← Back
Elevator apt, fireproof with stores
Independence Plaza
310 GREENWICH STREET · Tribeca-Civic Center · BIN 1083241
💬 Discuss this project
1975Year Built
39Stories
D6Building Class
C6-4Zoning
1,970,736 sfGross Floor Area
1,349Units
LL97 CoveredRent Stabilized82 Open Violations 60 unresolved · 22 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: IP MORTGAGE BORROWER LLC · 186,631 sf lot · 10.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 6Under Construction1p · 2 filings · 12 docs
Floor 5
Floor 4
Floor 3
Floor 2Under Construction1p · 1 filing · 6 docs
Floor 1Under Construction55p · 10 filings · 20 docs
CellarUnder Construction28p · 6 filings · 20 docs
Sub-Basement7p · 2 filings · 20 docs
Filed — no permit issued3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKI RENOVATIONS GROUP807/08/2026
STELLAR MANAGEMENT5807/08/2026
IP MORTGAGE BORROWER1303/22/2026
ANGLE GREENWICH ASSOC303/21/2026
WASHINGTON PLAZA TOW203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING203/21/2026
J A EXPEDITING1403/21/2026
METROPOLIS GROUP INC1803/21/2026
YBL NY403/21/2026
BSGNY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & L SERVICE NYC INCGeneral Contractor707/08/2026
RJB CONTRACTING CARTING CORPGeneral Contractor303/21/2026
SPEEDWAY PLUMBING CORPPlumbing207/08/2026
PASQUERELLA, JOHNElectrical203/21/2026
RYPKA III, FRANKElectrical203/21/2026
SPEEDWAY PLUMBING CORPFire Protection207/08/2026
AKI RENOVATIONS GROUP INCGeneral Contractor207/08/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
NICOLA RANIERIElectrical103/21/2026
ECONAIR SUPPLY INCGeneral Contractor107/08/2026
OMD ELECTRICAL CORPElectrical103/22/2026
LCS RESTORATION CORPGeneral Contractor104/09/2026
OLIVER CHRISTOPHERElectrical103/21/2026
RANIERI NICOLAElectrical103/21/2026
FLYTIGER P & H LTDPlumbing107/08/2026
FLYTIGER PLB & HTG LTDFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY ENGINEERING PLLC5149607/25/2024
AA BUILDING & INSPECTION1519110/24/2023
TARIQ M. BASHIR, P.E.5915110/24/2023
DELTA TESTING LABS687609/28/2022
ALL CITY ENGINEERING PC7115211/04/2020
KL INNOVATIVE DESIGN INC7225209/04/2020
Building Lifecycle
All (106)Filed (27)Permit Issued (16)Signed Off (6)Violation (21)Inspection (6)Special Inspection (30)
01/27/2026
Violation issued (ECB, open)
Unknown
12/18/2025
Permit issued — Structural
M00936043-I1-GC-CX
07/17/2025
Signed off — Alteration
MODIFICATIONS TO EXISTING PLUMBING AT RETAIL SPACES
M00297971-I1
08/22/2024
Signed off — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-I1
07/25/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P3
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
07/25/2024
Special inspection requirement — Duct leakage testing, insulation and design
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
07/25/2024
Special inspection requirement — Final
ERIC BERLENT
07/25/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
06/20/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P2
02/15/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P1
12/18/2023
Violation issued (HPD, closed)
A
11/02/2023
Signed off — Alteration
Filing application for plumbing work at 1st floor commerical space. No change in use, egress or occupancy.
M00659020-I1
11/01/2023
Signed off — Alteration
Filing application for the interior renovation of existing commercial space. No change in use or occupancy.
M00658942-I1
10/24/2023
Filed — Alteration
M00936043-I1
09/19/2023
Special inspection requirement — Final
TARIQ BASHIR
09/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
TARIQ BASHIR
07/25/2023
Permit issued — Mechanical Systems
M00659078-I1-MS
06/23/2023
Violation issued (ECB, open)
Construction
12/13/2022
Signed off — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH STOREFRONT RENOVATION
M00275553-I1
12/01/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2022
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Final
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
09/28/2022
Filed — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH STOREFRONT RENOVATION
M00275553-P1
09/21/2022
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/02/2022
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING AT RETAIL SPACES
M00297971-P3
09/02/2022
Filed — Alteration
SPRINKLER MODIFICATIONS ASSOCIATED WITH RENOVATION AT RETAIL SPACES
M00297973-P2
08/09/2022
Permit issued — Sprinklers
M00297973-I1-EW-SP
06/24/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/22/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/03/2022
Signed off — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-I1
05/17/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2022
Filed — Alteration
Filing application for plumbing work at 1st floor commerical space. No change in use, egress or occupancy.
M00659020-P1
05/04/2022
Filed — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-P1
05/04/2022
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
05/04/2022
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
04/26/2022
Permit issued — Sprinklers
M00717153-I1-EW-SP
04/19/2022
Filed — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-I1
04/07/2022
Permit issued — Plumbing
M00659020-I1-PL
04/04/2022
Permit issued — Mechanical Systems
M00659078-I1-MS
03/24/2022
Permit issued — General Construction
M00658942-I1-GC
03/18/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLCS RESTORATION CORP12/18/2025
DOB NOWMechanical SystemsSigned-offJ & L SERVICE NYC INC07/25/2023
DOB NOWSprinklersPermit IssuedSPEEDWAY PLUMBING CORP08/09/2022
DOB NOWSprinklersSigned-offFLYTIGER PLB & HTG LTD04/26/2022
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD04/07/2022
DOB NOWMechanical SystemsSigned-offJ & L SERVICE NYC INC04/04/2022
DOB NOWGeneral ConstructionSigned-offJ & L SERVICE NYC INC03/24/2022
DOB NOWPlumbingSigned-offSPEEDWAY PLUMBING CORP08/11/2021
DOB NOWMechanical SystemsPermit IssuedECONAIR SUPPLY12/24/2020
DOB NOWSprinklersPermit IssuedSPEEDWAY PLUMBING CORP10/15/2020
DOB NOWPlumbingSigned-offSPEEDWAY PLUMBING CORP10/14/2020
DOB NOWSprinklersPermit IssuedQMB PLUMBING & HTG INC08/21/2020
DOB NOWMechanical SystemsPermit IssuedRJB CONTRACTING CARTING C06/15/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/10/2020
DOB NOWStructuralSigned-offAKI RENOVATIONS GROUP INC06/10/2020
DOB NOWConstruction FencePermit IssuedAKI RENOVATIONS GROUP INC01/16/2020
BISOTISSUEDTHE HARVEY GROUP LLC04/12/2021
BISOTISSUEDCUBE BUILDERS GROUP NY03/30/2021
BISOTISSUEDAKI RENOVATIONS GROUP INC01/05/2021
BISOTISSUEDCUBE BUILDERS GROUP NY12/02/2020
BISOTISSUEDAKI RENOVATIONS GROUP INC06/24/2020
BISOTISSUEDSMVP MGMT INC02/19/2020
BISOTISSUEDAKI RENOVATIONS GROUP INC02/14/2020
BISOTISSUEDAKI RENOVATIONS GROUP INC02/03/2020
BISOTISSUEDTHE HARVEY GROUP LLC09/13/2019
BISOTISSUEDTHE HARVEY GROUP LLC01/22/2019
BISOTISSUEDTHE HARVEY GROUP LLC08/23/2018
BISOTISSUEDAKI RENOVATIONS GROUP INC05/09/2017
BISOTISSUEDAKI RENOVATIONS GROUP INC01/03/2017
BISOTISSUEDAKI RENOVATIONS GROUP INC11/03/2016
BISOTISSUEDAKI RENOVATIONS INC03/07/2014
BISOTISSUEDAKI RENOVATIONS INC03/07/2014
BISEQISSUEDSPRING ENTERPRIS INC.04/01/2002
BISEQISSUEDSPRING ENTERPRIS INC.03/26/2001
BISMHISSUEDNURMINEN CONSTRUCTION OF03/09/2001
BISPLISSUEDMETRO MECHANICAL GROUP IN02/23/2001
BISFPISSUEDSENTINEL FIRE CTRL INC02/21/2001
BISEQISSUEDSPRING ENTERPRIS INC.11/08/2000
BISEQISSUEDATLANTIC HEYDT CORP12/17/1998
BISEQISSUEDEMPIRE HEYDT SCAFFOLD02/23/1998
+ 5 more permits on file
1 project · most recent 11/04/2020
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2020Permit IssuedECONAIR SUPPLY INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×3
PUHY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×2
PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×2
PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PUHY-EP144TNU-A 160,000 BTU · Vrf Outdoor ×3
PUHY-EP96TNU-A 108,000 BTU · Vrf Outdoor ×2
PUHY-EP72TNU-A 80,000 BTU · Vrf Outdoor ×1
— PUHY-EP120TNU-A 135,000 BTU · Condensing Unit ×2
1 project · most recent 09/02/2022
FiledStatusContractorScope
09/02/2022Permit IssuedSPEEDWAY PLUMBING CORP—
1 project · most recent 09/04/2020
Water/Sanitary
FiledStatusContractorScope
09/04/2020Signed-offPIPESTYLISTS, INCWater/Sanitary
5 projects · most recent 02/07/2023
General Wiring
FiledStatusContractorScope
02/07/2023Permit IssuedOMD ELECTRICAL CORP5 meters, 1 new_meters
04/06/2022CompleteFIRST STAR ELECTRIC INCGeneral Wiring
11/02/2020Permit IssuedFIVE STARS ELEC'L CONTR'GGeneral Wiring
08/20/2020CompleteFIVE STARS ELEC'L CONTR'G—
02/12/2019Permit IssuedI.K.E. ELECTRICAL CORP.—
1 project · most recent 11/03/2020
Steel
FiledStatusContractorScope
11/03/2020——Steel
1 project · most recent 05/05/2020
Fence
FiledStatusContractorScope
05/05/2020Permit IssuedAKI RENOVATIONS GROUP INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
07/25/2024Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
07/25/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
07/25/2024Duct leakage testing, insulation and designSUNGBOM YIenergy_progress
07/25/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
07/25/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
07/25/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
07/25/2024FinalERIC BERLENTprogress
07/25/2024Mechanical SystemsSUNGBOM YIspecial
09/19/2023FinalTARIQ BASHIRprogress
09/19/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
09/19/2023Structural Stability – Alterations of existing buildingsTARIQ BASHIRspecial
09/29/2022Structural Steel - WeldingRICHARD GREENWALDspecial
09/29/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/29/2022FinalRICHARD GREENWALDprogress
09/29/2022Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
09/29/2022Post-installed AnchorsRICHARD GREENWALDspecial
09/29/2022Structural Steel - DetailsRICHARD GREENWALDspecial
09/21/2022Sprinkler SystemsRICHARD GREENWALDspecial
09/21/2022Post-installed AnchorsRICHARD GREENWALDspecial
09/21/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/04/2022Sprinkler SystemsSUNGBOM YIspecial
05/04/2022Sprinkler SystemsSUNGBOM YIspecial
03/18/2022Post-installed AnchorsRICHARD GREENWALDspecial
03/18/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
03/18/2022Structural Steel - WeldingRICHARD GREENWALDspecial
Latest 25 of 56.
▾Documents — 328 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch10
09/02/2026M00658942-I1Request digital key ↗
09/02/2026M00659078-I1Request digital key ↗
09/02/2026M00659078-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00297971-P1Request digital key ↗
09/05/2026M00297971-I1Request digital key ↗
09/05/2026M00297971-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00297973-I1Request digital key ↗
09/04/2026M00380740-I1Request digital key ↗
08/15/2026M00297973-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00292310-I1Request digital key ↗
08/15/2026M00292310-P2Request digital key ↗
08/15/2026M00292310-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00275553-P1Request digital key ↗
09/05/2026M00275553-I1Request digital key ↗
09/04/2026M00406050-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00419162-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION23
11/14/2025123784690Open ↗
11/01/2022123784690Open ↗
10/28/2022123784690Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION12
12/02/2020140982293Open ↗
02/21/2020123839640Open ↗
02/18/2020123784690Open ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/25/2020140982293Open ↗
▸Seals & Professional Certifications116
▸DOB NOWProgress Inspector Seal & Signature29
09/02/2026M00659078-I1Open ↗
09/02/2026M00659078-I1Open ↗
09/02/2026M00659078-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00275553-P1Open ↗
09/05/2026M00275553-I1Open ↗
09/05/2026M00297971-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M00297973-I1Open ↗
09/23/2026M00297973-I1Open ↗
09/23/2026M00297973-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
02/12/2020123839640Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan9
09/05/2026M00297971-P1Open ↗
09/05/2026M00297971-I1Open ↗
09/05/2026M00297971-P3Open ↗
Showing 3 of 9 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES7
09/10/2018121191209Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
09/10/2018121191209Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00275553-I1Open ↗
09/05/2026M00275553-P1Open ↗
09/05/2026M00297971-P1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
05/01/2018140570861Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/28/2022123784690Open ↗
10/27/2022123784690Open ↗
10/27/2022123784690Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
11/25/2020140982293Open ↗
05/08/2017140637425Open ↗
11/02/2016140570861Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
03/09/2015140169582Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00658942-I1Open ↗
08/13/2026M00659078-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/30/2025123784690Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/19/2025123784690Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/30/2025123784690Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/30/2025123784690Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
10/27/2022123784690Open ↗
10/13/2022123784690Open ↗
10/12/2022123784690Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/24/2025123784690Open ↗
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
06/14/2018121191209Open ↗
03/06/2017121191209Open ↗
03/06/2017121191209Open ↗
▸BISFINAL1
10/30/2025123784690Open ↗
▸BISBSA/CPC APPROVAL1
04/24/2018121191209Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT15
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 15 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
05/08/2017140637425Open ↗
11/02/2016140570861Open ↗
03/07/2014140169476Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/21/2025123784690Open ↗
▸Filing & Intake Forms21
▸BISEFILING JOB APPLICATION COVER SHEET6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
11/01/2022123784690Open ↗
10/28/2022123784690Open ↗
03/23/2020123839640Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/23/2020123839640Open ↗
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
Showing 3 of 4 on file for this type