← Back
Elevator cooperative
310 WEST 94 STREET
MANHATTAN · Upper West Side (Central) · BIN 1034139
💬 Discuss this project
1901Year Built
7Stories
D4Building Class
R8Zoning
31,760 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: NORSON RLTY CORP · 6,241 sf lot · 5.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Floor 62p · 1 filing · 4 docs
Floor 52p · 1 filing · 4 docs
Floor 42p · 1 filing · 4 docs
Floor 38p · 4 filings · 20 docs
Floor 22p · 1 filing · 4 docs
Floor 117p · 4 filings · 20 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORSON REALTY5607/08/2026
KINGS GROUP NY607/08/2026
BILLY ENTERPRISES607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VIC RENOVATIONS LLCGeneral Contractor407/08/2026
BILLY ENTERPRISES INCGeneral Contractor407/08/2026
KINGS GROUP NY CORPGeneral Contractor407/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
ALTI CONSTRUCTION INCGeneral Contractor104/09/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor107/08/2026
CRAFTED INTERIORS DESIGNGeneral Contractor107/08/2026
HAPPY HOUSE CONSTRUCTIONGeneral Contractor104/09/2026
ASTORIA P & H CORPPlumbing107/08/2026
ASTER ELECTRIC, INCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
HOLNESS, GEORGEElectrical103/21/2026
JOSEPH ALOIAElectrical103/21/2026
TRANSCANADAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WEI STUDIO7998209/24/2025
JOSEPH BOTTA, PE, PC1139208/27/2025
A. GIANNOPOULOS ARCHITECT2196207/31/2024
JOEL PHAGOO ,PE, PLLC2416103/19/2024
LANE ENGINEERING CONSULTI2967103/27/2023
Building Lifecycle
All (141)Filed (12)Permit Issued (15)Signed Off (8)Facade (FISP) (12)Violation (29)Inspection (9)Objection (38)Special Inspection (18)
05/21/2026
Signed off — Alteration
Unit 3D interior renovation. Remove and install non-bearing partitions. Replace one exterior window in the bathroom. No change in use, occupancy, or egress under this application.
M01115244-I1
05/21/2026
Signed off — Alteration
Unit 3D interior renovation. Remove and install plumbing fixtures. No change in use, occupancy, or egress under this application.
M01115245-I1
01/31/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Permit issued — Plumbing
M01115245-I1-PL
12/19/2025
Permit issued — General Construction
M01115244-I1-GC
11/28/2025
Objection resolved — Addressed
11/27/2025
Objection raised — Scope
11/27/2025
Objection resolved — Addressed
11/27/2025
Objection resolved — Addressed
11/14/2025
Permit issued — Plumbing
M01088526-S1-PL
11/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/10/2025
Signed off — Alteration
Renovation of Apartment 1 C, no change in use occupancy or egress
M01172217-I1
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Special inspection requirement — Fenestration air leakage
Ruoyu Wei
10/28/2025
Special inspection requirement — Air barrier - visual inspection
Ruoyu Wei
10/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Ruoyu Wei
10/28/2025
Special inspection requirement — Fenestration areas
Ruoyu Wei
10/27/2025
Objection raised — Structural
10/27/2025
Objection raised — Cost
10/27/2025
Objection raised — Energy
10/27/2025
Objection raised — Energy
10/27/2025
Objection raised — Cost
10/27/2025
Objection raised — Scope
10/27/2025
Objection raised — Scope
10/24/2025
Objection raised — Scope
10/24/2025
Objection raised — Scope
10/24/2025
Objection raised — Scope
10/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/24/2025
Filed — Alteration
Unit 3D interior renovation. Remove and install non-bearing partitions. Replace one exterior window in the bathroom. No change in use, occupancy, or egress under this application.
M01115244-I1
09/24/2025
Filed — Alteration
Unit 3D interior renovation. Remove and install plumbing fixtures. No change in use, occupancy, or egress under this application.
M01115245-I1
09/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/03/2025
Objection raised — Scope
09/03/2025
Objection resolved — Addressed
09/03/2025
Objection raised — Scope
09/03/2025
Objection resolved — Addressed
08/27/2025
Filed — Alteration
Renovation of Apartment 1 C, no change in use occupancy or egress
M01172217-P1
08/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Permit issued — General Construction
M01088526-I1-GC
06/03/2025
Permit issued — General Construction
M01172217-I1-GC
05/15/2025
Objection resolved — Addressed
05/10/2025
Objection resolved — Addressed
04/29/2025
Objection raised — Mechanical
04/29/2025
Objection raised — Admin
04/17/2025
Filed — Alteration
Renovation of Apartment 1 C, no change in use occupancy or egress
M01172217-I1
04/15/2025
Signed off — Alteration
INTERIOR RENOVATION TO APARTMENT 1A. WORK TO INCLUDE MODIFICATIONS TO INTERIOR NON-BEARING PARTITIONS, PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED IN SUBSEQUENT FILING AND NEW INTERIOR FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01080241-I1
04/15/2025
Signed off — Alteration
INTERIOR RENOVATION TO APARTMENT 1A. WORK TO INCLUDE MODIFICATIONS TO INTERIOR NON-BEARING PARTITIONS, PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED IN SUBSEQUENT FILING AND NEW INTERIOR FINISHES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01080241-S1
02/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2024
Permit issued — Plumbing
M01080241-S1-PL
09/24/2024
Special inspection requirement — Lighting controls
Ruoyu Wei
09/24/2024
Special inspection requirement — Lighting in dwelling units
Ruoyu Wei
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/22/2025
DOB NOWGeneral ConstructionSigned-offHAPPY HOUSE CONSTRUCTION12/19/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/14/2025
DOB NOWGeneral ConstructionPermit IssuedVIC RENOVATIONS LLC06/27/2025
DOB NOWGeneral ConstructionSigned-offALTI CONSTRUCTION INC06/03/2025
DOB NOWPlumbingSigned-offASTORIA P & H CORP10/16/2024
DOB NOWGeneral ConstructionSigned-offCRAFTED INTERIORS DESIGN09/16/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/28/2024
DOB NOWGeneral ConstructionPermit IssuedVIC RENOVATIONS LLC08/20/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP03/21/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/08/2024
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION08/21/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/09/2023
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/11/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC12/10/2018
BISOTISSUEDART-B CONSTRUCTION CORP02/15/2019
BISPLISSUEDBILLHARZ PLUMBING, INC01/17/2017
BISBLISSUEDA&C HEATING SERVICES INC06/27/2016
BISPLISSUEDA & C HTG SERVICES, INC05/11/2016
BISFBISSUEDA&C HEATING SERVICES INC05/11/2016
BISPLISSUEDADVANTAGE PLBG & MECH.COR10/09/2013
BISOTISSUEDKNIGHTS INTERIORS INC09/03/2013
BISMHISSUEDKNIGHTS INTERIORS INC09/03/2013
BISEQISSUEDJERRICK ASSOCIATES INC02/22/2012
BISEQISSUEDJERRICK ASSOCIATES INC02/22/2012
BISPLISSUEDMARATHON MECHANICAL LLC12/01/2005
BISOTISSUEDCHRISTOS FARANTATOS07/25/2005
BISPLISSUEDJ&R PLUMBING HEATINGCORPORATION03/22/2005
BISOTISSUEDON SITE CONSTR.03/17/2005
BISMHISSUEDDOWNTOWN INTERIORS, INC.05/30/2002
BISPLISSUEDWYNNE PLBG & HEATING CORP04/11/2001
BISEQISSUEDROCKLEDGE SCAFFOLD CORP05/23/2000
BISSPISSUEDERTOR & COMPACTION INC08/21/1990
BISOTISSUEDAPPLE INCINERATOR & COMPACTION08/20/1990
2 projects · most recent 09/24/2025
Water/Sanitary Gas
FiledStatusContractorScope
09/24/2025Signed-offJOHN FITZGERALD PLBG &HTGWater/Sanitary
07/31/2024Signed-offDPH PLUMBING & HTG CORPGas, Water/Sanitary
11 projects · most recent 12/15/2025
General Wiring
FiledStatusContractorScope
12/15/2025CompleteKJK ELECTRIC INCGeneral Wiring
06/10/2025Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
06/09/2025CompleteVERTEX ELECTRIC CORP.General Wiring
05/04/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
10/29/2024Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
09/11/2024Permit IssuedA'S ELECTRIC CONTRACTINGGeneral Wiring
08/16/2023CompleteHIGH QUALITY ELECTRIC OF—
11/20/2020CompleteVOLTAGE ELECTRIC CORP—
10/08/2020CompleteVOLTAGE ELECTRIC CORP—
05/06/2019CompleteASTER ELECTRIC, INCGeneral Wiring
11/30/2018Permit IssuedRICHARD NEU—
1 project · most recent 03/19/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/19/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/31/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/28/2025Fenestration air leakageRuoyu Weienergy_progress
10/28/2025Air barrier - visual inspectionRuoyu Weienergy_progress
10/28/2025Fenestration and door U-factor and product ratingsRuoyu Weienergy_progress
10/28/2025Fenestration areasRuoyu Weienergy_progress
09/24/2024Lighting controlsRuoyu Weienergy_progress
09/24/2024Lighting in dwelling unitsRuoyu Weienergy_progress
09/24/2024Tenant Protection Plan ComplianceRuoyu Weispecial
09/24/2024FinalRuoyu Weiprogress
09/24/2024Fire-Resistant Penetrations and JointsRuoyu Weispecial
09/23/2024Tenant Protection Plan ComplianceRuoyu Weispecial
09/23/2024Fire-Resistant Penetrations and JointsRuoyu Weispecial
07/31/2024Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
07/30/2024Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
07/30/2024Interior lighting powerANASTASIOS GIANNOPOULOSenergy_progress
07/12/2024Energy Code Compliance InspectionsMegan Przywaraprogress
07/12/2024FinalMegan Przywaraprogress
07/12/2024Energy Code Compliance InspectionsMegan Przywaraprogress
03/07/2024Post-installed AnchorsJOEL PHAGOOspecial
▾Documents — 190 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/06/2026M00103779-I1Request digital key ↗
08/31/2026M00840234-I1Request digital key ↗
08/31/2026M00837466-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION13
02/19/2019123518639Open ↗
01/18/2017122938223Open ↗
05/10/2016140493730Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
10/04/2018123518639Open ↗
04/18/2017122938223Open ↗
11/10/2016122938223Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit9
08/13/2026M01115245-I1Open ↗
08/13/2026M01080241-I1Open ↗
08/13/2026M01080241-S1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
11/25/2019123518639Open ↗
10/04/2018123518639Open ↗
11/29/2017122938223Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/06/2026M00103779-I1Open ↗
08/31/2026M00837466-I1Open ↗
08/26/2026M01088526-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026M01080241-I1Open ↗
08/28/2026M01080241-I1Open ↗
08/25/2026M01080241-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026M01115245-I1Open ↗
08/27/2026M01115245-I1Open ↗
08/26/2026M01088526-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/04/2018123518639Open ↗
10/04/2018123518639Open ↗
02/23/2012120986068Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/23/2012120986068Open ↗
02/23/2012120984578Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/10/2016140493730Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/10/2016140493730Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/10/2016140493730Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/18/2017122938223Open ↗
11/10/2016122938223Open ↗
01/09/2014121697324Open ↗
▸BISSCHEDULE B - PLUMBING3
05/10/2016140493730Open ↗
07/03/2013121697324Open ↗
09/20/2011120816509Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
02/05/2014121697324Open ↗
12/16/2013121697324Open ↗
11/21/2013121697324Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/10/2016140493730Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
10/04/2018123518639Open ↗
11/10/2016122938223Open ↗
05/10/2016140493730Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/19/2013121697324Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026M00837466-I1Open ↗
08/26/2026M01088526-S1Open ↗
08/26/2026M01088526-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
02/27/2012120984578Open ↗
02/23/2012120984578Open ↗
02/23/2012120984578Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2016122938223Open ↗
07/03/2013121697324Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/10/2016140493730Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/25/2019123518639Open ↗
10/04/2018123518639Open ↗
11/29/2017122938223Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/25/2019123518639Open ↗
11/29/2017122938223Open ↗
11/18/2016140493730Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/10/2016140493730Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/10/2016140493730Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/20/2011120816509Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/10/2016140493730Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/19/2019123518639Open ↗
11/29/2017122938223Open ↗
11/18/2016140493730Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/25/2019123518639Open ↗
11/29/2017122938223Open ↗
11/18/2016140493730Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL5
11/25/2019123518639Open ↗
10/04/2018123518639Open ↗
05/10/2016140493730Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/03/2013121697324Open ↗
02/23/2012120986068Open ↗
02/23/2012120984578Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
04/11/2013120986068Open ↗
04/11/2013120984578Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
11/25/2019123518639Open ↗
10/04/2018123518639Open ↗
11/29/2017122938223Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
10/04/2018123518639Open ↗
11/10/2016122938223Open ↗
07/03/2013121697324Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
04/28/2017122938223Open ↗
04/18/2017122938223Open ↗
10/14/2016140493730Open ↗
▸BISBOROUGH INTAKE FORM2
11/25/2019123518639Open ↗
11/29/2017122938223Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/10/2016140493730Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications1
08/13/2026M01016693-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00103779-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01016693-I1Open ↗