURE, PLLC | 1 | 05/05/2023 |
| SAFWAY ATLANTIC LLC | 23 | 03/02/2023 |
| MCLAREN ENGINEERING GROUP | 1 | 08/25/2022 |
| HM LOKE CONSULTING ENGINEERING PC | 8 | 05/10/2022 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 04/18/2022 |
| ARRA ARCHITECTURE | 3 | 02/25/2022 |
| KN ENGINEERING PC | 1 | 03/29/2021 |
| LANGAN ENGINEERING | 6 | 09/30/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 293 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 98 | 03/21/2026 |
| SHALAT ARCHITECTS P C | 20 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| HM LOKE CONSULTING ENGINEERING PC | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| TECNO OBRAS CONSULTING GROUP | 2 | 03/21/2026 |
| AO CONSULTING AND DRAFTING | 4 | 03/21/2026 |
| JMG CONSULTANTS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 60 | 08/30/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 50 | 07/08/2026 |
| LENDLEASE(US)CONSTRUCTION | General Contractor | 27 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 17 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 15 | 07/08/2026 |
| CORE ERECTORS,LLC | General Contractor | 13 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 9 | 07/08/2026 |
| ALMAR PLUMBING & HTG CORP | Plumbing | 9 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 7 | 07/08/2026 |
| AARON PLBG AND MECH SYST | Plumbing | 4 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 4 | 07/08/2026 |
| HORIZON RETAIL CONSTRUCTI | General Contractor | 3 | 04/09/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 3 | 07/08/2026 |
| ADVENT INDUSTRIAL CORP | General Contractor | 3 | 07/08/2026 |
| ANTHONY RANIERI | Electrical | 2 | 03/21/2026 |
| CAS EQUIPMENT LLC | General Contractor | 2 | 03/21/2026 |
| A.S.R. ELEC'L CONTR'G INC | Electrical | 2 | 03/22/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 2 | 07/08/2026 |
| PAUL BOCCIA | Electrical | 2 | 03/21/2026 |
| A & E PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| A M A HOLDINGS | Scaffold | 1 | 07/08/2026 |
| ARTHUR GROSSMAN | Electrical | 1 | 03/21/2026 |
| BIGMAN BROS., INC. | Electrical | 1 | 03/22/2026 |
| CHRIS RICHEY | Electrical | 1 | 03/21/2026 |
| LEVIN ALEXANDER | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 10 | 06/11/2026 |
| SHALAT ARCHITECTS P.C. | 2036 | 4 | 05/13/2026 |
| JOSEPH MARTINES PE, PLLC | 1428 | 3 | 10/08/2025 |
| FUTURE TECH CONSULTANTS O | 589 | 102 | 06/05/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 1 | 05/20/2025 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 4 | 05/20/2025 |
| TSF ENGINEERING, PC | 1274 | 1 | 02/01/2025 |
| TECNO OBRAS CONSULTING GR | 6498 | 1 | 01/30/2024 |
| CLARKE ENGINEERING SERVIC | 3795 | 1 | 04/18/2022 |
| PSI AGENCY INC. | 254 | 1 | 02/25/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 08/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 06/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 06/01/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 05/29/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/20/2026 |
| DOB NOW | Plumbing | Signed-off | MACCARONE PLUMBING INC | 03/05/2026 |
| DOB NOW | Mechanical Systems | Signed-off | HORIZON RETAIL CONSTRUCTI | 02/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CAS EQUIPMENT | 01/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 01/08/2026 |
| DOB NOW | Plumbing | Signed-off | AARON PLBG AND MECH SYST | 11/20/2025 |
| DOB NOW | General Construction | Signed-off | HORIZON RETAIL CONSTRUCTI | 11/03/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 10/29/2025 |
| DOB NOW | General Construction | Permit Issued | W.J. NORTHRIDGE CONST COR | 10/23/2025 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 10/07/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 10/02/2025 |
| DOB NOW | Structural | Signed-off | ADVENT INDUSTRIAL | 06/16/2025 |
| DOB NOW | Plumbing | Signed-off | PREFERRED MECHANICAL INC | 04/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 04/08/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 04/08/2025 |
| DOB NOW | Standpipe | Signed-off | SIRINA FIRE PROT CORP | 04/04/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/21/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 03/18/2025 |
| DOB NOW | Structural | Signed-off | WINICK PRODUCTIONS, LLC | 02/19/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 02/05/2025 |
| DOB NOW | Sign | Signed-off | A.M.A HOLDINGS INC | 12/20/2024 |
| DOB NOW | Structural | Signed-off | ADVENT INDUSTRIAL | 10/25/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/24/2024 |
| DOB NOW | Standpipe | Signed-off | PACE PLUMBING CORP | 04/23/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 04/03/2024 |
| DOB NOW | Standpipe | Signed-off | SIRINA FIRE PROT CORP | 04/01/2024 |
| DOB NOW | Standpipe | Signed-off | SIRINA FIRE PROT CORP | 04/01/2024 |
| DOB NOW | Plumbing | Signed-off | ALMAR PLUMBING & HTG CORP | 03/15/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 03/08/2024 |
| DOB NOW | Supported Scaffold | Signed-off | CORE ERECTORS | 02/01/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | VIK XS SERVICES INC | 01/31/2024 |
| DOB NOW | Structural | Signed-off | LENDLEASE(US)CONSTRUCTION | 01/25/2024 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 12/13/2023 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 12/13/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/12/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/08/2025 | Permit Issued | CAS EQUIPMENT LLC | Heating and Air Conditioning Systems | — |
| 04/01/2024 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Nortek ITF-DH50 23,000 CFM · Ahu ×15 AHU-MIXING-10E-3 12,000 CFM · Ahu ×5 ITF-DH31 14,000 CFM · Ahu ×5 ITF-DH41 18,000 CFM · Ahu ×5 ITF-DH42 18,500 CFM · Ahu ×5 |
| 02/15/2024 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Associated Ducts and Piping | Cooling Ventrol ITF-DH34 20,000 CFM ×1 |
| 02/15/2024 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Vertiv CW041U 5,850 CFM · Crac Unit ×8 |
| 11/15/2023 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Associated Ducts and Piping | |
| 05/09/2023 | — | — | Associated Ducts and Piping | Ducts & Piping N/A ×1 |
| 02/25/2022 | Signed-off | STRUCTURE TONE, LLC | Ventilation Systems | Ventilation N/A N/A 1 BTU · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 05/27/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 10/14/2025 | Signed-off | SIRINA FIRE PROT CORP | Sprinkler System |
| 10/08/2025 | Permit Issued | SIRINA FIRE PROT CORP | Sprinkler System |
| 02/15/2024 | Signed-off | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 02/15/2024 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 11/15/2023 | Signed-off | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 10/19/2021 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 10/14/2025 | Signed-off | AARON PLBG AND MECH SYST | Water/Sanitary |
| 10/08/2025 | Signed-off | MACCARONE PLUMBING INC | Water/Sanitary |
| 02/15/2024 | Signed-off | PACE PLUMBING CORP | Water/Sanitary |
| 02/15/2024 | Signed-off | PREFERRED MECHANICAL INC | Water/Sanitary |
| 11/15/2023 | Signed-off | PREFERRED MECHANICAL INC | Water/Sanitary |
| 05/09/2023 | — | — | Water/Sanitary |
| 02/25/2022 | Permit Issued | PACE PLUMBING CORP | Water/Sanitary |
| 10/19/2021 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 09/30/2020 | Permit Issued | ALMAR PLUMBING & HTG CORP | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Complete | H. & L. ELECTRIC INC | 4 meters, 1 new_meters |
| 08/10/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 06/10/2026 | Complete | CORPORATE ELEC. GROUP INC | — |
| 06/10/2026 | Complete | CORPORATE ELEC. GROUP INC | — |
| 06/10/2026 | Complete | CORPORATE ELEC. GROUP INC | — |
| 05/15/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 04/23/2026 | Complete | POWERONE ELECT'L CONTRG | General Wiring |
| 02/25/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 01/20/2026 | Complete | H. & L. ELECTRIC INC | 3 meters, 1 new_meters |
| 01/02/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 12/02/2025 | Complete | NEAD ELECTRIC INC. | 1 meters, 1 new_meters |
| 11/20/2025 | Complete | ABC, INC. | — |
| 11/18/2025 | Permit Issued | ABC, INC. | General Wiring |
| 08/25/2025 | Complete | EGG ELECTRIC INC. | General Wiring, Lighting |
| 04/30/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | Permit Issued | STRUCTURE TONE, LLC | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/29/2021 | Permit Issued | LENDLEASE(US)CONSTRUCTION | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/12/2024 | Permit Issued | VIK XS SERVICES INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/07/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 04/28/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 04/17/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/16/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/15/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/01/2026 | Post-installed Anchors | MARISA HARTE | special |
| 05/07/2026 | Sprinkler Systems | MARISA HARTE | special |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | Edward Shalat | special |
| 05/06/2026 | Energy Code Compliance Inspections | MARISA HARTE | progress |
| 05/06/2026 | Post-installed Anchors | MARISA HARTE | special |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | MARISA HARTE | special |
| 05/06/2026 | Energy Code Compliance Inspections | Edward Shalat | progress |
| 05/06/2026 | Lighting controls | Edward Shalat | energy_progress |
| 05/06/2026 | Post-installed Anchors | MARISA HARTE | special |
| 05/06/2026 | Interior lighting power | Edward Shalat | energy_progress |
| 04/23/2026 | Mechanical Systems | MARISA HARTE | special |
| 04/23/2026 | Sprinkler Systems | MARISA HARTE | special |
| 04/23/2026 | Final | MARISA HARTE | progress |
| 04/23/2026 | Final | Edward Shalat | progress |
| 10/15/2025 | Fire-Resistant Penetrations and Joints | Shahrish Shuvo | special |
| 10/01/2025 | Interior lighting power | Edward Shalat | energy_progress |
| 10/01/2025 | Final | Edward Shalat | progress |
| 10/01/2025 | Lighting controls | Edward Shalat | energy_progress |
| 09/05/2025 | Fire-Resistant Penetrations and Joints | JOSEPH MARTINES | special |
| 09/05/2025 | Energy Code Compliance Inspections | JOSEPH MARTINES | progress |
| 09/05/2025 | Duct leakage testing, insulation and design | JOSEPH MARTINES | energy_progress |
| 09/05/2025 | HVAC-R and service water heating system controls | JOSEPH MARTINES | energy_progress |
| 09/05/2025 | Maintenance information | JOSEPH MARTINES | energy_progress |
| 09/05/2025 | HVAC-R and service water piping design and insulation | JOSEPH MARTINES | energy_progress |
| 09/05/2025 | HVAC-R and service water heating equipment | JOSEPH MARTINES | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Disney/ABC | Retail | Floor 1 | Project M01295938 |
| Warby Parker | Retail | Floor 1 | Project M01218193 |
| Galaxy Dressing Rooms | Other | Sub-cellar | Project M01189773 |
| Live with Kelly and Mark ABC Disney | Office | — | Project M01178185 |
| Studio A - Kelly & Ryan | Office | Sub-cellar | Project M01174359 |
| The Walt Disney Company | Office | Sub-cellar, Cellar, Floors 1–19, Roof | Project M00600286 Project M00573154 Project M00207906 |