Elevator apt, fireproof without stores
Patterson (NYCHA)
315 EAST 143RD STREET · Mott Haven-Port Morris · BIN 2091122
💬 Discuss this project
1950Year Built
13Stories
D3Building Class
R6Zoning
870,740 sfGross Floor Area
867Units
LL97 Covered6 Active Violations 3 unresolved · 3 paperwork only 1 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 327,000 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLL11 related repairs projectUnder Construction5p · 5 filings · 20 docs
BulkheadLL11 related repairs projectUnder Construction1p · 1 filing · 15 docs
Floor 3Suspended scaffold and material hoist installation2p · 1 filing · 11 docs
Floor 2Patterson Houses roofing and rooftop renovations1 filing · 6 docs
Floor 1Low pressure steam piping pneumatic testing4p · 1 filing · 13 docs
CellarHot water heater and vacuum pump replacement7p · 3 filings · 16 docs
Site & exteriorLL11 related repairs projectUnder Construction27p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5207/08/2026
NYC Department of Housing Preservation and Development303/21/2026
Capital Projects103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pace Engineering303/09/2026
An Consulting Engineering202/07/2025
Urbahn Architects102/04/2025
RI Consulting Services112/16/2024
Joel Phagoo P.E211/02/2024
Ibs Dba Engineered Solutions408/03/2022
Justin Pechar102/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York403/21/2026
Joel Phagoo P.E203/21/2026
Eurocelt Expediting603/21/2026
Socotec603/21/2026
Smep Design & Consultation203/21/2026
K & M Associates503/21/2026
Joel Phagoo P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Mechanicalspecialty_contractor2307/08/2026
J & N Construction GroupScaffold507/08/2026
J & N Construction GroupGeneral Contractor207/08/2026
A & S ElectricElectrical203/21/2026
Charles A DiminoPlumbing207/08/2026
Elite ElectricalElectrical103/21/2026
Lit Mode Electrical ContgElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na6902303/09/2026
Joel Phagoo, PE2416212/01/2025
RI Consulting Services8904101/22/2025
Ventrop Engineering Consulting450302/18/2022
Building Lifecycle
All (123)Filed (18)Permit Issued (26)Signed Off (5)Facade (FISP) (19)Violation (22)Inspection (2)Objection (4)Special Inspection (27)
06/08/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01299594-I1
04/14/2026
Permit issued — General Construction
X01165099-I1-GC
03/09/2026
Filed — Alteration
Building # 12: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy.
X01165099-P2
03/05/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
03/05/2026
Special inspection requirement — Final
IBRAHIM MOURAD
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
01/13/2026
Filed — Alteration
Building # 12: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy.
X01165099-P1
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
01/09/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
01/09/2026
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
01/09/2026
Special inspection requirement — Final
IBRAHIM MOURAD
01/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
12/04/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
12/01/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01238465-P1
11/26/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
10/29/2025
Permit issued — Construction Fence
X01129766-I1-FN
10/29/2025
Permit issued — Sidewalk Shed
X01129767-I1-SH
10/20/2025
Permit issued — Suspended Scaffold
X01299594-I1-SC
10/15/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
X01299594-I1
09/29/2025
Permit issued — Suspended Scaffold
X01238465-I1-SC
09/19/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01238465-I1
07/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2025
Permit issued — General Construction
X01165099-I1-GC
02/25/2025
Filed — Alteration
Building # 12: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy.
X01165099-I1
02/20/2025
Objection resolved — Addressed
02/19/2025
Objection raised — Admin
02/07/2025
Filed — Alteration
B12 PATTERSON HOUSES. RENOVATION AND REPAIRS TO BULKHEAD AND ROOF AS PER PLANS FILED HEREWITH. WINDOW REPLACEMENT AND NEW INFILL WALL AT 2ND FLOOR DIRECTLY ABOVE SETBACK ROOF ABOVE BUILDING ENTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01153245-S1
02/04/2025
Filed — Alteration
B12 PATTERSON HOUSES. RENOVATION AND REPAIRS TO BULKHEAD AND ROOF AS PER PLANS FILED HEREWITH. WINDOW REPLACEMENT AND NEW INFILL WALL AT 2ND FLOOR DIRECTLY ABOVE SETBACK ROOF ABOVE BUILDING ENTRY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01153245-I1
01/27/2025
Permit issued — Suspended Scaffold
X01142153-I1-SC
01/27/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
01/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2025
Filed — Alteration
SUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
X01142153-I1
12/24/2024
Special inspection requirement — Structural Steel - Welding
12/24/2024
Special inspection requirement — Masonry
12/24/2024
Special inspection requirement — Post-installed Anchors
12/24/2024
Special inspection requirement — Concrete - Cast-In-Place
12/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/24/2024
Special inspection requirement — Structural Steel - Details
12/18/2024
Permit issued — Supported Scaffold
X01144332-I1-SF
12/16/2024
Filed — Alteration
X01144332-I1
12/11/2024
Special inspection requirement — Final
11/13/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
11/13/2024
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
11/07/2024
Permit issued — Construction Fence
X01129766-I1-FN
11/06/2024
Permit issued — Sidewalk Shed
X01129767-I1-SH
11/02/2024
Filed — Alteration
X01129767-I1
11/02/2024
Filed — Alteration
X01129766-I1
10/07/2022
Violation issued (ECB, open)
Construction
10/05/2022
Cycle 9 facade report submitted
09/02/2022
Cycle 9 facade inspection completed
08/30/2022
Signed off — Alteration
X00672679-I1
08/12/2022
Signed off — Alteration
Replacing hot water heaters and vacuum pumps with related piping
X00649298-I1
08/09/2022
Signed off — Alteration
Related mechanical work for hot water heater replacement and vacuum pumps
X00649295-I1
08/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2022
Filed — Alteration
Replacing hot water heaters and vacuum pumps with related piping
X00649298-P1
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/19/2022
Permit issued — Plumbing
X00649298-I1-PL
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ & N Construction Group04/14/2026
DOB NOWConstruction FencePermit IssuedJ & N Construction Group10/29/2025
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group10/29/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System10/20/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group09/29/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N Construction Group04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group01/27/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N Construction Group12/18/2024
DOB NOWConstruction FencePermit IssuedJ & N Construction Group11/07/2024
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group11/06/2024
DOB NOWPlumbingSigned-offCharles A Dimino04/19/2022
DOB NOWStructuralSigned-offMaric Mechanical03/22/2022
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/21/2022
DOB NOWStructuralSigned-offMaric Mechanical03/07/2022
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/03/2022
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/17/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/17/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/17/2020
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/11/2020
BISOTISSUEDSharan Builders05/05/2014
BISEQISSUEDSharan Builders04/21/2014
BISEQISSUEDTalico Contracting03/31/2014
BISEQISSUEDSharan Builders03/07/2014
BISEQISSUEDM.S.S. Construction03/06/2013
BISOTISSUEDZoria Housing12/18/2012
BISEQISSUEDZoria Housing12/14/2012
BISEQISSUEDVikrant Contracting & Builder12/14/2012
BISEQISSUEDM.S.S. Construction06/04/2012
BISPLISSUEDBrennan Brothers Co05/12/2006
BISOTISSUEDDanco01/24/2005
BISPLISSUEDDanco01/21/2005
BISOTISSUEDAmerican Mechanical09/24/2003
BISPLISSUEDAmerican Mechanical08/29/2002
+ 6 more permits on file
6 projects · most recent 10/13/2026
General Wiring
FiledStatusContractorScope
10/13/2026Permit IssuedAujla Electric—
04/04/2026Permit IssuedLit Mode Electrical Contg—
04/04/2026Permit IssuedLit Mode Electrical Contg—
10/14/2024Permit IssuedLit Mode Electrical Contg—
12/16/2021CompleteA.T.J. Electrical CoGeneral Wiring
03/28/2019Permit IssuedEia ElectricGeneral Wiring
2 projects · most recent 12/01/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/01/2025Permit IssuedJ&N Construction Group1 scope_items
02/07/2025——Steel, Concrete, Masonry
2 projects · most recent 12/01/2025
Suspended Scaffold
FiledStatusContractorScope
12/01/2025Permit IssuedJ&N Construction GroupSuspended Scaffold
10/15/2025Signed-offStructural Preservation SystemSuspended Scaffold
3 projects · most recent 12/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/01/2025Permit IssuedJ&N Construction GroupSuspended Scaffold (SC)
10/15/2025Signed-offStructural Preservation System—
01/22/2025Permit IssuedJ&N Construction GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/05/2026MasonryIBRAHIM MOURADspecial
03/05/2026FinalIBRAHIM MOURADprogress
03/05/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
03/05/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
01/09/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
01/09/2026MasonryIBRAHIM MOURADspecial
01/09/2026Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
01/09/2026FinalIBRAHIM MOURADprogress
01/09/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
12/04/2025Post-installed AnchorsJOEL PHAGOOspecial
11/26/2025Post-installed AnchorsJOEL PHAGOOspecial
01/23/2025Tenant Protection Plan Compliance—special
12/24/2024Structural Steel - Welding—special
12/24/2024Masonry—special
12/24/2024Post-installed Anchors—special
12/24/2024Concrete - Cast-In-Place—special
12/24/2024Structural Stability – Alterations of existing buildings—special
12/24/2024Structural Steel - Details—special
12/11/2024Final—progress
11/13/2024Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
11/13/2024Post-installed AnchorsMd Istiaque Hasanspecial
01/24/2020FinalWailoon Wongprogress
01/24/2020Heating SystemsWailoon Wongspecial
01/24/2020Mechanical SystemsWailoon Wongspecial
01/24/2020HVAC insulation and sealing Wailoon Wongenergy_progress
Latest 25 of 27.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
08/24/2026X00672679-I1Request digital key ↗
08/24/2026X00649295-I1Request digital key ↗
08/24/2026X00649298-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00303501-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00227524-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
11/04/2019220715554Open ↗
10/30/2019220715554Open ↗
06/05/2015220358681Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION9
05/13/2014220358681Open ↗
04/18/2014240055603Open ↗
04/02/2014220361757Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/28/2015220361757Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026X00227524-I1Open ↗
08/24/2026X00672679-I1Open ↗
08/24/2026X00649295-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/09/2020220715554Open ↗
11/04/2019220715554Open ↗
09/22/2017220358681Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026X00303501-I1Open ↗
09/01/2026X00303501-I1Open ↗
08/24/2026X01165099-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00303501-I1Open ↗
09/01/2026X00303501-I1Open ↗
09/01/2026X00303501-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/18/2014240055603Open ↗
04/02/2014220361757Open ↗
12/18/2012240014122Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/18/2014240055603Open ↗
12/18/2012240014122Open ↗
12/13/2012240014088Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/18/2014240055603Open ↗
12/18/2012240014122Open ↗
12/13/2012240014088Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/02/2014220361757Open ↗
06/05/2012220208273Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/05/2012220208273Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
03/10/2020220715554Open ↗
11/04/2019220715554Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026X00227524-I1Open ↗
08/13/2026X00303501-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00672679-I1Open ↗
08/24/2026X00649295-I1Open ↗
08/24/2026X00649298-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/22/2017220358681Open ↗
05/13/2014220358681Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/18/2012240014122Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/04/2019220715554Open ↗
09/22/2017220358681Open ↗
03/19/2014220358681Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/20/2017220358681Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/18/2014240055603Open ↗
12/18/2012240014122Open ↗
12/13/2012240014088Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs38
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/26/2026X00227524-I1Open ↗
08/24/2026X00672679-I1Open ↗
08/24/2026X00649298-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/04/2019220715554Open ↗
07/17/2015240055603Open ↗
03/12/2014220208273Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/29/2017220358681Open ↗
09/20/2017220358681Open ↗
10/28/2015220361757Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER2
03/12/2014220208273Open ↗
03/06/2013220208273Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00227524-I1Open ↗
08/13/2026X00303501-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026X00227524-I1Open ↗
08/13/2026X00303501-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/05/2012220208273Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/17/2026X01165099-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/04/2019220715554Open ↗
09/20/2017220358681Open ↗
06/09/2015220358681Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET4
11/04/2019220715554Open ↗
04/02/2014220361757Open ↗
03/19/2014220358681Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/18/2014240055603Open ↗
12/18/2012240014122Open ↗
12/13/2012240014088Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
03/09/2020220715554Open ↗
06/05/2015220358681Open ↗
▸BISBOROUGH INTAKE FORM1
09/20/2017220358681Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications3
08/13/2026X01238465-P1Open ↗
08/13/2026X01238465-I1Open ↗
08/13/2026X01142153-I1Open ↗
▸DOB NOWCalculations3
08/13/2026X01238465-P1Open ↗
08/13/2026X01142153-I1Open ↗
08/13/2026X01238465-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01299594-I1Open ↗