← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Flatbush Gardens
3103 FOSTER AVENUE · BIN 3323535
💬 Discuss this project
1950Year Built
6Stories
D1Building Class
R6Zoning
129,600 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized68 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Flatbush Gardens Housing Development Fun D · 60,000 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlaster repair and painting in stairway1p · 1 filing · 4 docs
Floor 6Plaster repair and painting in stairway1p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clipper Equity307/08/2026
Renaissance Equity Holding103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design + Urbanism Architectural106/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Power Direct ElectricElectrical103/22/2026
Sumon AbdinGeneral Contractor107/08/2026
Building Lifecycle
All (66)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Objection (2)Special Inspection (1)
09/05/2026
Violation issued (HPD, open)
B
09/05/2026
Violation issued (HPD, open)
A
07/26/2026
Violation issued (HPD, open)
A
07/26/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
C
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
C
06/25/2026
Violation issued (HPD, open)
B
05/28/2026
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
11/09/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
B
10/21/2025
Violation issued (HPD, closed)
C
07/30/2025
Violation issued (HPD, closed)
C
07/30/2025
Violation issued (HPD, closed)
B
07/30/2025
Violation issued (HPD, closed)
A
07/30/2025
Violation issued (HPD, closed)
B
06/23/2025
Violation issued (HPD, closed)
C
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
B
02/04/2025
Violation issued (HPD, closed)
A
12/11/2024
Violation issued (HPD, closed)
C
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, open)
B
12/02/2024
Violation issued (HPD, open)
C
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, open)
C
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
B
11/05/2024
Violation issued (HPD, closed)
B
11/05/2024
Violation issued (HPD, closed)
B
11/05/2024
Violation issued (HPD, closed)
C
11/05/2024
Violation issued (HPD, closed)
C
08/28/2024
Violation issued (HPD, closed)
C
08/28/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
B
08/07/2024
Violation issued (HPD, closed)
B
08/07/2024
Violation issued (HPD, closed)
B
08/07/2024
Violation issued (HPD, closed)
A
08/07/2024
Violation issued (HPD, closed)
C
06/21/2024
Violation issued (HPD, closed)
B
06/10/2024
Violation issued (HPD, closed)
B
06/10/2024
Violation issued (HPD, closed)
B
06/10/2024
Violation issued (HPD, closed)
B
06/10/2024
Violation issued (HPD, closed)
B
06/10/2024
Violation issued (HPD, closed)
B
06/08/2024
Violation issued (HPD, closed)
A
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSumon Abdin01/25/2023
1 project · most recent 06/18/2025
General Wiring
FiledStatusContractorScope
06/18/2025CompletePower Direct ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/27/2022FinalALEKSANDR LEVINprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00726815-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00726815-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00726815-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00726815-I1Open ↗