Miscellaneous hospital / health care facility
Mount Sinai Brooklyn Ambulatory Infusion Center
3131 KINGS HIGHWAY · Flatlands · BIN 3210426
💬 Discuss this project
1925Year Built
3Stories
I9Building Class
R4Zoning
37,417 sfGross Floor Area
1Units
LL97 Covered6 Active Violations 2 unresolved · 4 paperwork only ▸FDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: 17th Street Properties · 15,175 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMount Sinai Health SystemUnder Construction85p · 10 filings · 20 docs
BulkheadMount Sinai Health SystemUnder Construction4p · 2 filings · 20 docs
Floor 3Mount Sinai Health System52p · 4 filings · 20 docs
Floor 2Mount Sinai Health SystemUnder Construction54p · 5 filings · 20 docs
Floor 1Mount Sinai Health System49p · 6 filings · 20 docs
CellarMount Sinai Health System26p · 2 filings · 20 docs
Site & exteriorMount Sinai Health System48p · 9 filings · 20 docs
Filed — no permit issuedMount Sinai Health System5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Health System1503/21/2026
E 17th STR Properties1203/22/2026
Continuum Health Partners803/21/2026
Beth Israel Hospital103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Loring Consulting Engineers1108/12/2026
Simple Architecture106/01/2026
Architectural Preservation Studio505/21/2026
EP Engineering212/15/2025
Studio A+T Architects212/11/2025
Ashraf501/10/2025
Severud Associates408/26/2024
GKG Architect303/04/2024
Green Design112/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Consulting & ContGeneral Contractor1507/08/2026
Platinum Services NYScaffold1007/08/2026
Specialty Construction SYGeneral Contractor407/08/2026
Phoenix Sutton STRScaffold307/08/2026
B & A Restoration Contractingspecialty_contractor307/08/2026
Sato Construction CoGeneral Contractor203/21/2026
Miller Plumbing & HeatingPlumbing210/02/2026
Paul M MaintenanceGeneral Contractor208/26/2026
Capital Contracting P&HPlumbing207/08/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
Capital Contracting P & HFire Protection107/08/2026
Absolute Fire Barrier SE*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection28272608/12/2026
Building Lifecycle
All (178)Filed (36)Permit Issued (35)Signed Off (15)Violation (35)Inspection (13)Objection (14)Special Inspection (30)
10/01/2026
Permit issued — Plumbing
B00940095-S2-PL
08/27/2026
Permit issued — Plumbing
B00940095-S2-PL
08/25/2026
Permit issued — Mechanical Systems
B00940095-S1-MS
08/25/2026
Permit issued — General Construction
B00940095-I1-GC
08/12/2026
Filed — Alteration
Herewith filing Mechanical modifications for Mount Sinai Orthopedics Clinic Extension. No change in use, egress, or occupancy.
B00940095-S2
08/12/2026
Filed — Alteration
Herewith filing Mechanical modifications for Mount Sinai Orthopedics Clinic Extension. No change in use, egress, or occupancy.
B00940095-S1
07/16/2026
Permit issued — Suspended Scaffold
B01409052-I1-SC
07/13/2026
Objection resolved — Addressed
07/09/2026
Objection raised — Other
06/30/2026
Filed — Alteration
OUTRIGGER PLAN FOR HOIST
B01409052-I1
06/01/2026
Filed — Alteration
Herewith filing Mechanical modifications for Mount Sinai Orthopedics Clinic Extension. No change in use, egress, or occupancy.
B00940095-I1
06/01/2026
Permit issued — General Construction
B01391296-I1-GC
05/21/2026
Filed — Alteration
Mount Sinai - Midwood Partial Roof Replacement - Filing for general construction modifications to Roof A and Roof C as per plans filed herewith. No change in use, egress, or occupancy.
B01391296-I1
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Sandeep Sikka
04/22/2026
Special inspection requirement — Final
Sandeep Sikka
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Sandeep Sikka
04/22/2026
Special inspection requirement — Masonry
JONAR MADRIAGA
04/22/2026
Special inspection requirement — Insulation placement and R values
Sandeep Sikka
04/22/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
04/09/2026
Permit issued — General Construction
B01092466-I1-GC
02/04/2026
Violation issued (ECB, open)
Construction
02/02/2026
Violation issued (FDNY_NOV, closed)
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/21/2026
Permit issued — General Construction
B01330613-I1-GC
01/20/2026
Permit issued — Plumbing
B01330613-S2-PL
12/15/2025
Filed — Alteration
Mount Sinai Brooklyn Infusion offices - Mechanical modifications to include relocating air outlets and associated duct work as shown on plans filed herewith. No change in egress, occupancy, or use.
B01330613-S2
12/12/2025
Filed — Alteration
Mount Sinai Brooklyn Infusion offices - Mechanical modifications to include relocating air outlets and associated duct work as shown on plans filed herewith. No change in egress, occupancy, or use.
B01330613-S1
12/11/2025
Filed — Alteration
Mount Sinai Brooklyn Infusion offices - Mechanical modifications to include relocating air outlets and associated duct work as shown on plans filed herewith. No change in egress, occupancy, or use.
B01330613-I1
12/11/2025
Violation issued (ECB, open)
Construction
12/11/2025
Violation issued (ECB, open)
Construction
12/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Final
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/22/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01107369-I1
09/02/2025
Permit issued — Supported Scaffold
B01107369-I1-SF
09/02/2025
Permit issued — Sidewalk Shed
B01107369-I1-SH
08/12/2025
Permit issued — Structural
B01092466-S1-ST
04/01/2025
Signed off — Alteration
plumbing modifications as indicated on the plans filed herewith. No change in use, egress or occupancy.
B00681463-I1
04/01/2025
Permit issued — General Construction
B01092466-I1-GC
03/21/2025
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
03/11/2025
Signed off — Alteration
MECHANICAL MODIFCIATIONS INCLUDING THE INSTALLATION OF AC UNIT AND ASSOCIATED DUCT AND PIPING AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00631422-I1
02/27/2025
Signed off — Alteration
STRUCTURAL MODIFICATIONS ON THE ROOF AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00642783-I1
02/26/2025
Filed — Alteration
MECHANICAL MODIFCIATIONS INCLUDING THE INSTALLATION OF AC UNIT AND ASSOCIATED DUCT AND PIPING AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00631422-P1
02/26/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
02/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
02/26/2025
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/26/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/26/2025
Special inspection requirement — Final
JONAR MADRIAGA
02/12/2025
Signed off — Alteration
PARTITIONS, DOORS AND CEILIING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00631433-I1
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMiller Plumbing & Heating10/01/2026
DOB NOWPlumbingSigned-offMiller Plumbing & Heating08/27/2026
DOB NOWMechanical SystemsPermit IssuedPaul M Maintenance08/25/2026
DOB NOWGeneral ConstructionPermit IssuedPaul M Maintenance08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedB&A Restoration Contracting07/16/2026
DOB NOWGeneral ConstructionPermit IssuedB & A Restoration Contracting06/01/2026
DOB NOWGeneral ConstructionPermit IssuedSpecialty Construction SY04/09/2026
DOB NOWGeneral ConstructionPermit IssuedAbsolute Fire Barrier SE*01/21/2026
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co01/20/2026
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY09/02/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/02/2025
DOB NOWStructuralPermit IssuedSpecialty Construction SY08/12/2025
DOB NOWGeneral ConstructionPermit IssuedSpecialty Construction SY04/01/2025
DOB NOWGeneral ConstructionPermit IssuedSpecialty Construction SY12/03/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/11/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/11/2024
DOB NOWStructuralSigned-offB & A Restoration Contracting01/09/2024
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont06/30/2023
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont03/28/2023
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont03/15/2023
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont03/13/2023
DOB NOWStructuralSigned-offCentral Consulting & Cont09/14/2022
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont07/25/2022
DOB NOWStructuralSigned-offCentral Consulting & Cont07/25/2022
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont07/25/2022
DOB NOWPlumbingSigned-offCapital Contracting P&H07/19/2022
DOB NOWSprinklersSigned-offCapital Contracting P & H07/19/2022
DOB NOWPlumbingSigned-offCapital Contracting P&H06/07/2022
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont04/20/2022
DOB NOWStructuralSigned-offSato Construction Co04/19/2022
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY04/07/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY04/07/2022
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont03/29/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR12/27/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR12/30/2020
BISSDISSUEDMega Plumbing02/08/2019
BISSDISSUEDMega Plumbing02/15/2018
BISEQISSUEDPhoenix Sutton STR05/30/2017
BISEQISSUEDPhoenix Sutton STR05/15/2017
BISSPISSUEDFull Capacity Fire05/12/2017
+ 23 more permits on file
1 project · most recent 08/12/2026
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedPaul M MaintenanceAssociated Ducts and Piping, Heating Systems
Heating
Neptronic N/A 1,050 CFM · Electric Heater ×5
Ducts & Piping
Greenheck CSP-A700 550 CFM · Exhaust Fan ×1
__Junk__ N/A 550 CFM ×1
2 projects · most recent 08/12/2026
Water/Sanitary
FiledStatusContractorScope
08/12/2026Signed-offJD Plumbing & Heating MaintenanceWater/Sanitary
12/15/2025Signed-offNew York Park Plumbing & Heating CoWater/Sanitary
10 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedPM Electrical MaintenanceGeneral Wiring
08/31/2026Permit IssuedPM Electrical Maintenance—
01/18/2026CompleteTM Select ElectricGeneral Wiring
09/11/2024CompleteRichard Neu—
07/23/2024CompleteNew Age Electrical ContractingGeneral Wiring
02/04/2024Permit IssuedMedco Electrical ContrngGeneral Wiring
10/03/2023Permit IssuedNew Age Electrical ContractingGeneral Wiring
03/30/2023CompleteBorowide Elect'l Contractors—
03/23/2022CompleteIlluminous ElectricGeneral Wiring
12/18/2020CompleteElpo Electrical Contg—
1 project · most recent 06/30/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/30/2026Permit IssuedB&A Restoration ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
03/21/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
03/21/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
04/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
05/21/2026Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
05/21/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
04/22/2026Air barrier - visual inspectionSandeep Sikkaenergy_progress
04/22/2026FinalSandeep Sikkaprogress
04/22/2026Energy Code Compliance InspectionsSandeep Sikkaprogress
04/22/2026Post-installed AnchorsJONAR MADRIAGAspecial
04/22/2026MasonryJONAR MADRIAGAspecial
04/22/2026Insulation placement and R valuesSandeep Sikkaenergy_progress
12/08/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
12/08/2025FinalJONAR MADRIAGAprogress
12/08/2025Post-installed AnchorsJONAR MADRIAGAspecial
12/08/2025Exhaust and Vent Systems in Plenums and DuctsJONAR MADRIAGAspecial
12/08/2025Mechanical SystemsJONAR MADRIAGAspecial
12/08/2025Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
02/26/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/26/2025Shutoff dampersJONAR MADRIAGAenergy_progress
02/26/2025Maintenance informationJONAR MADRIAGAenergy_progress
02/26/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/26/2025Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
02/26/2025HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
02/26/2025FinalJONAR MADRIAGAprogress
02/26/2025Mechanical SystemsJONAR MADRIAGAspecial
02/06/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/06/2025Shutoff dampersJONAR MADRIAGAenergy_progress
02/06/2025Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
Latest 25 of 111.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemMedical / HealthcareEntire building
Project B01409052 Alteration · Permit Entire · 06/30/2026
Project B00940095 Alteration · Permit Entire · 06/01/2026
Project B01391296 Alteration · Permit Entire · 05/21/2026
Project B01330613 Alteration · Permit Entire · 12/11/2025
Project B01155251 Alteration · Approved · 12/12/2024
Project B00968963 Alteration · LOC Issued · 12/19/2023
Project B00845113 Alteration · LOC Issued · 03/23/2023
Project B00766033 Alteration · LOC Issued · 07/13/2022
Project B00766055 Alteration · LOC Issued · 07/13/2022
Project B00766112 Alteration · LOC Issued · 07/13/2022
Project B00766134 Alteration · LOC Issued · 07/13/2022
Project B00766150 Alteration · LOC Issued · 07/13/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 406 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch32
09/01/2026B00577877-P1Request digital key ↗
08/30/2026B00631433-P1Request digital key ↗
08/30/2026B00631433-I1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00445219-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION21
08/22/2022340507491Open ↗
08/22/2022340503459Open ↗
05/25/2017340507491Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION20
05/25/2017340507491Open ↗
05/16/2017321559577Open ↗
05/15/2017340503459Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/01/2017321494067Open ↗
▸Seals & Professional Certifications193
▸DOB NOWProgress Inspector Seal & Signature65
09/25/2026B00445219-I1Open ↗
09/05/2026B01092466-I1Open ↗
09/05/2026B01092466-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
10/05/2026B00577877-P1Open ↗
10/05/2026B00577877-P1Open ↗
09/05/2026B01092466-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/02/2026B00445219-I1Open ↗
09/01/2026B00577877-I1Open ↗
09/01/2026B00577877-P1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
08/18/2017321494094Open ↗
08/18/2017321494094Open ↗
08/14/2017321559577Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
05/25/2017340507491Open ↗
05/12/2017340503459Open ↗
04/27/2017321559577Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/30/2016321494067Open ↗
12/30/2016321494094Open ↗
04/27/2016321375551Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/25/2017340507491Open ↗
05/12/2017340503459Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/25/2017340507491Open ↗
05/12/2017340503459Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/22/2010320229365Open ↗
02/12/2008310083833Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/03/2017321494067Open ↗
▸BISPC FULL REPORT1
02/12/2008310083833Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
01/03/2017321494067Open ↗
12/30/2016321494094Open ↗
04/27/2016321375551Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
04/03/2019321465561Open ↗
12/11/2013320476613Open ↗
▸BISEQUIPMENT USE PERMITS1
03/18/2011320229365Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/16/2008310083833Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/17/2011320229365Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
05/25/2017340507491Open ↗
05/12/2017340503459Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/30/2026B00631433-I1Open ↗
08/30/2026B00631433-P1Open ↗
08/30/2026B00642783-P1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
04/27/2017321559577Open ↗
01/03/2017321494067Open ↗
12/30/2016321494094Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/12/2008310083833Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/22/2010320229365Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B00577877-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/27/2017321559577Open ↗
01/03/2017321494067Open ↗
04/27/2016321375551Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
08/30/2026B00631422-I1Open ↗
08/13/2026B00631433-I1Open ↗
08/13/2026B00577877-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/02/2020321494067Open ↗
11/02/2020321494067Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/12/2020321494067Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/23/2020321494067Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/11/2022340503459Open ↗
08/11/2022340507491Open ↗
10/23/2020321494067Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/22/2022340507491Open ↗
08/22/2022340503459Open ↗
11/12/2020321494067Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/30/2026B00631433-I1Open ↗
08/30/2026B00631433-P1Open ↗
08/30/2026B00642783-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/03/2015321138023Open ↗
06/04/2012320476613Open ↗
10/22/2010320229365Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
08/11/2022340503459Open ↗
08/11/2022340507491Open ↗
08/11/2022340507491Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/15/2026B00577877-I1Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
11/02/2020321494067Open ↗
10/23/2020321494067Open ↗
04/03/2019321465561Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET16
04/27/2017321559577Open ↗
01/04/2017321494067Open ↗
01/03/2017321494094Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM2
04/03/2019321465561Open ↗
09/25/2017321494094Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/25/2017340507491Open ↗
05/12/2017340503459Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications2
08/14/2026B01409052-I1Open ↗
08/13/2026B01155251-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00968963-I1Open ↗