| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368106 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 09/17/2026 | Contractor KITCHEN EXHAUST SOLUTION Filer METROPOLIS GROUP INC | Construction of new mechanical enclosure around mechanical equipment on existing roof. Aluminum enclosure with louvered openings for ventila… |
| Q00926521 ↗ | 5123 BEACH CHANNEL DRIVE QUEENS | Alteration | Permit Issued | 10/30/2023 | 03/11/2026 | Owner CHATEAU GC LLC Contractor FRANCIS B CONSTRUCTION | Sprinkler Modification / Installation pursuant to Interior Renovation of Existing Commercial Space to Tenant Fit-Out. No change in egress, u… |
| M01339680 ↗ | 76 BEAVER STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 03/04/2026 | Owner 11 HANOVER SQUARE CORP. Contractor KELTIC CONSTRUCTION & WOO | MECHANICAL WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT RENOVATIONS INCLUDING NEW BATHROOM VENTILATION SYSTEM TO CONNECT TO EXISTING OUTLET AS … |
| B01096488 ↗ | 6215 4 AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/19/2024 | 02/20/2026 | Contractor TESS CONTRACTING CORP Filer 4444 PPPP CORP | subsequent filing to do support of excavation work in conjunction with GC |
| M01303737 ↗ | 1251 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/31/2025 | 02/04/2026 | Contractor MODERN DYNAMIC ASSEMBLY | APPLICATION OF NEW INTERIOR FIREPROOFING ONLY TO EXISTING ELEMENTS & EXTERIOR MASONRY ALTERATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN … |
| M01339682 ↗ | 76 BEAVER STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 02/02/2026 | Owner 11 HANOVER SQUARE CORP. Contractor ANTHONY DISABATO | PLUMBING WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Person | Filings | Most recent |
|---|---|---|
| Jon Michael Conard | 56 | 07/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GEORGE SCHELL ENGINEERING | 4 | 03/06/2026 |
| DJM CONSULTING ENGINEERING | 1 | 07/10/2026 |
| INSIGHT STUDIO ARCHITECTURE PC | 1 | 02/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| INTERSTATE INTERIORS INC | 5 | 01/31/2024 |
| SGI VISUALS LLC | 4 | 09/19/2019 |
| ADRIATIC PLBG & HTG CORP | 3 | 07/13/2026 |
| KELTIC CONSTRUCTION & WOO | 3 | 08/12/2026 |
| BOBBY J. ENTERPRISE INC | 2 | 07/13/2026 |
| QPR MECHANICAL INC | 2 | 01/12/2026 |
| TESS CONTRACTING CORP | 2 | 07/10/2026 |
| A & J CRANE SERVICE INC | 1 | 02/13/2026 |
| BBM CONSTRUCTION CORP | 1 | 08/12/2025 |
| BLUE CITY CONSTRUCTION | 1 | 01/11/2022 |
| CARE FREE ALARMS INC | 1 | 04/27/2022 |
| COAST BUILDING MANAGEMENT | 1 | 10/06/2025 |
| CROSSFIELD PLBG.&HTG.CORP | 1 | 02/13/2026 |
| F & T MECHANICAL INC | 1 | 03/17/2020 |
| FIDELIS CONSTRUCTION MGMT | 1 | 04/11/2022 |
| FRANCIS B CONSTRUCTION | 1 | 02/13/2026 |
| HOD PIPING & HEATING CORP | 1 | 01/11/2022 |
| J-TECH CONTRACTING INC | 1 | 03/17/2020 |
| JDM CONTRACTING SERVICES | 1 | 07/24/2023 |
| KITCHEN EXHAUST SOLUTION | 1 | 03/27/2026 |
| KSZ GROUP INC | 1 | 10/06/2025 |
| LEO KING CONTRACTING CORP | 1 | 02/03/2020 |
| MASTER TECH PLUMBING LLC | 1 | 07/24/2023 |
| METRO MECHANICAL GROUP IN | 1 | 07/10/2026 |
| MODERN DYNAMIC ASSEMBLY | 1 | 06/26/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 11 HANOVER SQUARE CORP. | 3 | 08/12/2026 |
| CLIPPER EQUITY | 2 | 06/02/2022 |
| GRAMERCY 15 CORPORATION | 2 | 03/09/2021 |
| MANHATTAN HOUSE CONDOMINIUM | 2 | 08/29/2025 |
| METRO MANAGEMENT | 2 | 03/17/2020 |
| 165 E 66 LLC | 1 | 03/17/2020 |
| BJP RIVERSIDE REALTY LLC | 1 | 11/02/2023 |
| CHATEAU GC LLC | 1 | 02/13/2026 |
| DESIGN + URBANISM ARCHITECTURAL | 1 | 07/13/2026 |
| Deerwood Realty LLC | 1 | 12/18/2025 |
| GRAND SLAM NEW YORK LLC | 1 | 08/12/2025 |
| HELM EQUITIES LLC | 1 | 10/06/2025 |
| KINGBRIDGE GARMENT CARE CORP. | 1 | 07/24/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 7 | 03/27/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 6 | 08/12/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 5 | 07/13/2026 |
| 4444 PPPP CORP | 4 | 07/10/2026 |
| JM ZONING, LLC. | 3 | 06/02/2022 |
| SEAY-YARBROUGH INC | 2 | 03/09/2021 |
| A1 EXPEDITING SERVICE CORP. | 1 | 02/13/2026 |
| FAVIO & MARIA BARRIONUEVO LLC | 1 | 07/24/2023 |
| PDG BUILDING CONSULTANTS LLC LLC | 1 | 01/11/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368106 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 09/17/2026 | Contractor KITCHEN EXHAUST SOLUTION Filer METROPOLIS GROUP INC | Construction of new mechanical enclosure around mechanical equipment on existing roof. Aluminum enclosure with louvered openings for ventila… |
| Q00926521 ↗ | 5123 BEACH CHANNEL DRIVE QUEENS | Alteration | Permit Issued | 10/30/2023 | 03/11/2026 | Owner CHATEAU GC LLC Contractor FRANCIS B CONSTRUCTION | Sprinkler Modification / Installation pursuant to Interior Renovation of Existing Commercial Space to Tenant Fit-Out. No change in egress, u… |
| M01339680 ↗ | 76 BEAVER STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 03/04/2026 | Owner 11 HANOVER SQUARE CORP. Contractor KELTIC CONSTRUCTION & WOO | MECHANICAL WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT RENOVATIONS INCLUDING NEW BATHROOM VENTILATION SYSTEM TO CONNECT TO EXISTING OUTLET AS … |
| B01096488 ↗ | 6215 4 AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/19/2024 | 02/20/2026 | Contractor TESS CONTRACTING CORP Filer 4444 PPPP CORP | subsequent filing to do support of excavation work in conjunction with GC |
| M01303737 ↗ | 1251 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/31/2025 | 02/04/2026 | Contractor MODERN DYNAMIC ASSEMBLY | APPLICATION OF NEW INTERIOR FIREPROOFING ONLY TO EXISTING ELEMENTS & EXTERIOR MASONRY ALTERATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN … |
| M01339682 ↗ | 76 BEAVER STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 02/02/2026 | Owner 11 HANOVER SQUARE CORP. Contractor ANTHONY DISABATO | PLUMBING WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01339672 ↗ | 76 BEAVER STREET MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 01/28/2026 | Owner 11 HANOVER SQUARE CORP. Contractor KELTIC CONSTRUCTION & WOO | GENERAL CONSTRUCTION FOR 1ST FLOOR RESTAURANT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01253250 ↗ | 2 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 08/04/2025 | 01/26/2026 | Contractor BOBBY J ENTERPRISE | INTERIOR RENOVATION OF 12B. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01296167 ↗ | 150 CENTRAL PARK SOUTH MANHATTAN | Alteration | Filed — no permit on record | 11/28/2025 | — | Owner Deerwood Realty LLC | — |
| B01082797 ↗ | 6215 4 AVENUE BROOKLYN | Alteration | Signed-off | 10/01/2024 | 11/10/2025 | Contractor TESS CONTRACTING CORP Filer 4444 PPPP CORP | Install new 8' construction fence |
| X01113735 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 10/10/2024 | 05/01/2025 | Owner GRAND SLAM NEW YORK LLC Contractor BBM CONSTRUCTION CORP | GENERAL CONSTRUCTION FOR MINOR INTERIOR RENOVATIONS TO REMOVE A NON-EGRESS STAIR AND CLOSE UP THE EXISTING OPENING AS PER PLANS FILED HEREWI… |
| M01149764 ↗ | 1849 2 AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 02/14/2025 | — | Filer METROPOLIS GROUP INC | — |
| M01077098 ↗ | 200 EAST 66 STREET MANHATTAN | Alteration | Signed-off | 07/15/2024 | 01/16/2025 | Contractor BOBBY J ENTERPRISE | PL WORK FILED WITH GC AND MH IN THE COMBINATION OF APTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00503371 ↗ | 74 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 04/11/2022 | 01/08/2025 | Contractor WA CONTRACTING CORP | RESTORATION OF EXISTING MASONRY CHIMNEY INCLUDING CAPPING OF EXISTING INACTIVE FLUES. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B01049314 ↗ | 2760 WEST 22 STREET BROOKLYN | Alteration CO | Permit Issued | 05/24/2024 | 11/19/2024 | Owner HELM EQUITIES Contractor COAST BUILDING MANAGEMENT | Application filed to correct certificate of occupancy 3428960 as to use and occupancy on the first floor only. |
| M00865054 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Signed-off | 07/24/2023 | 12/11/2023 | Contractor INTERSTATE INTERIORS INC Filer METROPOLIS GROUP INC | INSTALLATION OF 1 FOOT HIGH BY 40 FOOT WIDE MARQUEE AT BROADWAY SIDE OF BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR … |
| M00914703 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Signed-off | 08/25/2023 | 11/13/2023 | Contractor INTERSTATE INTERIORS INC Filer METROPOLIS GROUP INC | commercial non structural demolition to remove storefront glass and doors and interior non bearing partitions as per plans filed herewith. … |
| M00888246 ↗ | 220 RIVERSIDE BOULEVARD MANHATTAN | Alteration | Signed-off | 06/17/2023 | 10/26/2023 | Owner BJP RIVERSIDE REALTY LLC Contractor RED OAK RENOVATIONS CORP Filer 4444 PPPP CORP | Subsequent filing mechanical application in conjunction with General Construction for interior renovation. |
| M00810494 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Signed-off | 07/24/2023 | 08/21/2023 | Contractor INTERSTATE INTERIORS INC Filer METROPOLIS GROUP INC | Installation of temporary construction fence to protect the public during facade repair, door replacement, stair repair work as per plans fi… |
| M00810322 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Signed-off | 02/14/2023 | 07/26/2023 | Contractor INTERSTATE INTERIORS INC Filer METROPOLIS GROUP INC | Interior and exterior renovation of tenant space including removal and installation of non bearing partitions and related finishes, lighting… |
| M08040186 ↗ | 2001 BROADWAY MANHATTAN | Alteration | Signed-off | 12/08/2022 | 06/23/2023 | Contractor INTERSTATE INTERIORS INC Filer METROPOLIS GROUP INC | Interior renovation of building storage area as per plans filed herewith. No change to use, egress or occupancy. |
| B00726815 ↗ | 3101 FOSTER AVENUE BROOKLYN | Alteration | Signed-off | 06/02/2022 | 01/25/2023 | Owner CLIPPER EQUITY Contractor SUMON ABDIN Filer JM ZONING, LLC. | Selectively remove loose plaster at interior bulkhead stairway. Install 3 coat plaster finish on stainless steel wire mesh. Paint to match e… |
| M00716350 ↗ | 935 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/18/2022 | 01/10/2023 | Contractor JDM CONTRACTING SERVICES | RENOVATE APT 5B ON THE 5TH FLOOR FILED IN CONJUNCTION WITH DOB NOW PL. AS A SUBEQUENT DOCUMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00663785 ↗ | 260 BOWERY MANHATTAN | Alteration | Signed-off | 01/24/2022 | 11/18/2022 | Contractor NORMAN PROJECT MGMT LLC Filer JM ZONING, LLC. | Application filed for installation of trellis, planters, and seating in existing rear yard. No change in use, occupancy, or egress. |
| M00710823 ↗ | 58 WEST 75 STREET MANHATTAN | Alteration | Permit Issued | 05/27/2022 | 09/23/2022 | Contractor RIYA CONSTRUCTION | EXTERIOR BRICK AND STONE REPAIRS, ENTRY DOOR AND STIAR REPLACEMENT AND ROOF REPAIRS. NOCHANGE IN USE, OCCUPANCY OR EGRESS. |
| Q00587930 ↗ | 60-71 60 DRIVE QUEENS | New Building | Permit Issued | 10/07/2021 | 09/15/2022 | Contractor HOD PIPING & HEATING CORP | PROPOSED ONE STORY ACCESSORY GARAGE AS PER PLANS FILED |
| M00708002 ↗ | 109 AVENUE A MANHATTAN | Alteration | Signed-off | 04/27/2022 | 08/01/2022 | Contractor TITAN CONTRACTING CORP | INSTALLATION OF AN EXTERIOR ADA LIFT , STAIRS AND LANDING / ENTRY DOOR RECONFIGURATION. NO CHANGE TO USE,EGRESS OR OCCUPANCY. |
| M00709249 ↗ | 1767 2 AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2022 | 06/14/2022 | Contractor CARE FREE ALARMS INC Filer 4444 PPPP CORP | RENOVATION OF EXISTING COMMERCIAL KITCHEN WITHASSOCIATED WATERPROOFING, FINISH FLOOR, FINISHWALLS, FIRE RATED PARTITION, FIRE-RATED DOOR/FRA… |
| M00473497 ↗ | 125 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 03/09/2021 | 05/11/2022 | Owner GRAMERCY 15 CORPORATION Contractor KELTIC CONSTRUCTION & WOO Filer SEAY-YARBROUGH INC | Expansion of existing restroom on first floor to become ada compliant. removal of partitions and leveling of floorat restaurant entry to co… |
| M00273258 ↗ | 200 EAST 66 STREET MANHATTAN | Alteration | Signed-off | 01/28/2020 | 05/14/2021 | Contractor ADRIATIC PLBG & HTG CORP | PLUMBING WORK FILED IN CONJUNCTION WITH BIS ARCHITECTURAL APPLICATION. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M00473537 ↗ | 125 EAST 15 STREET MANHATTAN | Alteration | Signed-off | 03/09/2021 | 04/05/2021 | Owner GRAMERCY 15 CORPORATION Contractor ANTHONY DISABATO Filer SEAY-YARBROUGH INC | PLUMBING WORK TO BE COMPLETE IN EXISTING BATHROOM TO COMPLY WITH ADA REQUIREMENTS. |
| B00435321 ↗ | 136 NICHOLS AVENUE BROOKLYN | Alteration | Filed — no permit on record | 12/09/2020 | — | — | |
| M00257285 ↗ | 219 WEST 80 STREET MANHATTAN | Alteration | Signed-off | 02/03/2020 | 03/10/2020 | Owner METRO MANAGEMENT Contractor AURA PLUMBING INC Filer JM ZONING, LLC. | Plumbing work filed in conjunction with renovation of unit 1C at the cellar and 1st floor. No change to use, egress or occupancy. |
| M00213605 ↗ | 165 EAST 66TH ST MANHATTAN | Alteration | Signed-off | 09/03/2019 | 02/13/2020 | Owner 165 E 66 LLC Contractor J-TECH CONTRACTING INC Filer JM ZONING, LLC. | MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00257428 ↗ | 219 WEST 80 STREET MANHATTAN | Alteration | Signed-off | 02/03/2020 | 02/12/2020 | Owner METRO MANAGEMENT Contractor LEO KING CONTRACTING CORP Filer JM ZONING, LLC. | Mechanical ventilation work for new bathroom in unit 1C, filed in conjunction with renovation of unit 1C at the cellar and 1st floor. No cha… |
| M00211660 ↗ | 425 EAST 63 STREET MANHATTAN | Alteration | Signed-off | 09/19/2019 | 11/06/2019 | Contractor G.P. MECHANICAL CORP | PLUMBING FIXTURES IN CONJUNCTION WITH BIS APPLICATION. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M00213679 ↗ | 165 EAST 66TH ST MANHATTAN | Alteration | Signed-off | 08/28/2019 | 10/08/2019 | Contractor SEAN COAKLEY P & H INC | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00090686 ↗ | 101 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 01/15/2019 | 09/06/2019 | Contractor UNIVERSAL SIGNS & SVC INC | Installation of PARK bracket sign at the first floor facade. No change to use, egress or occupancy. |
| B00109086 ↗ | 101 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 12/21/2018 | 09/06/2019 | Owner CLIPPER EQUITY Contractor UNIVERSAL SIGNS & SVC INC Filer JM ZONING, LLC. | Installation of PROSPECT SCHOOLS bracket sign at the first floor facade. No change to use, egress or occupancy. |
| B00109090 ↗ | 101 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 12/20/2018 | 09/06/2019 | Contractor UNIVERSAL SIGNS & SVC INC | Installation of SELF STORAGE bracket sign at the first floor facade. No change to use, egress or occupancy. |
| B00109119 ↗ | 101 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 12/20/2018 | 09/06/2019 | Contractor UNIVERSAL SIGNS & SVC INC | Installation of SELF STORAGE bracket sign at the first floor facade. No change to use, egress or occupancy. |
| M00030060 ↗ | 240 WEST 98 STREET MANHATTAN | Alteration | Signed-off | 04/12/2018 | 08/06/2019 | Contractor NEW YORK CONSTRUCTION ASS | Installation of temporary construction fence as per plans filed. No change to use, egress or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 76 BEAVER STREET ↗ | 6 | 07/20/2026 |
| 2 WEST 67 STREET ↗ | 4 | 07/13/2026 |
| 6215 4 AVENUE ↗ | 7 | 07/10/2026 |
| 1251 3 AVENUE ↗ | 2 | 05/26/2026 |
| 2001 BROADWAY ↗ | 9 | 03/05/2026 |
| 150 CENTRAL PARK SOUTH ↗ | 1 | 10/01/2025 |
| 2760 WEST 22 STREET ↗ | 2 | 09/22/2025 |
| 237 EAST FORDHAM ROAD ↗ | 2 | 07/21/2025 |
| 200 EAST 66 STREET ↗ | 3 | 01/14/2025 |
| 1849 2 AVENUE ↗ | 1 | 12/02/2024 |
| 220 RIVERSIDE BOULEVARD ↗ | 3 | 10/31/2023 |
| 935 3 AVENUE ↗ | 6 | 03/24/2023 |
| 136 NICHOLS AVENUE ↗ | 3 | 05/18/2022 |
| 3101 FOSTER AVENUE ↗ | 1 | 04/27/2022 |
| 1767 2 AVENUE ↗ | 2 | 03/30/2022 |
| 260 BOWERY ↗ | 1 | 01/17/2022 |
| 60-71 60 DRIVE ↗ | 4 | 12/07/2021 |
| 125 EAST 15 STREET ↗ | 2 | 02/19/2021 |
| 219 WEST 80 STREET ↗ | 3 | 02/27/2020 |
| 101 WILLOUGHBY STREET ↗ | 6 | 09/03/2019 |
| 165 EAST 66TH ST ↗ | 3 | 08/20/2019 |
| 5123 BEACH CHANNEL DRIVE ↗ | 6 | — |
| 240 WEST 98 STREET ↗ | 1 | — |
| 425 EAST 63 STREET ↗ | 1 | — |
| 74 RIVERSIDE DRIVE ↗ | 1 | — |
| 109 AVENUE A ↗ | 1 | — |
| 58 WEST 75 STREET ↗ | 1 | — |